Field glossary · asset
Fabric structure
A fabric structure encloses space with a membrane carried by a frame, cables, or air pressure inside the enclosure. ASCE/SEI 55-16 distinguishes these tensile-membrane arrangements from air-inflated beams. For replacement work, identify the supporting system and actual cover grade together; an NFPA 701 flame-propagation result describes the fabric's test performance and supplies neither a structural load rating nor an hourly fire-resistance rating.
A structure with fabric cladding supported by a frame.
Identify what holds the membrane in shape
ASCE's description of ASCE/SEI 55-16 includes frame-supported, cable-supported, and air-supported tensile membrane structures. The same ASCE description excludes air-inflated structures such as inflatable air beams. A building held up by pressure inside the occupied enclosure and a structure made from inflated beams therefore belong to different structural descriptions.
For a re-cover survey, identify frame bays, cable paths, edge attachments, and the way tension reaches the foundations. Preserve the original drawing references and panel identifiers. A change in fabric stiffness, seam construction, or attachment geometry can change how the membrane transfers load even when the replacement has the same exterior dimensions.
Specify the complete fabric instead of its color
Legacy Building Solutions identifies ExxoTec as PVC fabric with an acrylic outer coating and lists two cover grades, 19 oz ExxoTec Pro and 28 oz ExxoTec Elite. Keep the complete grade designation on the re-cover record. These are manufacturer product identifications, not interchangeable descriptions of any white membrane on a steel frame.
Separate cover identification from its connection geometry. At an existing attachment, record the membrane edge construction, mating track or clamp, and the hardware that tensions it. Give roof panels, endwalls, and internal liners separate identifiers. This produces a replacement-part record rather than a general request for fabric of a similar color.
A flame test is different from an hourly wall rating
NFPA lists 2023 as the current edition of NFPA 701, which tests flame propagation through textiles and films under specified fire-test conditions. Record the test method, tested fabric identification, and edition from the report. An hourly wall or roof rating concerns a different assembly-level performance question.
Legacy reports NFPA 701 testing for ExxoTec. Match that claim to the supplied fabric and its report rather than transferring it to an unidentified older cover. Re-cover records should distinguish the retained frame from the new roof skin, endwall material, and any liner, since those materials need their own identification.
Release the replacement scope by component
Issue separate scope lines for membrane replacement, connection hardware, frame repairs, and foundation or anchor work. The same measured building can need only a skin replacement or a broader structural repair. Keep the designer's accepted cover and connection documents with the relevant scope line.
Use the fabric-building re-cover guide to organize the commercial survey. The glossary distinction to retain is the load path: a membrane supported by an occupied-space pressure system is a different asset from fabric fitted over a rigid frame.
A re-cover territory starts with locating the structures: PorchRocket Asset Search returns a reviewed list of visible fabric buildings with the owner of record for each site.
Distinctions
- Air-supported dome
- Internal pressure supports the membrane, so the pressure system is part of the structural arrangement. It is different from a conventional frame carrying a fabric weather enclosure.
- Tarp
- An engineered tensile membrane uses specified pretension and connections that differ from a loose cover's attachment. Similar-looking sheet material is not evidence of interchangeability.
Frequently asked questions
Does a fire-retardant fabric make the building noncombustible?
A flame-propagation test describes the tested material under its test conditions. It does not assign the construction classification or an hourly fire-resistance rating to the entire building.
What identifies a re-cover membrane reliably?
Use the product and panel records, fabric specification, seam details, and attachment drawings. Appearance is useful for locating the structure, but insufficient for ordering its replacement skin.
Sources checked
- Legacy Building Solutions: fabric cladding and rigid frames
- ASCE: scope and structural types in ASCE/SEI 55-16
- Legacy Building Solutions: ExxoTec fabric composition and product options
- NFPA 701: current 2023 edition and flame-propagation test scope
- NFPA: official 2023 NFPA 701 errata, March 7, 2023
- NFPA Standards Council: August 2025 minutes, NFPA 701 current edition and revision cycle, page 21