ASHRAE
ASHRAE 55: thermal comfort evidence and occupant surveys
Thermal comfort under ASHRAE 55-2023 is a combined assessment of the environment and the people occupying it. Air temperature, radiant conditions, humidity and air speed interact with clothing and activity. The standard provides design and existing-space evaluation methods, with the 2023 edition organized around standard and adaptive methods. A thermostat reading or a humidity band alone cannot establish conformity; the chosen method, its inputs and the resulting comfort evidence must be recorded together.
Applies to
Mechanical designers, enclosure designers, commissioning providers and facility teams use Standard 55 to define or investigate occupied-space comfort. ASHRAE 55-2023 addresses healthy adults in indoor spaces occupied for at least 15 minutes, at atmospheric pressures equivalent to elevations up to 3,000 m, approximately 10,000 feet. Its scope does not establish requirements for acoustics, lighting or air contaminants. ASHRAE Standard 55 scope
ASHRAE describes the standard's objective as thermal conditions acceptable to a substantial majority, 80%, of occupants. That objective does not promise identical comfort for every person or allow a facility to dismiss an individual complaint without identifying its cause. ASHRAE standards summary
Key topics
PMV calculations and adaptive evaluation use different inputs
ASHRAE's 2023 overview identifies standard and adaptive evaluation methods and a flowchart for selecting the applicable approach. The University of California, Berkeley CBE Thermal Comfort Tool shows the standard-method comfort zone between PMV values of -0.5 and +0.5, using the environmental and personal inputs rather than air temperature alone. Record the selected model and those inputs with the result. Local discomfort and the method's applicability conditions remain separate checks; a PMV number by itself does not document them. ASHRAE method selection; CBE comfort calculation tool
Radiant conditions explain some thermostat complaints
A person beside a cold window experiences a different radiant environment from someone at an interior workstation even when their air temperatures match. Record the complaint location, adjacent surfaces, air movement and occupant conditions. The standard's local-discomfort assessment also addresses effects such as a vertical temperature gradient; averaging the room into one value can hide the condition being investigated.
The 2026 survey revision changes the sample requirement
ASHRAE 55-2023 Addendum b specifies at least 50 survey responses for a target population of 100 occupants. Approved August 31, 2026, the addendum replaces the earlier response-rate rule with a population-based sample-size method. Establish the target population before invitations go out and retain the number of responses with the evaluation. Standard 55 Addendum b
Humidity is an input, not the entire comfort test
A project can adopt a humidity operating band for moisture control or other building objectives, but that band does not evaluate the remaining comfort factors. ASHRAE's published humidity clarification separates thermal-comfort limits from IAQ-related moisture requirements. Preserve the source of each target rather than labeling every humidity setpoint an ASHRAE 55 requirement. ASHRAE humidity clarification
How it is used in the field
For a survey covering 100 office occupants under Addendum b, 44 replies leave the minimum sample short by six. Keep that result visible even if most respondents report satisfaction. Expanding a survey from one floor to the entire building changes the target population and requires a fresh sample-size determination.
Combine occupant feedback with measurements taken at the affected work locations and operating times. Record the HVAC mode and whether a nearby fan or window was under occupant control. A complaint occurring only during morning warmup needs evidence from that period; an afternoon spot reading answers a different question.
ASHRAE's September 16, 2024 erratum corrects the Standard Effective Temperature, or SET, calculation code in Standard 55's Appendix D and a solar-adjustment cross-reference. A calculator built from the first printing needs the corrected implementation and its validation checks. Save the calculation tool and version with the comfort report so another reviewer can reproduce the result without guessing which printed algorithm was used. Standard 55 calculation corrections
ASHRAE 55-2023 Addendum a adds an optional thermal-disposition question to the informative survey guidance, asking about a person's tendency to feel warmer or colder than others. It is supplementary guidance, not a new mandatory temperature setpoint. The answer helps distinguish a localized environmental problem from differing individual thermal preferences. Standard 55 Addendum a
Edition history
Standard 55-2023 remains the published base edition at this review date. Its September 2024 errata correct calculation details. The August 2026 addenda address evaluation: Addendum a expands informative survey guidance, while Addendum b revises the minimum survey sample. Specify the corrected base text and the incorporated addenda so the calculation and survey teams work from the same document set.
Frequently asked questions
Can a comfortable room still have poor indoor air quality?
Yes. Standard 55's scope excludes nonthermal contaminants. A comfort result does not establish adequate ventilation or acceptable contaminant concentrations; those require their own IAQ evidence and applicable ventilation criteria.
Does compliance require every occupant to choose the same temperature?
No. Comfort evaluation accounts for the interaction of environmental and personal factors. Use the applicable method and documented population evidence, while retaining individual complaints as information about locations, exposure or personal comfort needs.
Sources checked
- ASHRAE: Standard 55-2023 methods and documentation
- ASHRAE: Standard 55-2023 scope and exposure limits
- ASHRAE: standards summary, 80% comfort objective
- ASHRAE: Addendum d to Standard 55-2017, humidity clarification
- ASHRAE: Addendum a to Standard 55-2023, August 31, 2026
- ASHRAE: Addendum b to Standard 55-2023, August 31, 2026
- ASHRAE: Standard 55-2023 consolidated errata, September 16, 2024
- University of California, Berkeley: CBE Thermal Comfort Tool, PMV zone and inputs