PACP

Under NASSCO's Pipeline Assessment Certification Program (PACP), Quick Rating 5142 identifies one grade-5 occurrence and two grade-4 occurrences; lower grades remain in the detailed record. A report also carries a summed Pipe Rating and an averaged Pipe Rating Index, with separate structural and operation and maintenance (O&M) results. Read those summaries alongside the surveyed coverage, because their numbers describe the inspected reach. As of November 5, 2026, CERIU's certification course teaches PACP Version 8.1.

NASSCO's Pipeline Assessment Certification Program for standardized observations, with defect grades from 1 to 5

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

Decode a PACP Quick Rating such as 5142

NASSCO's January 2026 NEWEA presentation explains the four Quick Rating positions as the highest grade, its occurrence count, the next-highest grade and that grade's count. Thus 5142 represents one grade-5 occurrence and two grade-4 occurrences. Lower grades can also be present without appearing in those four characters.

Treat the rating as a code string in an export. NASSCO describes Quick Ratings as alphanumeric, so a spreadsheet field restricted to numbers cannot preserve every valid result. Keep the structural and O&M Quick Ratings in separate fields and retain the underlying observation records from the CCTV inspection.

Position in 5142ValueRead it as
First5Highest observed severity grade
Second1One occurrence at grade 5
Third4Next-highest observed severity grade
Fourth2Two occurrences at grade 4

What a Pipe Rating Index leaves out

NASSCO's condition-grading guidance distinguishes the Pipe Rating, a sum reflecting grades and occurrence counts, from the Pipe Rating Index, the average severity of the recorded occurrences. Under NASSCO's averaging method, one grade-5 occurrence and five grade-1 occurrences produce a Pipe Rating Index of 1.67.

The arithmetic is (5 + 1 + 1 + 1 + 1 + 1) / 6 = 1.67, with a Pipe Rating of 10. Those five lesser occurrences have lowered the average without removing the grade-5 finding. Review the severe observation and its location before using the average to rank a rehabilitation or replacement scope.

Keep the survey history when software changes

PACP Version 8.1 is the revision named in CERIU's current CERIU-NASSCO certification course; NASSCO's January 2026 presentation dates the original Version 8 release to January 2024. Preserve that distinction when an older report says Version 8.0. NASSCO's conversion workbooks cover version 6 to 7 and version 7 to 8 observation codes; record the original coding version alongside the receiving database version.

Keep the original export and video linked to the converted observations. An asset identifier, survey direction and inspected length let the reviewer relate an old finding to the same reach. Where a camera run stops and inspection resumes from the opposite end, preserve both survey records and their coverage instead of presenting the first partial run as the whole pipe's condition.

Will the inspection database import?

NASSCO's October 2025 Tech Tip identifies SQLite as the Version 8 exchange-database format, replacing Microsoft Access; it says Access remains supported for Version 7. A PDF rating report and playable video do not demonstrate that this exchange database will load into the owner's asset system.

Import a sample delivery and reconcile its survey count, asset identifiers and observation count with the original export. Open a severe observation from the imported record and confirm that it reaches the corresponding video location. Include an abandoned survey and its reverse run in the sample so the receiving system preserves their separate coverage. This tests the handoff that a camera demonstration misses. Use the surcharge investigation guide when the deliverable also needs event evidence for a backup diagnosis.

What the published certification syllabus tests

NASSCO's published Version 8.0 two-day syllabus specifies 16 course hours and an examination pass mark of at least 85%. It includes inspection headers, detail records and structural, O&M, construction and miscellaneous coding. Those published syllabus criteria accompany the older 8.0 revision; CERIU's Version 8.1 course also lists 16 hours.

Distinctions

Condition versus risk
The condition describes the observed pipe. Risk also accounts for the consequences of failure: location, customers and exposure can change priority without changing the recorded defect. NASSCO's 2026 presentation treats consequence of failure as a separate asset-management input.
Defect grade versus segment rating
A defect grade belongs to an observation and its descriptors. A segment rating summarizes observations across a survey. Neither number identifies how much of an obstructed or abandoned run remained unseen.

Frequently asked questions

Does Quick Rating 5142 mean the pipe has only three defects?

It identifies three occurrences within the two highest grades. Open the observation table to count any lower-grade findings and to distinguish discrete observations from continuous defects under the specified manual's counting rules.

Is a PACP rating a remaining-life estimate?

No. A condition summary supplies evidence for asset management. A remaining-life decision also needs the deterioration model, inspection history and operating context; a severity grade alone does not supply a failure date.

Sources checked

Also defined as

  • NASSCO's Pipeline Assessment Certification Program, the standard language for grading camera findings

Where this shows up