NDL warranty

An NDL (no dollar limit) warranty promises covered repairs without a monetary cap, but each issuer sets its reporting clock: 30 days for direct written notice under GAF COMTS700-1224 versus the first business day after discovery under Sika CMT-00196. Sika also calls for written confirmation within one week. Store those deadlines with the certificate's roof-area plan; reporting a leak to the contractor alone does not notify GAF under its cited form.

No Dollar Limit warranty: the covered repair obligation has no monetary cap, subject to the issued warranty's scope, exclusions and owner duties

Used across 5 Anvilfield field guides, most in Roofing.
Updated

Which costs stay with the building owner?

GAF's December 2024 Diamond Pledge specimen covers defined leaks caused by manufacturing defects, ordinary wear, or workmanship in applying the covered roofing materials. Its exclusions include specified design failures and failures involving non-GAF materials. Describe the component and water-entry location in a claim, then keep the manufacturer's covered repair separate from ceiling replacement, damaged inventory, and business interruption in the owner's loss record.

On a membrane leak beneath a paved roof terrace, write separate work-order lines for lifting and reinstating pavers and for repairing the membrane. Sika's CMT-00196 sample, dated September 8, 2021, assigns the membrane-exposure work, including paving removal and replacement, to the owner. Link the manufacturer's repair authorization to the membrane line and record the owner's authorization against the access work. That split gives dispatch a defined scope for each payer.

Compare the leak clock with the transfer clock

The table compares two published samples, each identified by form and revision. GAF COMTS700-1224 states that notice to the roofing contractor does not count as notice to GAF. Sika CMT-00196 makes the initial report and written follow-up separate obligations. Assign both tasks when the discovery date enters the leak log.

GAF's transfer process also requires repairs it identifies as necessary and an assignment fee. Sika assigns transfer processing, inspection, and necessary repair costs to the owner. A request awaiting approval remains an open task; attach the issuer's completed transfer record to the sale documents. The warranty coverage guide compares other issuers and warranty types.

Published formLeak reportingOwnership transfer
GAF COMTS700-1224, December 2024Written notice directly to GAF within 30 daysWritten request within 60 days after ownership transfer; repairs and assignment fee also apply
Sika CMT-00196 sample, September 8, 2021Notify Sika on the first business day after discovery; confirm in writing within one weekSika approval in advance and in writing; owner pays processing, inspection, and necessary repair costs

Separate a defect record from a covered leak

GAF's December 2024 Diamond Pledge specimen excludes blisters that have not caused leaks. Record a blister's location, dimensions, seam involvement, and change over time in the roof maintenance record. That condition record supports investigation; the guarantee's leak trigger determines whether its repair promise applies.

For a suspected seam defect, pair the leak location with the seam QA record. That record identifies the detail and installation evidence for the issuer's investigation. Keep a non-leaking blister on the condition work list while recording a reported leak as a separate claim event.

Map the warranted roof area at closeout

The GAF specimen identifies a roof area in squares and a roof specification; the Sika sample identifies building or area names and warranted square footage. Use those certificate fields to draw the coverage boundary on a roof plan, including any addition or retained roof section outside it. A repair address alone does not identify which roof area the certificate describes.

Both cited forms require prior written manufacturer approval for roof alterations within their terms. Locate a proposed penetration on the coverage plan and attach the relevant certificate to the alteration request. The resulting approval belongs with the work order and the roof asset register.

Distinctions

Claim acknowledgement
Acknowledgement establishes receipt of the report. The manufacturer's investigation still determines the cause and covered remedy; an acknowledgement number alone does not authorize a contractor's permanent repair.

Frequently asked questions

Is every NDL warranty's leak deadline 30 days?

No. The cited GAF specimen uses 30 days, while Sika CMT-00196 calls for the next business day plus written confirmation within one week. Set the calendar from the particular issued form.

Does NDL cover removal of pavers above the leaking membrane?

Sika CMT-00196 assigns membrane-exposure costs, including removal and replacement of paving or other overburden, to the owner. Identify the access scope separately from the covered repair when preparing the work order.

Sources checked

Also defined as

  • Manufacturer warranty without a stated repair-dollar cap, subject to covered causes, exclusions, and acceptance
  • No Dollar Limit warranty: long-term manufacturer coverage that requires documented maintenance to stay in force

Where this shows up

Next step: Build an older-roof list