ANVILFIELD Try FieldOS

Field glossary · asset

Vegetative / green / living roof

Vegetative roofs combine a waterproofing assembly with engineered growing media and plants. Their reference quantities should distinguish planted area, maximum drained media weight, water-storage capacity, and storage still available before a storm. A green-looking surface does not establish those properties; obtain the media test data and installed depth for each roof zone.

A planted assembly built over a watertight roof membrane for stormwater, cooling, amenity, and membrane protection

Used across 2 Anvilfield field guides, most in Roofing.
Updated

Separate wet media weight from water standing above it

ASTM E2399/E2399M-19 measures maximum media density under drained conditions near saturation. The reported density supports media dead-load calculations; standing water above that drained assembly is an additional load. Keep the media report with the actual zone depth rather than assigning one weight to every planted area.

ASTM E2399/E2399M-19 limits its procedure to media containing no more than 30% organic material measured by loss on ignition. That test basis is different from a supplier's recipe expressed as component volumes. Record which basis accompanies the organic-content number when comparing media submittals for the roof installation.

At a maximum drained density of 90 pounds per cubic foot, 4 inches of media contributes 90 x 4 / 12 = 30 psf; 6 inches contributes 45 psf. Retained water is already included in that wet-density input. Add the other assembly layers separately, and account separately for water stored above the drained media condition. Do not add the same retained media water a second time.

Available storage depends on how wet the roof already is

GSA's May 2011 green-roof report describes growing media retaining roughly 30% to 60% water by volume when fully saturated. This is a media property, not the percentage of every storm that the completed roof retains. Existing moisture occupies part of that storage before new rain arrives.

For a 4-inch medium with 40% retained-water capacity and 30% current volumetric water content, the unused media capacity is 4 x (0.40 - 0.30) = 0.4 inch. Across 10,000 square feet of planting, that is about 333 cubic feet, or 2,494 US gallons. Using the full 40% would assign four times that available volume. This storage balance alone does not predict event runoff, which also depends on infiltration and drainage during the storm.

Pair rain depth and runoff volume over the same monitored area and event period. Report the initial moisture condition and the delayed drainage still leaving after rain ends. Retention reduces the discharged volume; detention shifts its timing. Those measurements distinguish the planted assembly from a blue roof designed around controlled water storage.

Turn the test data into maintenance observations

Keep the media product, test density, design depth, and storage assumptions attached to the maintenance plan. Repeated bare patches and uneven drainage deserve measurements of media depth and distribution, alongside plant observations. A displaced or eroded medium changes the assembly's storage and load distribution as well as its appearance.

Inspect the drain chambers and paths from planted zones into the drainage layer. Record ponding separately from media moisture so a saturated planting is not confused with a blocked outlet. After replanting or media replacement, update the affected zone instead of treating the roof as unchanged because the same square footage remains green.

New planting areas and removals change the size of a maintenance territory; PorchRocket Asset Search monitors visible roof changes with dated views and the owner of record for each find.

Distinctions

Roof garden
An accessible amenity roof can combine planted beds, paving, furnishings, and other loads. Its planted area is only one part of the total assembly.
Ground planting soil
Engineered roof media has tested density and hydraulic properties for the rooftop assembly. A garden-soil volume is not a substitute media specification.

Frequently asked questions

Does a green roof retain its full storage capacity in every storm?

Available storage is the difference between retained-water capacity and the moisture already present. Consecutive storms can arrive before the medium has drained and dried enough to restore that capacity.

Is the planted area the same as roof area?

Measure planted zones separately from perimeter bands, paths, pavers, and equipment clearances. That planted boundary is the area used for the media-storage calculation.

Sources checked

Where this shows up

Related guides

Next step: Locate planted roof accounts

Back to the full field glossary