ANVILFIELD Try FieldOS

Field glossary · business

Asset monitoring

Asset monitoring is a recurring comparison of physical inventory, measured against sites with usable new evidence. In a 240-site round with only 180 valid comparisons, coverage is 75%, even if every scheduled report was delivered. Report accepted changes, comparison coverage and elapsed processing time together. These measures distinguish a quiet territory from a monitoring cycle that could not see enough of it.

Dated change detection of new, removed or altered assets.

Used across 1 Anvilfield field guides, most in Market Intelligence.
Updated

How much of the territory was actually compared?

A monitoring round contains 240 registered sites. Comparable new observations cover 180; the other 60 remain due for observation. The round achieved 180 / 240 = 75% usable comparison coverage. Twelve of those 180 sites have an accepted change, giving a 6.7% share of compared sites with changes. The report therefore contains 12 changed sites, 168 compared sites without an accepted change and 60 sites awaiting comparison.

For an observation captured September 2, interpreted September 5 and delivered September 6, interpretation took three days and delivery added one day. Those four days measure processing after capture. An earlier physical change adds observation delay that these timestamps cannot measure. Use the coverage count and processing delay to decide whether the next investment belongs in imagery acquisition, review capacity or alert distribution.

Why an import can make old observations look new

OGC SensorThings API 2.0, published November 4, 2026, assigns phenomenonTime to the observed event or interval and resultTime to the generation of its result. Apply those meanings when importing building observations, with a separate received-at field for delivery to the service team.

Under OGC SensorThings API 2.0, a POST that creates an Observation without phenomenonTime receives the current server time in that field. This default supports devices without clocks; it does not reconstruct the acquisition date of an imported image. Flag server-assigned values during ingestion, and retain the original acquisition field so a historical observation cannot pass a freshness filter merely because it was uploaded today.

Does an eight-day revisit reveal equipment changes?

NASA reports an eight-day repeat coverage interval for Landsat 8 and 9 together and a 16-day interval for each satellite. NASA lists Landsat 9 optical resolution as 30 m for its multispectral bands and 15 m for its panchromatic band. A 3 m cabinet spans only one-tenth of a 30 m pixel, so that imagery cannot establish a cabinet replacement from its outline.

Choose the imagery against the smallest change the service must recognize, then count only views with sufficient detail and visibility in the coverage calculation. Use the asset monitoring field guide to define the event register, and attach a minimum usable-image specification to each event class. A scheduled satellite pass becomes a successful comparison only after that specification is met.

Distinctions

Condition monitoring
Vibration, temperature and oil measurements describe equipment behavior. This glossary's asset monitoring concerns changes in a physical inventory. Connect both histories through the equipment identity when a service program uses them together.

Frequently asked questions

Does a daily alert service need a new image every day?

No. A distribution schedule counts message opportunities. A monitoring agreement also needs a maximum acquisition age, a minimum usable-comparison share and a capture-to-delivery deadline, each reported for the sites covered by that round.

How should an overdue observation appear in the report?

Give each missed site its last successful comparison date and a coverage-gap reason. Publish the overdue-site count beside the current round so an alert-free report cannot conceal a growing acquisition backlog.

Sources checked

Where this shows up

Related guides

Next step: Monitor territory changes

Back to the full field glossary