ANVILFIELD Try FieldOS

Concrete

SSPC-PA 2 dry film thickness inspection field guide

A field procedure for rough-steel gage setup, spot and area arithmetic, thickness failure mapping, and auditable repair retests.

SSPC-PA 2Dry film thicknessProtective coatingsCoating inspection

Direct answer

Under SSPC-PA 2-2015, editorial revision 2018, ordinary metal-coating inspection averages at least three gage readings at separate positions within a roughly 1.5-inch-diameter circle into a spot, then averages five randomly spaced spots for each sampled 100-square-foot area. Its default Level 3 allows spot averages from 80% of the specified minimum to 120% of the specified maximum, while each area average meets the specified range. Adjust the gage for the actual substrate first, then map thickness failures even when the overall average passes. [S10]

On this pageHow does SSPC-PA 2 determine DFT conformance?What DFT range and restriction level should you enter?How do you verify and adjust a DFT gage on rough steel?How many readings, spots and areas do you need?Can thin spots fail when the overall average passes?Worked conformance example: 2,500 square feet of coated steelWhat causes suspect DFT readings at edges, welds and old coatings?How do you map the extent of nonconforming thickness?How do you repair and retest thin or thick coating?How much inspection time should you allow?Field checklist and auditable DFT reportWhat inspection scope should a tank owner buy?Sources, review date and how to cite this guide
Need to run this in the field?

Open the related tool for the calculation, checklist, or packet.

How does SSPC-PA 2 determine DFT conformance?

Under SSPC-PA 2-2015, editorial revision 2018, ordinary metal-coating inspection averages at least three gage readings at separate positions within a roughly 1.5-inch-diameter circle into a spot, then averages five randomly spaced spots for each sampled 100-square-foot area. Its default Level 3 allows spot averages from 80% of the specified minimum to 120% of the specified maximum, while each area average meets the specified range. Adjust the gage for the actual substrate first, then map thickness failures even when the overall average passes. [S10]

SSPC-PA 2 compares dry film thickness, or DFT, with the project's required range; it does not choose that range. Its scope covers nonmagnetic coatings over ferrous metal and nonmagnetic, nonconductive coatings over nonferrous metal. Type 1 magnetic pull-off gages apply to ferrous substrates; Type 2 electronic equipment needs the correct probe for the substrate. [S1] [S9]

Thickness conformance answers one acceptance question. Cure, adhesion, continuity, surface preparation and service readiness require their own evidence. Use the [industrial protective coatings and abrasive blasting guide](/field-guides/concrete/industrial-protective-coatings-blasting/) for the preparation and application sequence; use the records below for reproducible thickness decisions.

Which documents control the job?

ANSI lists SSPC-PA 2-2022 as the most recent edition, and ASTM lists D7091-22 as active. The numerical PA 2 procedures identified here are attributed to the publicly available 2015 text with its November 2018 editorial revision; record and use the edition invoked by the contract, including its selected alternatives. ASTM D7091 addresses gage measurement, while PA 2 supplies the area-based conformance framework. [S1] [S9] [S10]

Before setting instrument limits, record substrate, product, coat stage, layer and total thickness ranges, restriction level and any geometry-specific procedure. Resolve conflicting specification and product requirements in writing before selecting the instrument mode.

What DFT range and restriction level should you enter?

Enter the specified minimum and maximum for the coat or system being inspected. ASTM D7091-22 assigns those limits to the governing specification; a product's broad application envelope does not automatically become the project's acceptance window. [S9]

Under SSPC-PA 2-2015, editorial revision 2018, default Level 3 criteria, a 4.0 to 6.0 mil coating specification permits spot averages from 3.2 to 7.2 mils, while each sampled area must still average 4.0 to 6.0 mils. Anvilfield calculates those spot limits by multiplying the specified minimum by 0.80 and maximum by 1.20. Level 1 permits no spot deviation from the specified range; Level 5 leaves the spot and area maxima unrestricted. Enter the actual restriction level rather than applying Level 3 to every contract. [S10] [S3]

Keep layer acceptance separate from system acceptance. A project specifying a 3.0 to 4.0 mil primer and a 4.0 to 6.0 mil finish has a calculated cumulative range of 7.0 to 10.0 mils. Preserve the primer inspection before covering it: a passing final total cannot identify which buried coat supplied the thickness. [S9] [S10]

The 2015/2018 PA 2 single-target provision uses a range of plus or minus 20% only when one thickness is specified and the manufacturer provides no recommended range. Establish that range before applying any selected spot restriction; the single-target provision and Level 3 spot allowance perform different jobs. [S10]

Why do manufacturer windows differ?

Tnemec N69's January 7, 2025 product data sheet specifies 2.0 to 10.0 mils per coat. Jotun's historical 2015 Penguard Express brochure lists 75 to 250 micrometers for Express and 100 to 250 micrometers for Express CF. These are different products and service designs; a present job uses its applicable local-market product data sheet. One mil equals 25.4 micrometers. [S12] [S13]

The worked atmospheric N69 inspection below uses a project-selected 4.0 to 6.0 mil range within that product envelope. Save the instrument settings with the report; a software default cannot override a specified maximum.

How do you verify and adjust a DFT gage on rough steel?

Calibration establishes instrument performance through controlled reference measurements; verification checks accuracy against an identified reference; adjustment compensates for the actual measurement conditions. DeFelsko's calibration terminology distinguishes a Type 1 base metal reading, which is subtracted from coated readings, from a correctly adjusted Type 2 result, which reports coating thickness directly. [S5]

DeFelsko's PosiTector 6000 Full Guide v7.7 calls for accuracy verification at the beginning and end of each work shift and when the instrument has been dropped or erroneous readings are suspected. A failed end check makes results since the last successful check suspect: identify and remeasure the affected locations with a verified instrument before acceptance. Set the periodic calibration interval from use and environment; one year is the manufacturer's typical starting point. [S6]

PA 2-2015/2018 section 5.3 also advises checks during acquisition, for example hourly when collecting many measurements. Choose and log those intervals before work; shorter intervals reduce the amount of data requiring remeasurement after a failed check. [S10]

Type 1: determine the base metal reading

SSPC-PA 2-2015/2018 requires at least 10 distributed bare-substrate readings for the Type 1 base metal reading, or BMR. Worked inputs of 0.6, 0.7, 0.8, 0.7, 0.6, 0.9, 0.8, 0.7, 0.6 and 0.6 mil total 7.0 mils and average 0.7 mil. Subtracting that BMR from a 5.7-mil coated indication gives 5.0 mil DFT. [S10]

Verify a Type 1 gage on certified coated metal plates with a thickness within its expected working range, as PA 2-2015/2018 section 6.1 requires. Use plastic shims only with explicit manufacturer approval; their movement can distort pull-off readings. Do not mechanically zero the gage to hide substrate bias. [S10] [S5]

Type 2: adjust on representative steel

A representative coupon must match steel response, thickness, curvature and blast preparation. DeFelsko v7.7 describes averaged one-point and two-point adjustments, typically using 3 to 10 readings per average; Elcometer 456 Issue 10 recommends Rough/2 Point with foils below and above the expected film thickness. [S6] [S8]

Verify the certified smooth standard in the appropriate reference setting, then restore the job adjustment and confirm it with a representative-substrate shim check. Applying the rough-steel setting to a smooth plate can shift its reading. [S6] [S17]

The following record uses worked inputs. Its 4.8 to 5.2 mil verification window assumes a documented sum-of-limits rule: a 5.0-mil standard with 0.1-mil tolerance plus an assumed 0.1-mil probe tolerance. That window checks the instrument/reference combination; the coating acceptance limits remain separate.

Gage adjustment and verification record: worked inputs
FieldFilled worked entryMeaning / retained evidence
Date / lot2026-11-05 / LOT-2500Worked record date and lot identifier
Coated area / unit system2,500 ft² / US customaryCoated surface
Coat / project rangeN69 coat / 4.0 to 6.0 milsProject acceptance range
Acceptance modePA 2, Level 3Spot 3.2 to 7.2; area 4.0 to 6.0 mils
Gage / probeType 2 / worked IDs BODY-01, PROBE-01Enter actual serial numbers on the job
Calibration referenceTraceable certificate required; enter the physical certificate ID on the jobRecord actual certificate number/date on a job
Substrate referenceCoupon RC-01, same steel, geometry and blast preparationRepresentative coupon assumption
Adjustment foils2.0 and 8.0 milsWorked bracketing inputs for the 4.0 to 6.0 range
Independent verification reference5.0 mil coated standard, tolerance ±0.1 milRetain actual reference certificate
Probe tolerance±0.1 mil at verification thicknessAssumed probe accuracy
Worked verification window4.8 to 5.2 milsDocumented sum-of-limits rule for these inputs
Start / end reference readings4.9, 5.0, 5.1 / 5.0, 5.1, 5.2 milsMeans 5.0 / 5.1 mils; both within the example window
Saved reference / work setupsREF-01 / ROUGH-RC-01Verify smooth standard in REF-01; restore ROUGH-RC-01 for coated steel and representative shim check
Restored job-setting check5.0-mil shim on RC-01: 4.9, 5.0, 5.1 milsMean 5.0 mils; record shim tolerance and job setting
Additional subtraction0.0 milRough-steel adjustment already incorporated
Alternative Type 1 routeTen bare readings total 7.0 mil; BMR 0.7 milCorrected 5.7 indicated = 5.0 mil DFT; separate from Type 2 dataset

Roughness correction decision table

Never subtract peak-to-valley blast profile as though it were gage bias. A 3-mil profile does not turn a correctly adjusted 5-mil DFT result into 2 mils. Elcometer Issue 10's ISO 19840 zero-offset route uses 10, 25 and 40 micrometer corrections for fine, medium and coarse ISO 8503-1 categories; apply those only within that selected route, without adding them to an already adjusted Type 2 result. [S8] [S17]

Roughness correction decisions by measurement route
Instrument / setupRequired field inputCorrection appliedWorked resultAuthority
Type 1 on prepared bare steelAt least 10 bare readingsSubtract measured BMR5.7 - 0.7 = 5.0 milPA 2-2015/2018 section 6; DeFelsko terms
Type 2 adjusted with shims on matching rough steelManufacturer adjustment; representative substrateRead adjusted display directly5.0 displayed = 5.0 mil DFTDeFelsko v7.7; Elcometer Issue 10
Smooth-adjusted gage using agreed ISO fine-profile routeISO 8503-1 fine gradeSubtract 10 µm, about 0.4 mil135 - 10 = 125 µmElcometer Issue 10, ISO 19840 mode
Same, medium-profile routeISO 8503-1 medium gradeSubtract 25 µm, about 1.0 mil150 - 25 = 125 µmSame
Same, coarse-profile routeISO 8503-1 coarse gradeSubtract 40 µm, about 1.6 mil165 - 40 = 125 µmSame
Profile unknown and no representative bare steelAgreed alternate method and documented basisNo invented fixed deductionHold thickness disposition until method establishedASTM D7091-22; manufacturer route
Peak-to-valley profile is 3.0 milsProfile measurement is an anchor-pattern resultDo not subtract it as a BMRProperly adjusted 5.0 mil remains 5.0 milDeFelsko accuracy/terms

How many readings, spots and areas do you need?

Using the ordinary US-unit sampling schedule in SSPC-PA 2-2015, editorial revision 2018, a 2,500-square-foot coated lot requires five sampled areas, 25 spot measurements and at least 75 gage readings before nonconformance expansion or special geometry provisions. Select three areas in the first 1,000 square feet, one in the second 1,000 and one in the remaining 500. Anvilfield estimates the initial inspection quantities below from that schedule. [S10]

For lots at or below 300 square feet, measure each 100-square-foot area or remainder; above 300 through 1,000 square feet, select three areas. Above 1,000, add one sampled area for every further 1,000 square feet or remainder. In words, subtract the first 1,000, round the remaining thousand-square-foot increments upward, then add three: areas = 3 + ceiling((coated square feet − 1,000) / 1,000). [S10]

Define the lot, coat stage, work shift and actual coated surface before choosing locations. A tank's footprint is not its shell coating area. Keep the standard's metric and US-unit schedules independent: it pairs approximately 10 square meters with 100 square feet, although exact conversion gives 9.29 square meters. Do not switch threshold systems halfway through an inspection. [S10]

Ordinary US-unit initial sampling planner, PA 2-2015/2018
Total coated lot, ft²Selection logicSampled areasSpotsMinimum readings
80Entire smaller area1515
250Each 100-ft² area plus final 5031545
300Each of three 100-ft² areas31545
301Three selected areas in >300 to 1,000 tier31545
1,000Three selected areas31545
1,001Three plus one in remaining increment42060
2,500Three + one + one52575
12,500Three + twelve additional increments1575225

Average readings into spots, then spots into areas

First average accepted readings within each spot; then average the five spot results with equal weight. Spot mean = sum of readings / reading count; area mean = sum of five spot means / 5. If one spot has six readings averaging 4.0 mils and four spots have three readings each averaging 6.0 mils, the correct area mean is 5.6 mils; pooling all 18 readings gives 5.33 mils and overweights the first spot. [S3] [S10]

Preassign area IDs and randomly distribute five spots across each selected area, as PA 2-2015/2018 section 8.2 requires. Move the probe within each spot for each reading; three repeated placements at one point do not sample its thickness variation. Separate targeted edge and defect checks from ordinary sampling. Repeat suspect readings locally; replace an excluded nonrepeatable reading to preserve the minimum accepted count and retain the exclusion reason. Repeatable thin film stays in the record. [S10]

Can thin spots fail when the overall average passes?

Yes. The selected Level 3 spot limits and area limits are separate tests. Each low spot, excessive spot and under-thickness area requires disposition. DeFelsko's PA2 instructions explicitly organize conformance around both spot and area results. [S3]

Individual gage readings contribute to spots; separately specified local requirements and visible defects need their own decisions. [S10]

Decide near-limit results at retained instrument precision under the agreed decision rule. A calculated 3.17-mil spot fails a 3.20-mil minimum even if a one-decimal display shows 3.2. Instrument accuracy is not an extra allowance to add to the coating limits.

Level 3 decisions for a 4.0 to 6.0 mil project range
Result / objectApplied criterionDecisionAction
Repeatable individual reading 2.8 milContributes to spot, not a standalone area decisionRetain readingComplete/recheck the spot and any separate local defect requirement
Spot 3.0 mil, area mean 5.2 milSpot must be at least 3.2Fail low spotMap and repair affected coating
Spot 3.2 mil, area mean 5.0 milSpot at lower limit; area in 4.0 to 6.0Pass these criteriaRetain measurements
Spot 7.2 mil, area mean 5.8 milSpot at upper limit; area within rangePass these criteriaRetain measurements
Spot 8.0 mil, area mean 5.6 milSpot cannot exceed 7.2Fail high spotMap; obtain coating-specific disposition
Every spot 3.4 milSpot floor satisfied; area mean 3.4 < 4.0Fail areaRepair/retest area
Grand mean 4.92 mil with A/B/C failuresEach applicable spot and sampled area must conformLot not accepted from grand meanResolve each failure
Boundary spot 3.8 milDelineation uses specified 4.0 to 6.0 rangeNonconforming map pointContinue boundary checks

Worked conformance example: 2,500 square feet of coated steel

Anvilfield estimates the inspection quantities and labor below; thickness decisions are calculated from the stated worked inputs. LOT-2500 is one atmospheric N69 coat-stage lot with a project range of 4.0 to 6.0 mils, Level 3 selection and US-unit sampling. The Type 2 gage has been adjusted over matching rough steel, so these displayed DFT readings receive no further subtraction.

Areas A through E are selected 100-square-foot areas. Each contains five spots with three readings per spot; all 75 inputs are retained below.

Initial dataset: all readings and spot means in mils
AreaSpotReading 1Reading 2Reading 3Spot meanSpot result
AA12.83.03.23.0Fail low
AA24.85.05.25.0Pass
AA35.35.55.75.5Pass
AA45.86.06.26.0Pass
AA56.36.56.76.5Pass
BB13.23.43.63.4Pass
BB23.33.53.73.5Pass
BB33.43.63.83.6Pass
BB43.53.73.93.7Pass
BB53.63.84.03.8Pass
CC13.84.04.24.0Pass
CC24.85.05.25.0Pass
CC35.35.55.75.5Pass
CC45.35.55.75.5Pass
CC57.88.08.28.0Fail high
DD13.84.04.24.0Pass
DD24.34.54.74.5Pass
DD34.85.05.25.0Pass
DD45.35.55.75.5Pass
DD55.86.06.26.0Pass
EE14.64.85.04.8Pass
EE24.85.05.25.0Pass
EE35.05.25.45.2Pass
EE45.25.45.65.4Pass
EE55.45.65.85.6Pass
Area results: means in mils
AreaFive spot means, milArea mean, milArea range aloneCombined decision
A3.0, 5.0, 5.5, 6.0, 6.55.2PassFail A1 low spot
B3.4, 3.5, 3.6, 3.7, 3.83.6FailFail under-thickness area
C4.0, 5.0, 5.5, 5.5, 8.05.6PassFail C5 high spot
D4.0, 4.5, 5.0, 5.5, 6.05.0PassPass these DFT criteria
E4.8, 5.0, 5.2, 5.4, 5.65.2PassPass these DFT criteria
Grand mean(5.2 + 3.6 + 5.6 + 5.0 + 5.2) / 54.92Not the acceptance unitA, B and C still fail

A fails on A1 despite its acceptable area mean. B fails its area minimum even though every spot passes; C fails on its excessive C5 spot. The passing 4.92-mil grand mean cannot reverse those decisions.

Map the failed areas to establish repair quantities; calculate the repair proportion from measured repair footprints and the full coated area.

What causes suspect DFT readings at edges, welds and old coatings?

Edges, curvature, thin steel and changing metal response can shift a gage result. Verify the probe on representative uncoated geometry before accepting measurements from those locations. DeFelsko's accuracy guidance requires model-specific geometry checks rather than a universal edge setback. [S17]

Use the appropriate probe and the invoked geometry procedure at welds and edges. Stripe coating controls application at difficult details; local DFT and any required continuity testing still need valid measurements. For overcoating, the magnetic or electronic total includes measurable old layers between the probe and metal. If added thickness matters, retain precoat baselines at relocatable positions and preserve the uncertainty of both measurements when subtracting. [S6] [S9] [S10]

Measure when the film is dry and firm enough for the probe without indentation. Dry-to-touch, recoat readiness and immersion cure are different endpoints. A dry-film gage does not supply wet-film thickness or prove that a lining has cured. [S6] [S12]

Concrete needs its applicable substrate measurement route. See [resinous floor installation](/field-guides/concrete/epoxy-resinous-floor-coating-install/), [concrete sealers and coatings](/field-guides/concrete/concrete-sealers-coatings-protection/) and [traffic-deck waterproofing](/field-guides/roofing/traffic-deck-waterproofing-coating/) for those systems. [Roof coating thickness and yield](/field-guides/roofing/roof-coating-mil-thickness-yield/) addresses application consumption, a separate calculation from metal-coating acceptance.

When do scanning and special geometry change the plan?

Identify the invoked beam, pipe, edge, panel or scanning procedure before collecting data. The public 2015/2018 PA 2 sample already includes scanning Appendix 10, and Elcometer's rapid-measurement evaluation distinguishes scan populations from ordinary spot sampling. Preserve scan grouping and software settings. Elcometer's evaluation also found that probe-tip wear can shift scanning results, especially on rough coatings; include tip inspection and accuracy checks in the scanning plan. [S10] [S11]

PA 2-2022 lists a separate Appendix 11 for intumescent/fireproofing and cryogenic spill protection. Record the invoked special-coating procedure and approved system limits before measuring those systems. [S19]

How do you map the extent of nonconforming thickness?

The public SSPC-PA 2-2015/2018 procedure delineates nonconforming thickness with spot checks at 5-foot intervals in eight directions, using the specified thickness range and continuing to two consecutive conforming spots in each available direction. Expansion starts from the failed 100-square-foot area and extends within the surface coated during the work shift. A boundary spot of 3.8 mils fails this example's 4.0 to 6.0 mil mapping range, despite clearing the ordinary 3.2-mil Level 3 spot floor. [S10]

Area A is a 10-by-10-foot square centered at zero, with east as positive x and north as positive y. Anvilfield's map starts cardinal rays at side midpoints and diagonal rays at corners, measuring outward along the surface. N5 is at (0,10), N10 at (0,15), and N15 at (0,20); NE5 is at (8.54,8.54), five feet along the diagonal from (5,5).

The worked coated-shift surface extends at least 20 feet beyond every ray origin. Keep the original failed area, failing-spot neighborhoods, repair footprints and work-shift boundary as distinct map layers. The map and table locate and retain all 51 boundary readings.

Area A boundary measurement mapTen-foot square area A with eight outward rays. North checks are five, ten and fifteen feet beyond its edge. Dashed red circles identify five-foot noncompliant neighborhoods around A1 and N5. The outer work-shift boundary is not shown.Failed AA1N5: 3.8 failsN10: 4.2N15: 4.6NEESESSWWNWCoated work-shift boundary lies beyond this detail
Map scale: 8 drawing units per foot. Red circles show noncompliant neighborhoods; the repair register records the approved work.
Area A boundary record: all readings and means in mils
Ray5 ft beyond A perimeter: readings → mean10 ft: readings → mean15 ft: readings → meanBoundary decision
N3.6, 3.8, 4.0 → 3.84.0, 4.2, 4.4 → 4.24.4, 4.6, 4.8 → 4.6N5 fails; two conforming spots reached at N15
NE3.8, 4.0, 4.2 → 4.04.0, 4.2, 4.4 → 4.2StopTwo consecutive conforming spots
E3.9, 4.1, 4.3 → 4.14.1, 4.3, 4.5 → 4.3StopTwo consecutive conforming spots
SE3.8, 4.0, 4.2 → 4.04.2, 4.4, 4.6 → 4.4StopTwo consecutive conforming spots
S4.0, 4.2, 4.4 → 4.24.3, 4.5, 4.7 → 4.5StopTwo consecutive conforming spots
SW3.8, 4.0, 4.2 → 4.04.1, 4.3, 4.5 → 4.3StopTwo consecutive conforming spots
W3.9, 4.1, 4.3 → 4.14.0, 4.2, 4.4 → 4.2StopTwo consecutive conforming spots
NW3.8, 4.0, 4.2 → 4.04.2, 4.4, 4.6 → 4.4StopTwo consecutive conforming spots

Under the 2015/2018 procedure, mark the area within five feet of a failing spot noncompliant; retain compliant locations preceding a later failure on the same ray as suspect for reinspection after correction. On repeating units smaller than ten feet in their largest dimension, use the specified repeating-unit route where five-foot spacing is impractical. Record physical and work-shift stopping limits; inaccessible coating retains an unresolved disposition. [S10]

Area A requires 17 added spots and at least 51 readings. Its north ray needs a third spot because N5 fails; the other seven rays stop after two conforming spots. B and C need separate delineation. Measure the actual repair footprint separately.

How do you repair and retest thin or thick coating?

Repair thin film with approved preparation and a compatible added coat within the product's permitted build and recoat conditions. Thick film needs product-specific disposition: another coat cannot remove excessive existing build. Preserve the original measurements, identify the repair envelope, then record new readings under linked retest IDs. [S12]

Tnemec N69's January 7, 2025 data sheet lists, at 5-mil DFT without accelerator, 9 hours to handle, 12 hours to recoat and 7 days to immersion at 70°F; at 50°F the values are 24 hours, 32 hours and 12 to 14 days. For N69 recoating after 60 days, immersion service requires scarification; atmospheric service requires scarification or an epoxy tie coat. The same sheet gives earlier preparation triggers for some other topcoats over exposed N69 primer. Select the actual topcoat and exposure route, and allow for surface temperature, air movement, humidity and film build when scheduling cure. [S12]

The worked repair plan adds 2.2 mils at matched A1 points and 2.0 mils at matched B points, meeting N69's per-coat minimum. C5 is removed, prepared and reinstated at 5.2 mils. The repair disposition retains the project stage's area and spot limits and defines cumulative acceptance; protect adjoining sound film from excessive added build.

Linked repair and retest register: thickness in mils
Defect IDOriginal failureCorrective work recordNew spot means / readings, milRecomputed area meanRequired closeout
A1 / R-AA1 3.0 < 3.2Approved local N69 repair, 2.2 mil added at the A1 matched pointsA1 retest 5.0, 5.2, 5.4 gives 5.2; other four spot means rechecked at 5.0, 5.5, 6.0, 6.55.64All five spots satisfy 3.2 to 7.2; affected boundary spots rechecked within 4.0 to 6.0; retain map and raw retest readings
B-area / R-BArea mean 3.6 < 4.0Approved additional N69 coat, 2.0 mil at the matched B pointsRetest spot means B1-B5: 5.4, 5.5, 5.6, 5.7, 5.85.6Area/spot criteria pass; map and retest expanded extent and any suspect areas
C5 / R-CC5 8.0 > 7.2Approved removal, preparation and N69 reinstatement at thick-film envelopeC5 retest 5.0, 5.2, 5.4 gives 5.2; other spot means rechecked at 4.0, 5.0, 5.5, 5.55.04Retest area passes; complete product-specific disposition and boundary/suspect retest
D / EOriginal thickness checks passNo thickness repair assignedOriginal area means 5.0 / 5.25.0 / 5.2Retain original records and any separately required tests

A1 and C5 retests each use 5.0, 5.2 and 5.4 mils. A2 through A5 and C1 through C4 have new retest triplets equal to their original values. B1 through B5 use (5.2,5.4,5.6), (5.3,5.5,5.7), (5.4,5.6,5.8), (5.5,5.7,5.9) and (5.6,5.8,6.0). These inputs reproduce area means of 5.64, 5.60 and 5.04 mils for A, B and C.

N5 receives a 2.0-mil repair coat; its readings of 5.6, 5.8 and 6.0 average 5.8 mils; all other 16 boundary points receive new retest records, with worked values matching the boundary table. A and its boundary close when those checks pass. B and C remain open until their separate boundary results and required dispositions are attached. Use the [tank coating and interior lining guide](/field-guides/concrete/storage-tank-coating-lining-interior/) for cure, continuity and return-to-service release beyond DFT acceptance.

How much inspection time should you allow?

Anvilfield estimates 73 minutes for the accessible 2,500-square-foot initial sampling exercise. The estimate includes setup, measurements, relocation and reporting; expanded defect checks, access arrangements, repairs and return visits need separate time allowances.

Method: the November 5, 2026 estimate adds the four task allowances below. Reading time is the required reading count multiplied by the assumed seconds per placement, divided by 60. The five-area quantity comes from PA 2-2015/2018; task times are Anvilfield planning inputs.

Anvilfield estimates: initial inspection time
TaskMinutesBasis
Setup, verification and adjustment20Planning allowance
Acquire 75 readings12.575 × 10 seconds / 60
Move between selected locations25Accessible-site allowance
Report and reconcile data15Planning allowance
Total initial work72.5, about 73Sum of the four tasks

Area A's 51 added boundary readings add 8.5 minutes of acquisition at the same assumed pace, plus travel and mapping. B and C need their own expansion, followed by repairs and retests. Split fixed setup time from repeated measurement work in the [storage tank coating bid scope](/field-guides/concrete/storage-tank-coating-bid-scope/), and schedule inspection while the required access is available.

Field checklist and auditable DFT report

PA 2-2015/2018 section 10 requires instrument and reference-standard identification, calibration date, adjustment-shim thickness, BMR where used, spot/area measurements, operator and measurement date. The record below adds raw readings and linked repairs so another inspector can reproduce each decision. [S10] Keep the original export read-only and append repair records; replacing failed rows with passing rows destroys the history that explains the repair. For garage work, attach exposed-metal coating records to the phased closeout map in the [parking structure restoration guide](/field-guides/concrete/parking-structure-restoration-repair/).

Test the export before production sampling. Elcometer 456 Issue 10 states that Counted Average saves its average without the individual readings, so use a verified separate capture route when retaining raw values. [S8]

  1. Identify substrate, product, coat stage, lot, shift and actual coated surface area; assign the applicable measurement route.
  2. Record the invoked edition, layer and cumulative ranges, restriction level and geometry provisions; resolve conflicting inputs.
  3. Identify gage and probe models/serials, calibration date, certificate and reference-standard IDs/values; verify shift-start accuracy and retain actual results.
  4. Document representative substrate and Type 2 adjustment or Type 1 BMR; save reference and work setups separately.
  5. Label sampled areas and spot locations; confirm the export retains individual readings and setup IDs.
  6. Acquire the required readings; retain repeatable lows and document excluded nonrepeatable readings and replacements.
  7. Calculate spots first and areas second; record each decision under its applicable limits.
  8. Map each failed area and expanded boundary, including stopping reasons, suspect locations and inaccessible coating.
  9. Link approved preparation, repair product, added build, cure conditions, retests and photographs to the original defect.
  10. Verify shift-end accuracy; recover affected measurements after a failed check, and deliver separate system-release records.

What columns reproduce the decision?

Use one row per reading with record_id, lot_id, shift_id, coat_stage, area_id, spot_id, local_x_ft, local_y_ft, reading_index, reading_mil, correction_method, correction_mil, corrected_mil, accepted and exclusion_reason. Add spot_mean_mil, area_mean_mil, spec_min_mil, spec_max_mil, restriction_level, decision_type, decision, defect_id, retest_of, setup_id and source_edition. Finish with ray_id, distance_from_area_ft, boundary_stop_reason, timestamp, probe_id and operator_id.

For this Type 2 dataset, record rough-steel shim adjustment as the method, zero additional subtraction, and corrected thickness equal to displayed thickness. Boundary rows use the decision type “delineation versus specified range” and leave area mean empty. Missing values stay distinct from zero; every retest receives a new record ID even when readings match the original.

What inspection scope should a tank owner buy?

Buy a defined measurement and closeout package: asset ID, shell/roof/interior zones, actual coated area, substrate, coat stage, lot/shift divisions, access, hold points, boundary mapping and linked retests. Specify inspection frequency by application stage and the required evidence at each hold point. Visible dimensions support planning; field access and owner documents determine the measurement scope.

Attach owner records, coating schedules, service exposure and repair maps to each vessel in the account register. Coating contractors building a tank account register use [PorchRocket Asset Search](/asset-search?for=tanks) for a reviewed list of visible storage tanks and the owner of record at each site.

Use the [aboveground storage tank glossary](/field-guides/glossary/aboveground-storage-tank/) and [water tower glossary](/field-guides/glossary/water-tower/) for consistent asset names, and the [water tower inspection and coating guide](/field-guides/concrete/water-tower-inspection-and-coating/) for the broader owner program.

Sources, review date and how to cite this guide

Byline: Anvilfield. Sources checked November 5, 2026; editions and revisions listed below. Catalog entries identify standards and scope; the numerical PA 2 procedures above cite the public 2015/2018 text.

Update log: 2026-11-05: Reviewed numerical rules and manufacturer instructions; clarified sampling, recoat conditions and retests; corrected map spacing and expanded verification records; removed prices.

Cite individual tables using their linked fragment, table name and underlying authority/edition.

How to cite this page: Anvilfield, SSPC-PA 2 dry film thickness inspection field guide, 2026, https://anvilfield.com/field-guides/concrete/coating-dft-sspc-pa2-conformance/

Related tools

Next step: Monitor tank changes

FAQ

How does SSPC-PA 2 dry film thickness sampling and conformance work?

Average at least three readings into each spot, five spots into each sampled area, then check both spot and area limits. This is the ordinary procedure in SSPC-PA 2-2015, editorial revision 2018; use the contract-invoked edition. Source: PA 2-2015/2018, section 8.

How are coating DFT spot and area averages calculated?

Average the readings within each spot first, then give the five spot averages equal weight in the area mean. Source: DeFelsko PA2 addendum v7.0.

How do you adjust a DFT gage on rough steel?

Use representative bare steel and the actual Type 2 manufacturer's shim-adjustment method, or the Type 1 BMR procedure. Source: DeFelsko PosiTector 6000 v7.7.

Can thin spots fail when the overall average passes?

Yes; under PA 2-2015/2018 on a 4.0 to 6.0 mil Level 3 job, a 3.0-mil spot fails the 3.2-mil spot minimum even when the area average passes. Source: PA 2-2015/2018, section 9.

Can every spot pass but the area fail PA 2?

Yes; five 3.4-mil spots clear a 3.2-mil spot floor but fail a 4.0-mil area minimum. Source: DeFelsko PA2 addendum v7.0.

Do I subtract the blast profile from a DFT reading?

Do not subtract peak-to-valley profile; use the actual BMR or the selected manufacturer adjustment route. Source: DeFelsko Calibration Terms.

How many readings are needed for 2,500 square feet?

SSPC-PA 2-2015/2018 ordinary US-unit sampling requires five sampled areas, 25 spots and at least 75 readings before defect expansion or special geometry requirements. Source: PA 2-2015/2018, section 8.

Is ISO 19840 the same as SSPC-PA 2?

No; identify the invoked sampling and acceptance procedure separately, and apply an ISO roughness offset only within the selected adjustment method. Source: Elcometer 456 Issue 10.

How often should a DFT gage be calibrated and checked?

Verify at shift start and end and after suspected damage, while setting periodic calibration from use and environment, with one year a manufacturer starting point. Source: DeFelsko PosiTector 6000 v7.7.

Does passing DFT inspection mean a tank lining is ready for service?

No; product-specific cure, continuity and other specified release requirements still need their own records. Source: Tnemec N69 PDS, January 7, 2025.

Does a passing total DFT prove every coat meets its thickness requirement?

No; retain each coat-stage result because a final total cannot isolate buried layers, and check the cumulative specified range separately. Source: ASTM D7091-22 and PA 2-2015/2018.

Can I round a low spot up to pass SSPC-PA 2?

Compare the retained mean with the limit first: 3.17 mils fails a 3.20-mil floor even if a one-decimal display shows 3.2. Source: PA 2-2015/2018 limits; Anvilfield calculation.

People also ask

Codes cited in this guide

This guide is written and reviewed against the published standards below. Always confirm the current adopted edition with the authority having jurisdiction.

ASTM D7091ASTM D7091-22ISO 19840ISO 8503