Field glossary · equipment
Combination starter
A combination starter brings motor switching, overload protection, and branch-circuit protective and disconnecting functions into an approved arrangement. Its suitability depends on the tested combination of devices, operating voltage, and available fault current. Matching only the motor horsepower or the contactor size leaves the assembly’s short-circuit performance unresolved.
Disconnect, short-circuit protection, contactor, and overload in one assembly, as in an MCC bucket
Two-component and three-component Type F starters
ABB’s Manual Motor Starter Guide describes a two-component Type F assembly as a manual self-protected device providing short-circuit and overload protection together with a contactor. The overload function is already in the protective device, so a separate overload relay is not what makes that arrangement a combination starter.
ABB describes a three-component Type F assembly as a magnetic-only manual motor starter, contactor, and separate overload relay. Replacing the protective device in one arrangement with a visually similar magnetic-only device can remove overload protection unless the separate relay is present and correctly applied.
SCCR and coordination type answer different questions
Schneider Electric describes Type 1 coordination as allowing a starter to need repair or replacement parts after the specified short-circuit event, while Type 2 requires suitability for further use subject to the manufacturer’s treatment of possible contact welding. Type 2 does not promise that every component remains untouched or that no post-fault inspection is needed.
The short-circuit current rating, or SCCR, states the assembly’s rated fault-current capability at specified conditions. Coordination type describes the required outcome of the fault test. Carry both into the motor protection schedule instead of reducing them to one “heavy-duty” description.
Read across the exact tested combination
Rockwell Automation’s September 4, 2025 SCCR-12681A sheet specifies a 600Y/347 V, 50/60 Hz system and a 600 V test voltage for the listed Type F, Type 2 combinations. Its SCCR rows give 30 or 50 kA, depending on the component combination. The slash-rated system designation is part of the application: the 600 V test does not establish a 600 V ungrounded-delta rating.
A submittal should identify the protective device, contactor, overload device when required, connection accessories, voltage, and applicable rating row. A replacement part that carries a larger individual rating does not automatically preserve the tested assembly. Match the combination evidence before carrying the old panel label forward.
One Rockwell row pairs a 140MT-C3E-B25 protective device, adjustable from 1.6 to 2.5 A, with the 100-C23 contactor family at 30 kA. That row supplies a usable submittal check: device catalog number, adjustment range, contactor family, voltage, and SCCR must stay together, including the completed coil and auxiliary-contact codes.
Distinctions
- Motor circuit protector
- A magnetic-only motor circuit protector supplies short-circuit protection within its approved combination. It does not replace the starter’s overload function.
- Variable-frequency drive
- A drive controls motor frequency and speed. Its protective arrangement and short-circuit rating follow its own instructions rather than the tested combination for a contactor starter.
Frequently asked questions
Does a 65 kA breaker make the whole starter 65 kA?
No. An individual breaker rating does not establish the combination’s SCCR. Use the tested or otherwise permitted assembly rating with its specified components and conditions.
Sources checked
Also defined as
- Disconnect, short-circuit device, contactor, and overload relay listed together in one enclosure