ASTM International
ASTM C1153: specifying an infrared roof survey
Specify an ASTM C1153-23 roof survey by the evidence it must deliver: usable nighttime coverage, mapped thermal anomalies and linked invasive verification. The practice covers ground and aerial investigations of above-deck insulation contacting the waterproofing. Camera reach is part of that scope: FLIR recommends at least 3 by 3 pixels on a target for a spot-temperature value. A photograph enlarged after capture adds no measurement detail and supplies no verification of wet insulation.
Applies to
Roof consultants use the practice to define investigations; owners and specifiers use it to compare survey proposals; contractors use the verified findings to develop repair quantities. Ground and aerial work both fall within ASTM's stated scope. A proposal should identify how the investigator will obtain the required evidence from each roof area, including areas that cannot be assessed from the planned viewing position.
Key topics
Specify image resolution at the roof, not only detector pixels
ASTM C1153-23 treats minimum resolvable temperature difference, spectral range, instantaneous field of view and overall field of view as separate equipment topics. Use these to compare proposals with different lenses and viewing distances. A roof plan should identify each capture position or flight area and the resolution needed there. A higher detector pixel count does not by itself establish that a more distant survey resolves smaller roof features. The drone inspection guide covers the aerial-work context.
Detection and temperature measurement need different evidence
FLIR recommends at least 3 by 3 pixels over a target when requesting a spot-temperature value. Its distance-to-size guidance distinguishes seeing a small temperature difference from measuring a representative temperature. FLIR also states that digital zoom does not improve temperature-measurement accuracy. A report that enlarges a small warm patch has changed its display size, not the amount of original measurement information captured from that patch.
Make survey coverage and verification separately deliverable
A useful coverage schedule has separate entries for roof area viewed, area with interpretable thermal contrast, mapped anomalies and physically checked locations. ASTM C1153-23 includes invasive verification within the investigation; the verification register should identify the image and assembly zone supporting each interpreted boundary. Link each opening to the layer record in the roof-core guide. That lets an estimator distinguish a measured repair boundary from an unverified thermal indication.
How it is used in the field
FLIR's E8 example assigns one pixel a width of 0.31 inch at a 10-foot target distance. Applying its 3 by 3 recommendation produces a 0.93-inch-wide measurement target. At three times that distance, the corresponding width is approximately 2.79 inches with the same optics. This is a calculation from FLIR's optical example, not an ASTM minimum wet-area size. It explains why the survey's viewing distance belongs in the equipment submittal.
A 40,000-square-foot roof with 5,000 square feet of unusable thermal imagery has 35,000 square feet of usable coverage, or 87.5%. If mapped anomalies occupy 3,500 square feet, that is 10% of usable coverage but 8.75% of the whole roof. Neither percentage establishes the condition of the missing 5,000 square feet. Show both denominators on the plan before carrying a wet-area quantity into the roof capital plan.
Specify delivery of original thermal files, corresponding visible images, acquisition times, roof-zone references and the verification register. Preserve the original measurement file when exporting an annotated picture for an estimate. Annotation should identify the interpretation without replacing the data from which it was made. Record a revised boundary as a revision so subsequent repair quantities remain traceable.
Use the infrared interpretation guide for competing thermal patterns and physical confirmation. The purchasing question on this page is whether two survey proposals provide comparable coverage, equipment information and verification evidence. A report limited to attractive images leaves those deliverables undefined.
Edition history
The active 2023 edition follows the publisher's listed C1153-10(2015) reapproval. Write the complete designation into the survey scope and proposal so the purchased investigation and the reported method identify the same publication.
Survey firms tracking roof alterations across a portfolio use scheduled asset monitoring to receive dated views and reports of visible changes through PorchRocket's Asset Search monitoring.
Frequently asked questions
Does C1153 require a particular drone brand?
ASTM's public scope specifies equipment performance topics and includes aerial inspection. Define the camera, optics and capture geometry in the proposal; an aircraft model by itself does not establish the thermal equipment's suitability.
Is a stated wet percentage enough for a repair estimate?
The estimate also needs its area denominator, mapped boundaries, usable survey coverage and linked physical verification. A percentage calculated from only the assessable area cannot silently become a percentage of the entire roof.
Does a thermal anomaly identify the point where water entered?
A warm zone beside a drain should not become a leak-origin pin on the repair drawing. ASTM C1153-23 excludes methods for identifying moisture cause or entry point. Keep the verified wet-material boundary and the water-entry investigation as separate report findings.