Concentric neutral

A concentric neutral is identified by the copper-wire bundle surrounding the insulation shield and its specified electrical capacity relative to the phase conductor. One-third neutral refers to the bundle's nominal conductance, not coverage of one-third of the circumference. Southwire SPEC 81180 lists seven 14 AWG neutral wires for its 2/0 AWG aluminum one-third-neutral cable. The notation '7 x 14' records wire count and gauge; it identifies neither a 7 AWG conductor nor a fault-current rating.

Bare wires wrapped helically over the insulation shield that serve as the metallic shield and the neutral on URD-style cable

Used across 2 Anvilfield field guides, most in Electrical.
Updated

Full neutral versus one-third neutral

For its solidly multigrounded underground distribution systems, RUS 7 CFR 1728.204(g)(1) specifies full-neutral cable for single-phase applications and one-third-neutral cable for three-phase applications unless otherwise specified. Fremont's August 2023 utility cable specification defines its one-third neutral by combined wire conductivity equal to one-third of the phase conductor's. The ratio describes the assembled electrical path; copper neutral area and aluminum phase area alone are not equivalent measures.

RUS 7 CFR 1728.204(g)(1) sets 16 AWG as the minimum individual concentric-neutral wire size and requires contact with the extruded insulation shield along the cable. Put the wire count and gauge beside the reel identification in the receiving record. Carry that construction into the accessory schedule used with the MV termination and splicing guide, rather than leaving the neutral description at 'copper shield'.

Read the neutral column on the cable sheet

Southwire SPEC 81180 lists seven 14 AWG neutral wires and a neutral DC resistance of 0.463 ohm per 1,000 ft at 25 °C for its 2/0 AWG, 25 kV compact-aluminum cable. Its 500 kcmil version uses twenty-five 14 AWG neutral wires and lists 0.130 ohm per 1,000 ft at the same temperature. Those are two constructions within one product family, not interchangeable descriptions of any cable carrying those phase sizes.

Read across the correct product row. The aluminum phase conductor's resistance appears in a different table from the copper neutral resistance. Entering the phase value into a neutral comparison produces a plausible-looking result for the wrong metal path. Keep the stock number and the neutral column together when transferring the specification into a test sheet.

What a neutral resistance comparison reveals

Using Southwire's 0.463 ohm per 1,000 ft value, the calculated neutral resistance of a 600 ft length is 0.463 x 600 / 1,000 = 0.278 ohm at 25 °C, before connector resistance. This is the end-to-end copper-bundle reference for that length and temperature, not a ground-electrode resistance target. Bonds to earth and other neutrals create parallel return paths, so a reading through the connected network is a different quantity.

For seven equal wires connected in parallel, losing one wire over the whole cable length raises the calculated bundle resistance by 7/6, or about 17 percent. A continuity buzzer would still indicate a path through the six remaining wires. Local corrosion and damaged connections produce other resistance patterns; record broken or necked-down wires individually instead of turning a continuity indication into a count of sound wires.

Distinctions

Copper tape shield
A tape-shield construction record gives tape dimensions and overlap; a wire-neutral record gives wire count and gauge. EWEB specification ES5-8.1100 treats these as separate ordering constructions. Specify the shield connection from the chosen accessory's instructions rather than assuming either universal hardware or a unique hardware set for every shield type.
Stress cone
Keep the bundle-resistance record separate from the stress-cone selection record: a correct copper-wire count establishes neither the accessory's insulation-diameter fit nor its voltage rating.

Frequently asked questions

Does an intact jacket prove the concentric neutral is sound?

An exterior jacket inspection does not establish the continuity or remaining cross-section of the copper beneath it. Keep the jacket observation separate from the neutral condition and the cable acceptance test record.

Is 7 x 14 a 7 AWG neutral?

No. It identifies seven individual 14 AWG wires. The assembled neutral's electrical characteristics come from the cable specification, including the wire construction and length.

Sources checked

Also defined as

  • Datacenter: A metallic shield of wires wrapped around the cable that also carries neutral and fault current and holds the cable at ground

Where this shows up

Next step: Find utility cable bids

Back to the full field glossary