ANVILFIELD Try FieldOS

Field glossary · business

Fit-first lists

A fit-first list releases a building only when a written service profile evaluates to true. For a campaign requiring at least 25,000 square feet of gross floor area and a dock or yard, the size and territory tests must pass, while either confirmed asset satisfies the last condition. Missing yard data does not block a building with a confirmed dock. Store rejected and unresolved results separately to measure list yield and remaining research.

Lists filtered to the buildings that fit a company's work.

Used across 1 Anvilfield field guides, most in Market Intelligence.
Updated

Make a dock-or-yard profile testable

Write the selection as: inside territory AND gross floor area >= 25,000 square feet AND (loading dock OR industrial yard). The parentheses keep a yard match subject to the same size and territory tests as a dock match. Record exactly 25,000 as a passing boundary value; changing >= to > would exclude it.

PostgreSQL 18's SQL truth table makes true AND unknown evaluate to unknown, and false AND unknown evaluate to false. In this profile, an unresolved area field blocks release unless another mandatory condition already fails the building. Save the expression with the fit-first list guide's commercial scope so the database filter and purchasing brief describe the same population.

PostgreSQL 18 also defines true OR unknown as true and false OR unknown as unknown. Once the territory and area gates pass, the dock-or-yard test produces the following results.

Loading dockIndustrial yardDock-or-yard result
Confirmed presentUnknownPass
Confirmed absentUnknownUnresolved
Confirmed absentConfirmed absentFail
UnknownConfirmed presentPass

Specify the floor-area basis before applying 25,000

EPA Portfolio Manager normally measures building gross floor area to the outside surfaces of exterior walls and accepts the inside perimeter when that is more readily available. Its GFA includes supporting interior spaces but excludes exterior loading docks, driveways and parking. Identify which permitted wall basis the source used; a rentable-area, parcel-area or yard-area value cannot substitute for that GFA field.

A building can therefore satisfy the dock requirement without adding the exterior dock surface to its building area. Store both the GFA source and the separate dock observation. This prevents a useful service feature from inflating the numerical gate that selected the property.

Reconcile released, rejected and unresolved buildings

A 200-building run produces 126 passing records, 44 failures and 30 unresolved records. The released share is 126 / 200 = 63%. Reporting 126 / 170 = 74.1% measures only resolved records and conceals the outstanding research load. Put all three dispositions beside the saved expression and input version.

PostgreSQL 18 defines NOT unknown as unknown, so a blank excluded-material field cannot establish that an exclusion is absent. Retain that result when exporting a Boolean filter to a spreadsheet. When ten unresolved records acquire the missing evidence, rerun the saved expression and retain both releases so changed evidence can be distinguished from changed selection rules.

Distinctions

Lead score
A building can earn a high lead score for size, travel distance and account history while failing a mandatory material test. Keep the eligibility result beside the score so sorting a spreadsheet cannot promote a rejected building into the released list.

Frequently asked questions

Why can a building with a blank yard field pass?

The profile accepts either a dock or a yard. A confirmed dock resolves that alternative even when the yard is unknown, provided territory and GFA also pass. An unknown mandatory input remains unresolved only when no known value determines the complete expression.

How do I prove that two lists used the same filter?

Compare the saved expressions and field definitions, including parentheses, >= versus >, area basis and handling of blanks. Identical filter names do not establish identical logic; preserve the actual rule and input version for each delivery.

Sources checked

Where this shows up

Related guides

Next step: Select matching buildings

Back to the full field glossary