Field glossary · property
Termination rating
Termination rating tells an estimator which conductor ampacity column the equipment accepts and which insulation temperature it requires. Those are separate entries: Schneider Electric's ventilated low-voltage transformer instructions require 90°C wire and AL9CU lugs but retain 75°C ampacity. Read the equipment instruction alongside the connector code and the requirement at the other end of the conductor. A lug stamped 90°C alone does not supply the equipment's conductor-sizing basis.
The temperature rating of the lug or terminal, which caps the conductor ampacity under 110.14(C)
AL9CU does not change the equipment label
Schneider Electric's wire-temperature bulletin explains that manufacturers install 90°C-rated AL9CU lugs in equipment rated for 60°C or 75°C conductors. The equipment's temperature instructions govern the installed termination. Replacing the connector with another 90°C component leaves that equipment rating unchanged.
Photograph the equipment's wire-temperature marking together with the connector identification. A close-up of 'AL9CU' alone documents only part of the application. Capture the allowed conductor material, size range and connector kit as well, so the record shows which connection was actually evaluated.
Read 60°C, 60/75°C and 75°C wire markings
UL Solutions' molded-case breaker guide requires breakers rated 125 A or less to be marked for 60°C, 60/75°C or 75°C-only wire. Above 125 A, UL identifies 75°C as the wire-temperature basis and makes that marking optional. Keep this 125 A product-marking breakpoint separate from NEC 110.14(C)'s 100 A installation-rule breakpoint; the equipment's actual listing and instructions identify the permitted connection.
A 60/75°C marking permits the corresponding conductor applications described by the equipment documentation. A 75°C-only instruction requires insulation suitable for that connection even when a colder-rated termination elsewhere limits the circuit's ampacity. The conductor-insulation guide decodes the wire jacket; the receiving record must also retain the equipment instruction.
Why some equipment requires 90°C wire at 75°C ampacity
Schneider Electric specifies AL9CU lugs and 90°C-rated conductors for its ventilated low-voltage transformers while requiring conductor ampacity from the 75°C column. The minimum insulation temperature and the ampacity basis are separate instructions. Meeting one does not discharge the other.
Enter those requirements separately on the feeder schedule: 'minimum insulation temperature' and 'termination ampacity basis'. A submittal reading '90°C wire, 75°C ampacity' preserves the two instructions and prevents the estimator from crediting the hotter column. Carry the documented basis into the ampacity calculation after identifying the permitted conductor type.
Different ratings at opposite ends of one conductor
Schneider Electric's bulletin describes a conductor connected to a 75°C breaker termination at one end and a 60°C receptacle termination at the other. That connection requires at least 75°C insulation while using the conductor's 60°C ampacity. Keeping only the lower temperature in a worksheet would lose the breaker's insulation requirement.
NFPA identifies the 2026 NEC as its current publication. Keep the project's adopted edition in the same record as the manufacturer's wire-temperature instruction and connector kit. This connects the calculation basis to the actual installation rather than to a generic temperature note on the drawing.
Distinctions
- Insulation temperature versus ampacity column
- Insulation must tolerate the connection's specified conditions. The permitted ampacity column sets the conductor-sizing basis. Equipment can require a hotter-rated insulation while retaining a lower ampacity basis.
- Temperature rating versus thermal-image temperature
- The rating is an application requirement established for the equipment. A thermal-image reading describes the observed surface under the survey's load and conditions; it does not establish or revise the listing.
Field example
Schneider Electric bulletin 0110DB9901 R04/20 sizes a 200 A noncontinuous feeder using 250 kcmil copper, four current-carrying conductors and a 40°C ambient. Its 90°C starting ampacity is 290 A; applying the stated 0.80 conductor-count factor and 0.91 ambient factor gives 211.12 A, rounded to 211 A. That is below the conductor's 255 A value at the equipment's 75°C termination basis. The worksheet retains both the adjusted 211 A and the 255 A termination cap, with 211 A governing.
Frequently asked questions
Can I install a higher-temperature lug to increase feeder ampacity?
The replacement must be permitted for the equipment, and the equipment's own temperature rating still applies. A connector marking by itself cannot authorize a higher ampacity basis.
Where should I look when the breaker has no visible temperature marking?
Read the complete equipment labeling and manufacturer documentation for the catalog number and connector kit. UL's guide allows omission of the 75°C wire marking on breakers above 125 A; an incomplete view of the device is a separate issue.
Sources checked
- Schneider Electric bulletin 0110DB9901 R04/20: equipment versus lug ratings, mixed terminations and 250 kcmil feeder example
- UL Solutions: Molded Case Circuit Breaker Marking and Application Guide, items 20 and 21
- Schneider Electric FAQ FA114339: ventilated low-voltage transformer lug and conductor requirements
- NFPA 70: 2026 NEC publication metadata