Integral color
Integral color is a batched pigment system: a 3% recipe based on 600 pounds of cementitious material needs 18 pounds of pigment per cubic yard. The colored paste surrounds aggregate that retains its own appearance, so a chip can still look different from the finished surface. Identify the dosage denominator, load volume, and mixing revolutions before attributing a color mismatch to pigment strength.
Pigment batched into the wet concrete, coloring the slab through its full depth
Specify the pigment dose and its denominator
ASTM C979/C979M-24 caps a pigment's prescribed maximum at 10% of cement mass. The selected pigment can have a lower qualified maximum. ASTM C979 also limits the combined dosage of a pigment blend to the lowest of its individual component maximums, so adding a second pigment does not create a separate allowance.
SikaColor-100 P instructions count all cementitious materials in the cement content used for that product's dosage calculation. State that basis on the batch record rather than writing only a percentage. A percentage of portland cement alone differs from the same percentage of cement plus slag or fly ash.
A mix contains 500 pounds of cement and 100 pounds of fly ash per cubic yard. An approved recipe at 3% of total cementitious mass calls for 18 pounds of pigment per cubic yard, or 162 pounds for 9 cubic yards. Dosing 3% against cement alone supplies only 15 pounds per yard, a 27-pound shortfall across the load.
Mixing time has a measurable requirement
SikaColor-100 P requires at least 100 drum revolutions at the mixer manufacturer's recommended mixing speed. Those are mixing revolutions, not an equivalent number of slow agitation turns while waiting for the placing crew. For pea-gravel or rounded-stone mixtures, Sika recommends emptying the color from its bag because the aggregate does not reliably break up the packaging.
Count additions and revolutions against the individual load. Streaks from incomplete dispersion should be distinguished from a uniformly lighter placement caused by a different binder source, water content, or finishing condition. Increasing pigment on the following truck does not correct an incompletely mixed earlier load.
A color sample must represent the finished surface
ASTM C979/C979M-24 addresses pigment properties and effects on concrete, but does not establish compatibility with every other admixture unless the combination is tested. Qualify the actual color, binder, admixture package, and finishing process together when the appearance is critical.
For an integral-color acceptance sample, label the binder basis and pigment mass beside the surface finish and sealer. If the sample and production concrete contain different fly-ash quantities, matching pigment pounds per yard alone does not reproduce the qualified recipe. Compare samples at similar dryness and lighting before changing the dose on a following load.
Distinctions
- Dry-shake color hardener
- A dry-shake material concentrates pigment and hard aggregate near the wearing surface rather than through the full batch.
- Stain
- A stain modifies an existing surface. Integral pigment enters the concrete before placement and must be included in its batch controls.
Frequently asked questions
Why can a chipped colored slab show a different color?
A chip changes texture and exposes aggregate as well as pigmented paste. Full-depth pigment does not make every constituent the same color.
Does ASTM C979 guarantee the slab will match a printed chart?
No. It qualifies pigment properties and concrete effects. The approved job sample establishes the intended appearance with the actual materials and finish.