Field glossary · process
Nitrogen purge
A nitrogen purge for refrigerant brazing has two stages: displace the air, then maintain a small through-flow while the joint is heated and cools. Uniweld's NV1 marks those stages at 20+ SCFH and 3 to 5 SCFH respectively. Its 60 psi upstream regulator setting is not the pressure to trap inside the tube. An open discharge path and a moving float establish flow through the selected piping path.
A low flow of dry nitrogen through the tube during brazing to displace oxygen and prevent internal oxide scale
Separate initial displacement from brazing flow
Uniweld marks the NitroVue NV1 initial purge at 20+ SCFH and its brazing band at 3 to 5 SCFH. These are different operating stages: the first displaces the original gas, and the second maintains a low flow during heating. Continuing at the initial displacement rate consumes more nitrogen and changes the heating conditions at the joint.
Harris suggests 2 to 3 CFH as a starting brazing flow and warns that excessive flow cools the tube and that accumulated pressure impedes filler penetration. Its low-flow recommendation and the NV1 scale belong to their respective setups. Keep the maker's device instructions with the regulator and flowmeter rather than treating every marked pressure as interchangeable.
Why a 60 psi regulator setting is not pipe pressure
Uniweld specifies a 60 psi regulator delivery setting upstream of the NV1 flow indicator. The device then meters nitrogen to the open piping path at its selected flow. That upstream setting is not an instruction to braze a line sealed at 60 psi. The regulator gauge, flow-control valve and open outlet perform different functions.
Uniweld states that an NV1 float that does not rise indicates no nitrogen flow, even if static pressure is present. Verify actual discharge from the intended outlet. Branches need a defined path through the section being heated; a flow indication upstream does not establish that every connected branch is being swept. Identify the inlet, outlet and heated branch on the brazing work record, especially when a tee offers the gas an easier route around the joint.
Budget consumption in standard cubic feet
At a maintained 4 SCFH for 45 minutes, the brazing stage consumes 3 standard cubic feet. Add the gas used for initial displacement separately. SCFH is referenced to standard gas conditions; it is not the compressed volume inside the cylinder and it is not a flow in cubic feet per minute.
Harris recommends starting nitrogen before heating, maintaining it during cooling, and sectioning bench-brazed assemblies to inspect the bore. A clean sectioned coupon verifies the result inside that coupon. Keep it associated with the setup, flow and joint orientation that produced it. The subsequent standing pressure test proves a different property: tightness under the specified test conditions.
Distinctions
- Pressure test
- Pressure testing uses an isolated system at a defined pressure. Brazing purge uses a flowing gas path with an outlet.
- Factory nitrogen blanket
- Harris explains that nitrogen-filled, capped copper loses its internal protection when opened for installation. A factory blanket does not establish ongoing flow through a field-brazed joint.
Frequently asked questions
Why does my nitrogen gauge show pressure but the float stays down?
A pressurized dead end has no through-flow. Establish the intended outlet path and verify that the device is operating within its instructions.
Are CFH and SCFH the same number?
SCFH explicitly states standard reference conditions. Use the flowmeter's calibration basis when recording or comparing readings.