ANVILFIELD Try FieldOS

Field glossary · property

Cool roof

Cool-roof performance comes from reflecting sunlight and emitting absorbed heat, expressed as solar reflectance, thermal emittance, and a calculated solar reflectance index (SRI). These describe surface behavior, not an insulation rating. Johns Manville's APP granulated membrane, CRRC 0662-0056, reports interim aged reflectance of 0.70 and SRI 86. The first means 70 percent of incident sunlight is reflected; the second is an index, not a percentage.

A reflective roof surface that lowers surface temperature and cooling load, rated by solar reflectance index

Used across 2 Anvilfield field guides, most in Roofing.
Updated

Reflectance, emittance and SRI on a product sheet

CRRC reports solar reflectance and thermal emittance on scales from 0 to 1; SRI combines those two measured properties into a calculated heat-rejection index. Put each in its own submittal column. A reflectance value of 0.70 belongs in the reflectance column, while SRI 86 belongs in the index column.

Thermal emittance describes the surface's ability to release heat by radiation. Johns Manville reports thermal emittance of 0.90 for both the initial and Rapid Ratings results of APP product 0662-0056. Carry that value with reflectance when comparing products; visible color alone does not supply either measurement.

Does a CRRC rating mean the roof meets code?

The Cool Roof Rating Council accepts products into its roof directory without setting a minimum solar reflectance or thermal emittance. Listing therefore establishes tested performance, rather than a pass against a particular jurisdiction's cool-roof requirement. Match the listed product, color, and rating status to the specification before treating its numbers as a qualifying result.

Anvilfield's membrane selection guide covers the material choice, and the roofing system overview places it in the assembly. Match the delivered color and surfacing to the rated product. CRRC also permits color-family ratings for eligible factory-coated metal products, so a separate test for every color is not always necessary. Verify that the selected coating and color fall within the listed family.

Rapid Ratings and completed outdoor aging

CRRC's roof rating program exposes specimens for three years in Arizona, Ohio, and Florida, representing hot dry, cold temperate, and hot humid conditions. The resulting aged rating represents that exposure program. It is not a measurement of a particular building's roof after three years of its own operation.

CRRC Rapid Ratings provide interim laboratory-aged results that are replaced when the required three-year outdoor exposure and aged testing are complete. Keep the Rapid designation attached to the value when transcribing it into a comparison sheet. A column headed only 'three-year' can conceal the difference between simulated aging and completed natural weathering.

Reading an actual granulated membrane rating

Johns Manville's October 20, 2026 update reports initial solar reflectance of 0.73 and interim aged reflectance of 0.70 for its APP cool-roof granulated membrane rating, CRRC product ID 0662-0056. The same update gives initial SRI 90 and Rapid Ratings SRI 86 for that product. Those are specific product results, including their aging status.

For incident solar energy of 1,000 W/m², a reflectance of 0.73 leaves 270 W/m² absorbed at the surface; 0.70 leaves 300 W/m². The calculated increase is 30 W/m² of absorbed sunlight. Converting that surface difference into cooling energy requires the assembly and operating information discussed in the cool-roof energy guide.

Distinctions

Local field measurement
A reading on an installed roof describes its present surface condition and measurement location. The directory's aged rating describes standardized product exposure and testing. Keep those records separately identified.

Frequently asked questions

Why does a rated roof show pending aged values?

CRRC explains that products outside the optional Rapid Ratings process retain pending aged values until their three-year results become available. Record that status rather than filling the blank with the initial result.

Does SRI 86 mean the roof reflects 86 percent of sunlight?

No. In Johns Manville's cited Rapid Ratings result, SRI 86 accompanies solar reflectance of 0.70, meaning 70 percent reflected sunlight. CRRC calculates SRI using both reflectance and thermal emittance.

Sources checked

Where this shows up

Related guides

Next step: Find coating work

Back to the full field glossary