ANVILFIELD Try FieldOS

Field glossary · measurement

Annular space

Measure annular space radially around the penetrant, using the installed outside diameter including any through-penetration insulation. A centered 4 inch outside diameter in a 6 inch core leaves 1 inch of clearance all around; moving it 3/4 inch off center produces gaps from 1/4 to 1 3/4 inches. A firestop system must accommodate those extremes and permit the actual centered or offset arrangement.

The gap between the pipe and the edge of the opening, with a tested min and max

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

Calculate the smallest and largest gap

For a 6 inch circular opening around a penetrant measuring 4 inches outside diameter, centered annular space is (6 - 4) / 2 = 1 inch. Moving the penetrant center 3/4 inch creates a 1/4 inch gap on one side and a 1 3/4 inch gap opposite it. The opening diameter has not changed, but the required system range has.

Specified Technologies’ 2019 guidance says the system identifies whether the penetrant must be concentric, can be eccentric, or permits either arrangement. Passing the numerical gap limits alone does not override a centered-installation requirement. The pipe-penetration guide relates that geometry to the tested assembly; insulation continuing through the opening belongs in the outside-diameter measurement.

Zero minimum does not mean unrestricted contact

The International Firestop Council explains that a listed 0 inch minimum permits a single point of contact; contact around the entire circumference requires explicit continuous-contact permission. A zero in the range is therefore not a general allowance to wedge any penetrant tightly into the opening.

Specified Technologies’ 2019 point-contact guidance distinguishes single contact from 360-degree contact and says a listing allowing the first does not automatically allow the second. Inspect the actual shape before ordering a sealant quantity. An irregular core with several contact areas is a different geometry from a round pipe touching one edge.

Sealant depth and a contact bead are different dimensions

Specified Technologies uses a 1/4 inch point-contact bead to explain the difference between its applied diameter and its tooled fillet profile. The manufacturer describes a resulting fillet measuring about 1/4 by 1/4 inch at the two bonding faces. Select the bead dimensions and open-annulus sealant depth independently from the actual system detail.

An installer measuring only the open-side depth can miss an unsealed contact line on the opposite side. Inspect and photograph that interface before access is obstructed by adjacent services. The cabling firestop guide covers the records needed when bundles are changed later.

Estimate the opening area without confusing it with clearance

The centered 6 inch opening and 4 inch penetrant leave an open cross-sectional area of pi x (6 squared - 4 squared) / 4, or about 15.71 square inches. That area supports a material estimate; it does not show whether local clearances meet the listing. Offset changes clearance extremes while leaving that area unchanged.

Distinctions

Sealant depth
Measured through the wall or floor direction. Annular clearance is measured across the opening.
Cable fill
Describes how much opening area cables occupy; the same fill percentage can produce very different local gaps.

Frequently asked questions

Does a 2 inch diameter difference give a 2 inch annulus?

For centered round parts, divide the diameter difference by two. A 2 inch difference produces a 1 inch radial gap.

Can I average an uneven annular space?

Compare the actual minimum and maximum clearances with the listed range. An average conceals an excessive gap or an unpermitted contact location.

Sources checked

Where this shows up

Next step: Find firestop retrofit work

Back to the full field glossary