Concrete cover
Concrete cover measures the concrete outside the outermost reinforcement, so a scan reporting bar-center depth needs a radius correction before comparison with specified clear cover. An outside stirrup or tie can govern even when the main bar is deeper. Report the shallowest verified locations by member face and bar layer; an average conceals the places most exposed to deterioration.
The depth of sound concrete between the surface and the nearest reinforcing bar; the chloride barrier protecting the steel
Clear cover versus the depth shown on a scan
FHWA's magnetometer guidance explains that bar size, orientation, and location all affect a covermeter signal. A stronger response can indicate a larger bar or a shallower bar, so the assumed bar diameter belongs in the survey record. Congested steel and nearby metal also influence the result.
Set the survey sheet up with separate fields for raw depth, assumed or verified bar diameter, and calculated clear cover. Establish which steel surface the instrument's depth represents before calculating. A meter configured to report clear cover has already made the diameter adjustment; subtracting the radius again creates a false deficiency.
FHWA describes conventional covermeter effectiveness as limited to roughly the top 4 inches of concrete and primarily the first reinforcing layer. A deep lower mat or tightly bundled cage requires another method or direct verification at selected locations. A color plot without the measurement limits is incomplete evidence.
Does epoxy coating permit less cover?
ACI's published cover FAQ explains the 3-inch specified cover for concrete cast against and permanently in contact with ground under ACI 318-19. It states that epoxy coating does not create an automatic cover reduction. The earth-cast requirement also addresses constructability, including the irregularity of an excavated face.
ACI identifies ACI CODE-318-25 as its current structural concrete code. Record the edition adopted for the project when resolving a cover discrepancy; the public ACI FAQ above identifies the edition supporting its specific explanation.
Before placement, reinforcement inspection verifies chairs, cage position, and specified cover. After hardening, locate each reading by face and bar layer, retain instrument settings and verified reference depths, and report the low-cover locations. A member's average cover can conceal the bar with the least concrete between it and the exposure.
A center-depth reading converted to clear cover
A scan locates the center of a verified 1-inch-diameter bar 2 inches below the surface. Clear cover is 2 - 0.5 = 1.5 inches. If the drawing requires 2 inches of clear cover, the discrepancy is 0.5 inch; recording the raw 2-inch instrument depth as cover would hide it. Check the nearby outside tie separately if it lies closer to the concrete face.
Distinctions
- Bar spacing
- Spacing describes separation between bars. Cover measures separation between steel and the concrete boundary.
- Development length
- Development length is the embedded bar length used to transfer force through bond. Increasing cover does not itself supply missing embedment.
Frequently asked questions
Can a covermeter measure corrosion loss?
FHWA states that magnetometers do not detect corrosion directly. Their cover measurements help locate exposure risk and plan other tests.
Should I average low cover readings with good ones?
Keep the low readings and their locations visible. An overall average does not restore the missing concrete barrier at a particular bar.
Sources checked
Also defined as
- The clear distance from the concrete surface to the nearest bar, the corrosion, fire, and bond protection