Field glossary · property
GWP
GWP (global warming potential) converts refrigerant emissions into CO2-equivalent mass by multiplication: emitted mass × GWP = CO2e. A complete value names its time horizon and assessment basis. ASHRAE's 2026 refrigerant table assigns R-32 a 100-year GWP of 675 under IPCC AR4 and 771 under AR6, so a 1 kg release becomes either 675 or 771 kg CO2e depending on the stated accounting basis.
Global warming potential, a refrigerant's climate impact relative to carbon dioxide
Why two GWP100 numbers can both be correct
EPA defines carbon dioxide's GWP as 1 for every time horizon because carbon dioxide is the reference gas. A change from a 100-year to a 20-year horizon changes the integration period. A change from IPCC AR4 to AR6 changes the scientific assessment used to calculate the factor. These are separate choices.
The 2026 ASHRAE Handbook, Refrigeration, lists R-454B GWP100 as 466 under AR4 and 531 under AR6. Its comparison table below keeps the assessment columns separate; compare refrigerants vertically within one column. These are warming factors per emitted mass, not equipment efficiency ratings.
EPA's GWP explanation distinguishes its use of AR6 for scientific communication, AR5 for the national greenhouse-gas inventory and generally AR4 for Greenhouse Gas Reporting Program thresholds. The newest scientific factor therefore does not automatically replace the factor prescribed by a particular reporting program.
| Refrigerant | GWP100, IPCC AR4 | GWP100, IPCC AR6 |
|---|---|---|
| R-32 | 675 | 771 |
| R-454B | 466 | 531 |
| R-410A | 2,088 | 2,256 |
Convert a measured refrigerant loss to CO2 equivalent
Multiply emitted refrigerant mass by the chosen GWP: CO2-equivalent mass = refrigerant emitted × GWP. A measured 10 kg loss of R-410A using the AR4 factor of 2,088 represents 20,880 kg CO2e, or 20.88 metric tonnes. The same 10 kg emission of R-454B at 466 represents 4.66 metric tonnes CO2e. The reduction is approximately 77.7% for those equal emitted masses.
An installed charge is inventory. Emissions accounting needs the quantity actually released, supported by service records or a refrigerant mass balance. Preserve charge, additions, recovery and confirmed losses as separate fields. The 77.7% result compares equal releases only; replacement sizing and the new equipment's charge are separate decisions in the refrigerant transition guide.
Which blend factor belongs in a regulatory comparison?
For EPA's Technology Transitions restrictions, 40 CFR 84.64 calculates a blend's GWP from prescribed constituent factors multiplied by nominal mass fractions. The rule uses AIM Act exchange values for regulated HFCs and specified values for other listed constituents. A scientific table from a newer IPCC assessment does not change those regulatory inputs.
Section 84.64 also excludes a constituent and its mass fraction when the rule assigns it no GWP. State that calculation basis when documenting a regulatory limit. For emissions reporting under another program, use that program's factors; for a laboratory-identified mixture, retain the composition result alongside the selected factors. A cylinder labeled mixed refrigerant is not enough information to assign a blend-specific GWP.
Keep warming potential separate from equipment ratings
ASHRAE places safety classification and GWP in separate columns: its table assigns R-32 to A2L and R-410A to A1 even though both receive numerical warming factors. A GWP comparison therefore cannot establish the refrigerant's flammability group or the equipment's COP. Those selections need their own ratings.
On a chiller selection, keep ozone-depletion potential, refrigerant GWP and equipment efficiency in separate schedule fields. To compare whole-system climate impact, combine the direct refrigerant-emission calculation with the emissions associated with the machine's operating energy.
Distinctions
- Atmospheric lifetime
- GWP100 integrates warming influence over 100 years. It does not state that the refrigerant remains in the atmosphere for exactly 100 years.
Frequently asked questions
Does CO2 equivalent mean the system released carbon dioxide?
CO2e expresses the warming impact on a common mass basis. The emitted substance remains the refrigerant identified in the loss record; the calculation does not change its chemical identity.
Sources checked
- EPA: Understanding Global Warming Potentials, assessment bases and reporting uses
- ASHRAE Handbook 2026, Refrigeration, Chapter 1: refrigerant safety groups and AR4, AR5 and AR6 GWP100 values
- 40 CFR 84.64, July 1, 2025 annual edition: nominal mass-fraction calculation for blend GWP
- 40 CFR 84.64: prescribed blend factors and omitted constituents; current eCFR reviewed November 5, 2026
Also defined as
- Datacenter: Global warming potential; high for HFC-227ea (around 3,200), near 1 for FK-5-1-12, effectively zero for inert gases