NSF/ANSI 61

NSF/ANSI/CAN 61 certification evaluates chemicals a component contributes to drinking water; Crossfield's MPC tank lining, for example, is listed only for vessels of at least 10,000 gallons. Product listings can also restrict water-contact category, mix ratio, film thickness and cure. The current publication as of November 5, 2026 is the 2025 edition with the addendum announced February 13, 2026. This certification does not establish contaminant-removal performance or certify the water already in a tank.

The certification that a material in drinking-water contact does not leach contaminants above health limits

Used across 2 Anvilfield field guides, most in Concrete.
Updated

Verify the listed product and production facility

Search the certifier's directory using the trade designation, then match the manufacturer, facility, intended use and listed components. Save the dated result with the submittal. A familiar logo on a brochure does not identify which formulation or application the directory covers.

NSF's drinking-water component brochure describes certification as a process involving formulation review, a production-facility audit, testing and technical evaluation, with certification maintained annually. A current directory record supplies evidence that a product remains in that program rather than relying on a certificate copied into an old project file.

An estimator can attach the current listing to the tank-lining submittal and mark each condition against the vessel schedule. A tank missing from the accepted size or water-contact category needs a different listed application, even when the product name on the container matches.

Read the entire tank-lining restriction

NSF's official component directory lists Crossfield's Multipurpose Protective Coating, comprising MPC Liquid Catalyst and MPC Powder, for tanks of at least 10,000 gallons. That restriction applies to the listed coating use, not to a contractor's total gallons across a site.

The same listing requires two to three coats, a maximum field dry-film thickness of 60 mils and an A:B mix ratio of 110:43 by weight for each coat. Its four-hour recoat cure and 24-hour final cure both apply at 72 F. Copying the cure times without the temperature or mix ratio leaves an incomplete application record.

The MPC entry carries the water-contact category CLD 23. NSF's temperature definitions explain this as cold-water service with continuous exposure to ambient water temperatures, tested at 23 +/- 2 C. The test temperature is not a blanket maximum operating temperature, and this category does not establish domestic-hot-water certification.

A site has two 5,000-gallon tanks connected to the same distribution system. Adding their capacities gives 10,000 gallons of storage, but each lined vessel remains a 5,000-gallon tank. That arrangement does not meet this listing's minimum tank size. Select a listing that covers each actual vessel.

Health-effects certification has a defined boundary

NSF's 2025-edition addendum announcement, published February 13, 2026, describes the standard's chemical-contaminant scope. It expressly excludes product performance, taste and odor, and microbial-growth-support requirements.

Keep that boundary clear during procurement. A material-health certification does not establish a tank's structural capacity, the coating's service-life prediction or a filter's contaminant-removal performance. Those claims need the separate evidence appropriate to the product and the intended duty.

Water-quality sampling and the certification listing belong in different parts of the turnover file. The listing identifies the evaluated material and use conditions; it contains no sample result from the installed vessel. Link both records to the tank identity in the water-tower inspection file.

Distinctions

NSF/ANSI/CAN 372
NSF's lead-content technical brief describes Standard 372 as a check of lead content, while Standard 61 evaluates extraction or leaching into water. A 372-only listing does not establish certification to 61.

Frequently asked questions

Can two small tanks satisfy one coating's minimum tank size?

Apply the size restriction to each vessel receiving the lining. Connected storage capacity does not enlarge the individual tank identified by the listing.

Does NSF 61 certify that a filter removes lead?

Standard 61 addresses chemicals contributed by the component itself. A lead-removal claim requires the relevant treatment-performance certification and its specific reduction claim.

Does CLD 23 mean the water must never exceed 23 C?

NSF uses CLD 23 for continuous ambient cold-water applications tested at 23 +/- 2 C. It is a certification application category, not a stated 23 C maximum service limit or a hot-water listing.

Sources checked

Also defined as

  • Plumbing: Certification for the safety of materials in contact with drinking water, including low-lead fittings