NFPA 58: LP-gas tank records, cathodic-protection dates and piping service

NFPA 58, Liquefied Petroleum Gas Code, covers LP-gas storage equipment, installation, transfer, and use. NFPA lists the 2024 edition as current on November 5, 2026. Tank owners and suppliers need both the approved installation arrangement and the service history: buried steel protection, test dates, repairs, and piping materials suitable for liquid or vapor service. The adopted state requirements matter alongside the publication year, particularly when an older underground tank changes ownership or fails a protection test.

Current edition: NFPA 58, 2024 edition (2024)
Updated

Official publisher page

Applies to

Propane suppliers, tank installers, gas-system designers, inspectors, and owners use NFPA 58 for the LP-gas installation. Transportation rules also govern portable cylinders, while NFPA 54 addresses downstream fuel-gas and appliance subjects within its scope. Underground propane tanks do not inherit the inspection schedule for underground gasoline or diesel tanks merely because both are buried. Identify the stored product and applicable program first.

Key topics

Underground propane tanks: an installation test and a 12-to-18-month return

For underground propane tanks installed after January 1, 2011, North Carolina's LP-gas guidance calls for a cathodic-protection test when buried and a second test 12 to 18 months later. After both results pass, North Carolina's guidance allows subsequent tests at intervals no longer than 36 months. It also requires the last two test results to remain available for inspection. The agency recommends retaining the full history because changing voltage readings can indicate an anode approaching the end of its useful life. NC Agriculture, underground tank corrosion protection

A failed cathodic-protection test changes an older tank's obligations

North Carolina's guidance does not apply its January 1, 2011 installation requirements retroactively to every older tank. However, an older tank that is tested and fails needs correction and then enters the periodic program. A failure on a tank already in the program also restarts the schedule after repair. For a passing initial test on November 5, 2026 and a passing second test on November 5, 2027, the next test is due no later than November 5, 2030 under the agency's 36-month limit. Preserve actual test and repair dates rather than assigning every tank a common calendar-year deadline. NC older-tank and repair provisions

Schedule 10 permission is limited to aboveground vapor service

New Jersey's adoption explanation identifies NFPA 58's allowance for Schedule 10 steel piping as limited to aboveground vapor service. It separately identifies austenitic stainless steel as an allowed piping material. Mark liquid or vapor service and aboveground or underground location on each piping segment. Permission for a material in one service is not permission to substitute it throughout the installation. Keep material specifications and joining details tied to those marked segments. New Jersey explanation of the 2024 code changes

How it is used in the field

Make tank ownership an explicit field in the corrosion-protection register. North Carolina assigns responsibility for arranging tests and retaining results to the tank owner. When a customer buys a supplier-owned tank or changes suppliers, transfer the installation date, protective-system description, test history, repairs, and next due date with the equipment record.

Keep buried-tank corrosion evidence separate from gas-tightness and appliance startup records. Those observations address different failure mechanisms. An aboveground tank inventory also does not identify the buried shell or establish its corrosion-protection status. Reconcile the site drawing, tank serial number, owner, and test history when planning the service visit.

During a piping substitution review, compare the proposed material with the service marked on the drawing. Locate transitions between liquid and vapor and between buried and exposed runs. Carry the approved specification into the material receipt record so a permitted aboveground product is not installed on a different segment.

Adoption

New Jersey adopted the 2024 editions of NFPA 58 and NFPA 59 through amendments to N.J.A.C. 5:18, effective July 6, 2026. The final notice retains state modifications, so the base publication and the local amendments form the installation reference together. North Carolina's corrosion guidance supplies the separately identified service-program example above. New Jersey final adoption notice

A recurring tank search through PorchRocket Asset Search reports new, removed, or altered aboveground assets, with dated views for keeping an LP-gas service map current.

Frequently asked questions

Who keeps corrosion-protection records on a customer-owned tank?

North Carolina's guidance places that responsibility with the owner, who can arrange for a supplier or testing service to perform the work. Include the records in a tank sale or ownership handoff so the next owner inherits a usable maintenance history.

Can an aboveground vapor-pipe allowance be used for buried liquid piping?

The service limitation is part of the permission. Select and document the buried liquid-piping specification separately, including its allowed material and installation arrangement. Matching nominal pipe size does not establish equivalence between those services.