Field glossary · business
Installed base
An installed base is reported as a reconciled stock balance, so a 765-unit closing fleet can include 45 installations during the year. With 750 units opening, 30 replacements and 15 additions, installation workload equals 45 while net growth is only 15. Record incoming units, retirements, territory transfers and corrections as separate movements. The closing stock supports service-capacity planning, and the movement ledger explains installation workload.
The population of installed assets within a defined product class, geography and observation period. Count the physical stock, retain retired status in its history, and separate installed quantity from annual replacement flow.
Reconcile the stock before forecasting replacements
DOE's 2012 automatic commercial ice maker shipments analysis projects surviving stock by adding shipments to its starting population and subtracting estimated retirements. Apply that stock-accounting structure to a territory register using confirmed installations as the incoming event. Keep received-but-uninstalled units in a separate column, and post their inventory transfer when the recorded installation milestone occurs.
Use opening stock + installations - retirements + transfers in - transfers out + corrections = closing stock. A transfer changes a branch population when equipment crosses its boundary, even if the company's national population stays unchanged. An identity correction changes the counted record without representing equipment bought or removed. Give each movement its own reason code.
A 765-unit closing fleet can contain 45 installations
A service territory opens the year with 750 installed units. During the year, 30 units retire and receive replacements, and 15 additional units enter service at expanded sites. The incoming count is 45, the outgoing count is 30 and closing stock is 750 + 45 - 30 = 765 units. Net growth is 15 units, or 2% of opening stock.
The retirement rate is 30 / 750 = 4%, while incoming installations equal 45 / 750 = 6% of opening stock. Those percentages describe different movements. Reporting only the 2% growth would erase most of the year's installation workload. Reporting all 45 installations as fleet expansion would overstate growth by 30 units. Use this reconciliation alongside the population definitions in the building intelligence glossary guide.
Track surviving installation vintages
DOE's 2012 ice maker analysis uses a Weibull survival distribution to distribute replacement across equipment ages. Use the method's cohort structure when tracking an installation vintage: retain its original quantity and reduce its surviving quantity as retirements are accepted. Keep age assumptions specific to the equipment family being forecast; the ice maker study supplies a stock model, not a rooftop-unit service life.
A vintage begins with 150 units and has 120 surviving units at the reporting cutoff. Its observed survival share is 120 / 150 = 80%; cumulative retirements total 30. A new replacement belongs to its own installation vintage. Moving it into the predecessor's old vintage would leave the fleet count intact while making the age profile wrong.
Preserve predecessor links in the service system
Salesforce's Field Service training describes replacement tracking by linking the outgoing and incoming customer asset records. Carry that relationship into the stock ledger so a replaced unit's service history remains recoverable without leaving it in the active population. The equipment mapping method covers the identity evidence behind those records.
Close the outgoing asset's active interval and open the successor's interval on their supported effective dates. Keep discovery dates separately when the change reaches the research team later. This permits a report to distinguish a corrected historical balance from equipment that actually entered service during the current reporting period.
Distinctions
- Shipments
- Shipments measure units moving through a sales or supply channel. Installation milestones, retirements and transfers establish how that flow changes a field population. Distributor stock can delay the connection between the two.
Frequently asked questions
Does standby equipment count in the installed base?
A duty/standby pair contributes two installed assemblies when both have reached the register's installation milestone. Keep a duty-status field on each assembly so service scheduling can distinguish operating hours from the installed count.
Does replacing a compressor add another rooftop unit?
A compressor replacement posts a component event beneath the existing rooftop-unit ID. The assembly count remains one. Record the new component identity and installation date without creating a second rooftop-unit row.
Sources checked
Also defined as
- Datacenter: Equipment documented as installed within a stated territory, equipment scope, and observation period.