Field glossary · component
Root flare
The root flare is the tree's original trunk-to-root junction; Colorado State Forest Service sets this landmark 1 to 2 inches above surrounding soil when planting. Find it beneath nursery soil and adventitious stem roots before measuring the root ball. A graft swelling can sit at the container surface while the real flare remains buried. Hole depth comes from the flare-to-ball-bottom dimension, which can be several inches less than the delivered ball height.
The point where the trunk widens into the first main roots, which must sit at the surface and stay exposed
Find the original roots beneath the nursery soil
University of New Hampshire Extension identifies the topmost woody root growing outward from the trunk, usually at least 1/4 inch in diameter, as a practical landmark for finding the flare. Trace its connection to the trunk. A mat of fine roots near the container surface does not establish the original planting depth.
Colorado State Forest Service documents a container tree whose true flare lay approximately 3 inches below the supplied soil surface. Its planting guidance distinguishes those original structural roots from adventitious roots growing higher on the buried stem. That distinction adds an identification check to the depth work in the large-tree transplanting guide.
Turn the flare location into a hole-depth measurement
Colorado State Forest Service recommends setting the flare 1 to 2 inches above surrounding ground and calculating hole depth from the flare-to-ball-bottom measurement. Lay a straightedge across undisturbed ground beside the hole to carry that grade over the opening. Measuring from loose spoil or the mulch surface changes the reference.
Carry the finished-soil elevation across the hole with a straightedge supported on undisturbed ground. Keep the tape's upper reading at the original woody root connection. A measurement to the graft union, remaining potting medium or loose spoil uses a different datum and changes the hole depth.
A graft union is a different landmark
The graft union is the joining point between rootstock and the selected upper plant. Colorado State Forest Service specifically shows a graft swelling at the container soil line while the actual flare remains buried. Follow the stem down to its structural roots instead of accepting the first bulge as the depth reference.
Inspect around the circumference. A root growing across the trunk belongs in the girdling-root assessment, even when another side has an obvious flare. For maintenance crews, a newly exposed flare also provides a fixed reference for detecting subsequent fill or mulch accumulation during plant health care visits.
Field example
A delivered ball is 20 inches tall, and the flare is buried 3 inches below its top. The usable flare-to-bottom dimension is 17 inches. Applying Colorado State Forest Service's raised-planting method with a 1-inch allowance gives a hole depth of 16 inches. A 20-inch hole would instead bury the flare 3 inches below grade, a 4-inch error from the intended setting.
Record delivered ball height, covering removed and accepted flare elevation as three separate measurements. A photograph with the straightedge and tape preserves the reference for the crew completing the planting work.
Frequently asked questions
Does exposing the root flare mean uncovering the whole root system?
No. UNH Extension distinguishes clearing the trunk junction from dismantling its supporting soil ball. Its drawing of radially spreading bare roots explains direction of growth. For a B&B tree, expose the depth landmark while keeping the ball intact enough to support the roots.
Sources checked
Also defined as
- The widening at the trunk base where it meets the roots, set at or above grade when planting
- Where the trunk widens into the first roots; must stay exposed, not buried in mulch