ANVILFIELD Try FieldOS

ASTM International

ASTM D6694: silicone coating tests, substrates and primer approval

A silicone submittal citing ASTM D6694/D6694M-25 needs liquid-property and cured-film results for the named formulation. The specification addresses solvent-dispersed silicone coating used over SPF insulation. A metal-roof recover also needs product-specific evidence permitting that substrate. Read the material results beside the evaluation's coating, primer and production-location entries: a coating qualified to D6694 is not automatically the coating approved for every row of a manufacturer's substrate table. Gaco S42, for example, reports 95 percent volume solids and 96 percent weight solids, two different qualification inputs.

Current edition: ASTM D6694/D6694M-25 (2025)
Updated

Official publisher page

Applies to

Laboratories qualify the silicone formulation, while estimators and permit reviewers establish the coating system for each roof surface. Use the SPF roofing guide for work over foam and the restoration guide for an existing roof. A proposed change of manufacturing source belongs in the submittal review because the evaluation below assigns substrate permissions by product and plant.

Key topics

Which silicone properties need qualification evidence?

ASTM D6694/D6694M-25 evaluates viscosity and solids in the liquid, followed by film properties including weathering, adhesion and low-temperature flexibility. Gaco's S42 sheet marked MKGF1021 1026 reports 96 percent solids by weight under D1644 and 95 percent by volume under D2697. At that volume-solids value, 5 wet gallons contain 4.75 theoretical gallons of nonvolatile film material. Preserve the property basis and test method; rounding both percentages to a single solids figure destroys a useful distinction in the qualification record.

Follow the manufacturing location into the substrate approval

Florida report FL17649-R13, revised October 17, 2024, organizes allowable silicone-coating substrates by production location. Its New Albany table specifies Unisil A/B Primer for the listed silicone coatings over galvanized metal; its Somerset table lists GAF High Solids Silicone Roof Coating over aged galvanized metal without primer. Those are separate product and plant combinations. The unprimed row cannot be transferred to another coating simply because both materials cite D6694.

Recognize a component evaluation at permit review

FL17649-R13 evaluates above-deck roof components and expressly leaves fire classification outside its evaluation. It permits the listed coatings where a complete roof-system approval is unnecessary, such as qualifying maintenance and repair, or where the component appears in a roof-system approval. Preserve that approval category in the permit package. Relabeling a component evaluation as an approved roofing system erases a material limit on what the document establishes.

    An existing roof still carries the uplift obligation

    The same Florida evaluation requires the existing roof or substrate to satisfy the project's wind-uplift requirements. The coating evaluation therefore does not supply missing attachment evidence for the roof beneath it. Place the existing assembly identification and its supporting uplift documentation beside the coating approval, with a separate disposition for any deficient attachment. An accepted pail of silicone does not close a roof-attachment deficiency.

    Separate the active specification from the code's older reference

    ASTM identifies D6694/D6694M-25 as active, while Chapter 35 of New York's 2025 building code references D6694/D6694M-08(2013)e1 for the SPF protective-coating table. These designations belong in separate fields. A 2025 qualification report is evidence under its stated edition; the code reference remains the edition published in that code. Resolve the acceptance of a proposed alternative edition through the project's approval process.

    How it is used in the field

    A metal-roof restoration submittal includes a D6694 data sheet and FL17649-R13. Start by matching the exact coating name and manufacturing location to the evaluation's galvanized-metal row. Then carry the required primer and surface condition into the work order. Copying only the coating trade name into the purchase order leaves the crew without the condition that made the submitted substrate use acceptable.

    An estimator has two galvanized-metal options in FL17649-R13: the listed New Albany coating with Unisil A/B Primer, or the listed Somerset coating on aged galvanized metal with no primer. Those takeoffs have different primer quantities and labor. Price the complete approved combination for each option. A later substitution changing the product or plant requires the corresponding substrate row, even if the two pails carry similar names.

    The coating application record should identify the container lot, product, recorded production source, roof substrate and specified primer. Link the accepted evaluation and manufacturer instructions to that area of roof. The adhesion comparison guide covers the separate field bond evidence. A successful adhesion patch does not revise the product evaluation's documented scope.

    At closeout, retain the evaluation's fire-classification exclusion and the separate assembly evidence rather than marking a general approvals box complete. FL17649-R13 also leaves deck and structural-member compliance outside its component scope. Those boundaries tell the reviewer which part of the roof the coating documentation has actually addressed.

    Edition history

    The active 2025 specification follows D6694/D6694M-15(2023). ASTM lists its current page as updated January 9, 2026. FL17649-R13 is a dated 2024 evaluation under the 2023 Florida Building Code, rather than evidence that its cited tests were performed to the later 2025 material edition.

    Roofing contractors tracking changes across a restoration territory use PorchRocket's Asset Search for scheduled imagery monitoring of visible assets, with dated views and the owner of record on every find.

    Frequently asked questions

    Does the ASTM designation identify the manufacturing plant?

    It identifies the material specification. The product evaluation and supplied-material traceability establish the production source where that source limits the permitted substrate and primer combination.

    Can the primer row for one silicone product be used for another?

    Use the row identifying the actual product, source and substrate. FL17649-R13 contains different primer conditions for different combinations, so its entries do not establish a brand-wide primer exemption.

    Sources checked

    Sections and parts cited

    ASTM D6694/D6694M-25

    Field guides that apply ASTM D6694

    Browse all codes and standards