Equipment grounding conductor (EGC)

An equipment grounding conductor is the conductive return path connecting equipment metal to the source bonding point. Its field condition depends on every termination and joint in that path. A generator frame can appear grounded through other metal while its intended EGC is broken. Verification must establish the specified connection and terminal assignment, then account for parallel paths that can mask a defect.

The conductor that bonds the generator frame and enclosures to the grounding system; required regardless of the SDS question

Used across 2 Anvilfield field guides, most in Electrical.
Updated

Trace the frame connection through the whole circuit

For fixed AC equipment, OSHA 1910.304(g)(8)(i) places the equipment grounding conductor with the circuit conductors: inside their raceway, cable, or cord, running alongside them, or enclosing them. The same provision permits a separate EGC route for DC circuits. A remote rod connection by itself does not provide the required AC circuit arrangement.

On the generator grounding drawing, trace the frame connection to the equipment-grounding system through the transfer equipment and feeder. A loose lug, broken flexible connection, painted contact surface, or interrupted raceway joint is a defect in a specific part of the return path. Identify the failed part rather than adding an unrelated earth connection.

What does a continuity test actually establish?

OSHA 1926.404(b)(1)(iii)(D) requires both electrical continuity and correct attachment to the grounding terminal under an assured equipment grounding conductor program. These are separate acceptance criteria. A conductor connected to the wrong terminal can be continuous and still fail the program.

A basic meter can read through structural metal or another cable even after the intended EGC opens. Establish the test boundary with the circuit de-energized and absence of voltage verified, then identify which parallel connections remain in the measurement. Record the path, instrument, resistance, and connected metal. An audible continuity indication without that boundary does not identify which conductor carried the test current.

How added joint resistance changes fault current

For a resistive 120 V fault loop with total resistance of 0.20 ohm, Ohm's law gives 600 A of prospective fault current. Adding 0.40 ohm at a damaged connection raises the loop resistance to 0.60 ohm and reduces that current to 200 A. Compare the resulting current with the breaker's actual time-current curve; continuity alone does not establish clearing time.

The Oregon electrical inspector guide lists equipment grounding conductor sizing at NEC 250.122 and electrode-conductor sizing at 250.66 as separate checks. Carry the EGC sizing record with the continuity result. Correct size cannot compensate for an open joint, and a low test reading through other metal cannot establish the intended conductor's size.

Distinctions

GEC
A grounding electrode conductor connects to the electrode system. It does not replace the equipment path that accompanies the circuit.
Neutral connection
The neutral carries normal load current. A connection that routes that current through equipment metal is not a successful EGC repair.

Frequently asked questions

Does every EGC have to be a green insulated wire?

No. Recognized metal raceways and other wiring methods can provide the equipment path. The installation must satisfy the permitted method's continuity and connection requirements.

How often are portable grounding paths tested under an AEGCP?

For the construction AEGCP, OSHA 1926.404(b)(1)(iii)(E) calls for tests before first use, after repairs, after suspected damage, and at intervals no longer than three months. Fixed cord sets and receptacles not exposed to damage have a six-month interval allowance.

Sources checked

Also defined as

  • The fault-current path, green, green-yellow, or bare (NEC 250.119)