ANVILFIELD Try FieldOS

Field glossary · business

Installed-base mapping

Installed-base mapping builds an equipment inventory whose geographic records retain the correct unit count through export and enrichment. A building with 18 assemblies and three contacts still contributes 18 units, although an unfiltered join produces 54 rows. Validate the delivered map by coordinate order, full query retrieval and distinct asset IDs. Those checks expose displaced points, missing pages and duplicated rows before a territory manager assigns service coverage.

Locating every unit of a product class in the field, regardless of brand.

Used across 1 Anvilfield field guides, most in Market Intelligence.
Updated

Keep contact joins from multiplying installed units

One building has 18 mapped equipment assemblies and three account contacts. Joining every assembly to every contact produces 54 rows. The installed population remains 18 assemblies. Calculate quantity from the distinct asset IDs in the equipment layer, then attach contacts through a relationship table that preserves the one-to-many link.

Archive the unjoined equipment export before enriching it. Compare unique asset counts before and after each join, and retain unmatched equipment in the result. A missing account relationship should create an account-research task rather than silently deleting a mapped assembly. The building data formats guide explains the delivery formats used for that handoff.

Why coordinate order matters in equipment exports

IETF RFC 7946, the 2016 GeoJSON specification, places longitude before latitude and uses WGS 84 coordinates in decimal degrees. An equipment point written as [-84.40, 33.75] is therefore longitude -84.40 and latitude 33.75. A spreadsheet expecting latitude first must map the two columns explicitly during import.

Save the export format and coordinate reference with the delivered layer. Use a known site to test the first import, then compare the geographic extent with the requested territory. Preserve a raw point such as [-84.40, 33.75] in the import log so a column reversal can be traced. These checks protect the field register described in the manufacturer installed-base mapping guide.

What to do when 450 matches yield only 100 rows

OGC API - Features Part 1: Core 1.0.1 distinguishes optional numberMatched, the features satisfying a query, from optional numberReturned, the features in a response. The standard recommends a next link when more features are selected than returned; it does not require that link. An absent continuation link therefore cannot establish a complete download.

A query matches 450 equipment features and returns pages of 100, 100, 100, 100 and 50. Saving the first page retrieves 22.2% of the matching records. Retrieve every supplied continuation page and reconcile unique feature IDs against the matched total. If the download stops at 100 while numberMatched is 450, obtain the remaining records through a supported query or complete export before releasing the inventory.

OGC API - Features Core 1.0.1 also warns that a dataset can change while a client follows successive pages. Use a fixed export or a server-provided snapshot where available, and retain the query and retrieval time. When the service omits numberMatched, record the total as unknown and obtain a separate completeness check from the supplier.

Under OGC API - Features Part 1: Core 1.0.1, an included response timeStamp records when the response was generated. Store it as retrieval metadata, and export the equipment acquisition date in its own feature property. A newly downloaded file can contain observations from earlier survey rounds.

Distinctions

Feature count
A geographic feature is the object represented by a row in a spatial collection. It might represent a building, an assembly or a component. An installed-unit total needs a collection whose feature definition matches the counted equipment.
Map marker count
A display can cluster many equipment records into one marker or show several observations for one unit. Obtain the underlying feature identities and counting rule before using visible markers as inventory quantities.

Frequently asked questions

Does numberMatched mean every asset in the territory was found?

It counts matching features held by the queried service. Search coverage, hidden equipment and unresolved locations belong in the inventory's evidence report, which establishes how that stored collection relates to the physical territory.

Can a CSV carry an installed-base map?

Yes. Include the equipment identity, linked building identity, coordinate columns with their order and reference system, observation date and status. Preserve any source polygons separately when boundaries matter to the inventory.

Sources checked

Where this shows up

Related guides

Next step: Map installed equipment

Back to the full field glossary