Bearing capacity

A bearing-capacity value is a pressure limit for a stated foundation geometry and soil condition. Before using it in a footing calculation, identify its load basis: allowable or ultimate, net or gross. Caltrans distinguishes net pressure for settlement checks from gross pressure for bearing-resistance checks. For example, 3,200 psf gross becomes 2,720 psf net after subtracting 480 psf of original overburden; comparing the wrong pair of values changes the apparent margin.

The pressure the soil can carry before it fails or settles too much, in psf

Used across 2 Anvilfield field guides, most in Concrete.
Updated

Gross and net bearing pressure use different loads

Caltrans Bridge Design Practice 10.1, August 2024, includes the footing weight and soil above the footing when calculating gross bearing stress. Caltrans calculates net bearing stress by subtracting the original overburden pressure at the footing base from gross stress. A column-only pressure omits both the added foundation weight and the excavation credit; label each contribution before comparing it with the geotechnical limit.

At a founding depth of 4 ft in soil weighing 120 lb/ft3, the original overburden pressure is 480 psf. Keep the original grade, founding elevation, soil unit weight and included footing weight with the calculation for the footing detail. The pressure calculation below uses that same original-ground reference throughout.

Calculation itemPressureCalculation
Gross applied pressure3,200 psfIncludes footing and backfill loads
Original overburden480 psf4 ft x 120 lb/ft3
Net applied pressure2,720 psf3,200 - 480 psf

An eccentric load reduces the effective footing area

FHWA's Geotechnical Engineering Circular No. 6, Shallow Foundations, reduces each effective footing dimension by twice the load eccentricity in that direction: B' = B - 2eB and L' = L - 2eL. Eccentricity is the applied moment divided by the vertical load. FHWA distinguishes this effective-area bearing calculation from the actual pressure distribution used to design the footing concrete.

A 5 ft by 8 ft footing carrying 120,000 lb has an average pressure of 3,000 psf over its full area. With 0.5 ft eccentricity across the 5 ft dimension and none along the other dimension, the effective area is 4 x 8 = 32 ft2 and the corresponding pressure is 3,750 psf. Ignoring the moment understates that comparison by 750 psf. Enlarging the pad without carrying the load location through the calculation misses the same issue.

Carry the bearing direction into the field handoff

A horizontal thrust-block reaction, a footing's vertical reaction and a pile's axial capacity describe different load paths. The water-main restraint guide uses the trench wall as the bearing face. Label its direction and soil condition explicitly when exchanging data with a foundation designer. After ground improvement, retain the verification results and revised geotechnical design basis rather than attaching the original untreated-soil value to the completed work.

Distinctions

Modulus of subgrade reaction
This relates contact pressure to displacement. It describes support stiffness and has pressure-per-length units; bearing capacity is a pressure or resistance limit.
Concrete bearing strength
Local crushing beneath a plate or loaded concrete area is a concrete limit state. A soil bearing value does not establish that connection's capacity.

Frequently asked questions

Does an allowable bearing pressure include a settlement check?

Read the report's stated basis. Caltrans separates permissible net contact stress for service settlement checks from factored gross bearing resistance for strength checks. A value identified only as ultimate bearing resistance does not establish acceptable movement.

Sources checked

Also defined as

  • Plumbing: The allowable load the soil carries per unit area, in psf, that sizes the block

Where this shows up

Related guides

Next step: Locate tank foundation accounts

Back to the full field glossary