Field glossary · material
B&B (balled-and-burlapped)
A B&B order buys a tree with a retained soil ball rather than a bare-root plant; the initials mean balled-and-burlapped. AmericanHort's ANSI Z60.2-2025 lists a 32-inch-wide, 19-inch-deep minimum ball for a 3-inch-caliper Type 1 shade tree. Measure those dimensions at receiving: neither the basket size nor the tree's apparent height establishes compliance with that specification.
Field-grown stock dug with a soil ball wrapped in burlap and usually a wire basket
How nursery caliper is measured on B&B trees
AmericanHort's ANSI Z60.2-2025 measures field-grown tree caliper 6 inches above ground and moves the measurement to 12 inches when the diameter at the lower position reaches 4½ inches. Record the height used beside the diameter on the receiving sheet. A diameter taken at breast height belongs to a different measurement system and cannot be substituted on a nursery order.
The standard organizes minimum ball sizes by plant type and size. Identify the applicable plant group before comparing the delivery with its schedule: a tall, narrow conifer and a shade tree are not accepted from the same height-only rule. Carry the nursery size specification into the tree planting record alongside the supplier tag.
Root-ball depth: use the plant schedule, not false precision
ANSI Z60.2-2025 describes general ball-depth proportions of 65% of diameter below 20 inches and 60% at 20 inches and above, with adjustments for soil and regional root form. Its plant-size tables also give scheduled minimum dimensions. For a 3-inch-caliper Type 1 shade tree, the listed minimum is 32 inches in diameter and 19 inches deep; calculating 32 × 0.60 does not create a separate 19.2-inch rejection limit.
AmericanHort measures scheduled ball depth below the root flare and excludes excess soil above it. A package 22 inches deep with 4 inches of overburden contains only 18 inches of measurable depth, short of the cited 19-inch schedule. Put the ruler, exposed flare, and supplier tag in the same receiving photograph so the measurement remains tied to that plant.
What an intact root ball looks like at delivery
University of Minnesota Extension identifies a firm root ball with a stem that does not wobble inside it as a selection criterion for B&B stock. Look for relative movement between trunk and soil, split soil masses, and soil escaping from the package. A tight basket can conceal a fractured ball, so record the condition as well as the package dimensions.
Keep three acceptance observations separate: plant identity and size, soil-ball geometry, and structural condition. Passing the diameter measurement does not erase a damaged ball. Conversely, an intact ball does not establish that the specified nursery grade was delivered.
Distinctions
- Container-grown stock
- The roots developed in a container. A field-dug ball placed in a container for handling still needs its production history identified.
- Root flare
- The trunk-to-root transition supplies the upper reference for ball depth; the top of the burlap is a packaging edge.
Frequently asked questions
Does B&B mean the tree meets a nursery standard?
No. B&B describes the production and packaging method. Acceptance still needs the specified plant grade, root-ball dimensions, and condition.
Is the nursery-stock standard automatically a contract requirement?
AmericanHort's ANSI notice says the parties to a commercial transaction should expressly agree that the standard applies. Name the edition and plant schedule in the purchase specification; a B&B tag alone does not incorporate them.