Field glossary · method
GPR
GPR means ground-penetrating radar; its concrete depth readings are conversions of reflected-pulse travel time using a wave velocity. With velocity calibrated at 100 mm per nanosecond, a 4-nanosecond round trip represents a target 200 mm deep. A useful scan report identifies time zero, the calibration target, and the depth reached by interpretable data so the displayed geometry can be reproduced.
Ground-penetrating radar, used to locate rebar, cables, conduit, and voids before cutting
Depth comes from a round-trip travel time
GSSI's Concrete Handbook, revision H requires identifying the concrete surface as time zero before depth calibration. It calculates velocity as twice the independently known target depth divided by the two-way travel time measured from that surface. An uncorrected time-zero offset and an incorrect velocity are separate sources of depth error.
A calibration target 150 mm below the scanning face returns at 3.0 nanoseconds. Velocity is 2 x 150 / 3.0 = 100 mm per nanosecond. At the same calibrated velocity, a return at 4.0 nanoseconds represents 200 mm depth. If the operator instead assumes 120 mm per nanosecond, the displayed depth becomes 240 mm, a 40 mm overestimate.
GSSI identifies a target of independently known depth as the best depth-calibration reference. Record what supplied that depth and where the calibration was made. Changing moisture conditions or layer thicknesses can make a calibration from another part of the structure inappropriate.
How accurate is the reported concrete depth?
GSSI's revision H handbook gives calibrated depth accuracy for the concrete-radar systems it describes as 1/4 inch, about 6 mm, or 5% of depth, whichever is greater. At 200 mm depth, the 5% term is 10 mm. Report the calibration basis with the depth rather than presenting an instrument cursor's decimal places as measurement accuracy.
GSSI reports that selecting an assumed concrete type can leave depth readings off by as much as 20%. That is 40 mm at a true depth of 200 mm. Where velocity is estimated from hyperbola shape instead, GSSI requires a traverse perpendicular to the target for that calculation.
Distinguish depth uncertainty from missing coverage
ASTM D6432-19 identifies polarization, target orientation, and attenuation as factors in radar interpretation. Classify a weak or obscured lower layer as an interpretation limit, rather than attaching the calibrated depth tolerance to a target that was never resolved.
FHWA's GPR guidance identifies continuous metal as a barrier to radar penetration. On a composite floor, show the steel-deck footprint as the lower coverage boundary and identify the side from which the survey was made. The uncertainty of a visible bar's depth and absence of information below the deck need different map symbols.
What belongs on a concrete radar deliverable?
Tie the marked lines to the scanning face and a recoverable reference. Include the survey footprint, scan directions, calibration basis, detected target depths, areas of attenuation or shielding, and the intended penetration location. Keep interpreted target type separate from the reflection actually observed.
For a pre-drilling concrete survey, make the depth calculation recoverable from the calibration and travel-time record. The cut or core layout should show both detected targets and the zones where shielding or access prevented useful coverage.
Distinctions
- Covermeter
- A covermeter senses metal electromagnetically and is particularly useful for shallow reinforcement. GPR records reflected radar energy and can respond to nonmetallic interfaces.
- Radiography
- Radiography measures transmitted radiation through an object. GPR commonly works with reflected energy from one accessible face.
Previous agency awards in PorchRocket Bid Control show scanning firms which contractors won public renovation work, giving them a starting point for project teaming.
Frequently asked questions
Does a strong radar reflection identify a live conduit?
Radar amplitude describes electromagnetic contrast. It supplies no electrical isolation or voltage-test result for a conductor inside a conduit.
Can two radar scans show different depths for the same bar?
Yes. Different time-zero settings or assumed velocities change the converted depth. Compare the calibration and scanning face before concluding that the bar moved.
Sources checked
Also defined as
- Datacenter: Ground penetrating radar, which sends an electromagnetic pulse into the slab and times the reflections to map embedded targets