ANVILFIELD Try FieldOS

Field glossary · business

Prevailing wage

Prevailing wage sets the minimum qualifying compensation for covered construction work. On a federal Davis-Bacon determination, a 36-dollar basic rate plus 12-dollar fringe requires 48 dollars per covered straight-time hour, with cash replacing any fringe amount not met by qualifying employer benefits. That 48-dollar package excludes separate estimating burdens such as workers' compensation. Calculate the benefit credit and overtime base separately so employer cost does not get mistaken for wages paid.

The locally determined base hourly rate plus fringe required for each worker classification on covered public construction

Used across 2 Anvilfield field guides, most in Electrical.
Updated

Turn the wage determination into a cash-pay requirement

29 CFR 5.31 permits a contractor to meet the required wage-and-fringe package through cash and qualifying benefits in combination. For a 36-dollar basic rate and 12-dollar fringe, a 4-dollar credit toward the fringe leaves 8 dollars of cash fringe and 44 dollars of direct cash pay per straight-time hour. The 4-dollar contribution brings qualifying compensation to 48 dollars.

The determination must match the job's classification and locality. Use its basic and fringe figures as inputs, then reconcile the employer's actual benefit credit against them. The health-plan calculation below explains how a premium payment becomes that hourly credit rather than treating the full premium as a charge to one public job.

Annualize the health contribution before taking credit

Under 29 CFR 5.25(c), annualization generally divides qualifying fringe-benefit cost by the worker's total hours on both Davis-Bacon and private work during the period that cost covers. A contribution that differs by employee requires an employee-specific calculation. A qualifying annualization exception changes that treatment; merely assigning a cost to a public job does not.

An employer contributes 7,800 dollars for a worker's annual health coverage. The worker logs 1,950 hours, including 650 on Davis-Bacon work and 1,300 on private jobs. The annualized credit is 7,800 / 1,950 = 4 dollars per hour. Dividing by only the 650 public-work hours would claim 12 dollars per hour, three times the actual credit.

Separate payroll burden from bona fide fringe benefits

29 CFR 5.29(f) excludes benefits required by other law from Davis-Bacon fringe credit, including workers' compensation and unemployment compensation. Employer Social Security contributions are also outside the creditable fringe package. These remain real estimating costs even though they do not discharge the wage determination's benefit obligation.

Put employer burden beside, rather than inside, the wage-credit calculation. An estimate can cover its full payroll cost and still underpay the required compensation if it treats mandatory insurance as a fringe benefit. Use the resulting cash and benefit totals in the certified-payroll record.

Does cash fringe get time-and-a-half?

29 CFR 5.32(c)(1) permits the cash equivalent of the required Davis-Bacon fringe to be excluded from the basic or regular rate used under the concurrent federal overtime laws identified in that section. Cash paid as ordinary wages is treated differently. Labeling an existing wage payment as fringe does not turn it into an exclusion.

An employee has a 36-dollar basic rate that also governs federal overtime, plus a required 12-dollar fringe paid in cash. One overtime hour totals 36 x 1.5 + 12 = 66 dollars. Multiplying the entire 48-dollar package by 1.5 produces 72 dollars because it also applies the multiplier to the excluded fringe equivalent.

29 CFR 5.32 also prevents an overtime-rate calculation from falling below the wage determination's basic hourly rate. Preserve the established cash wage and the fringe treatment in the payroll setup, alongside the hours by classification.

Distinctions

Fringe credit versus deduction
An employer-funded benefit credit measures compensation supplied. An employee deduction comes from the worker's earnings and does not become an additional employer contribution.

Frequently asked questions

Is the annual health premium credited only to public jobs?

Annualization includes private-work hours in the denominator. The public job receives the resulting hourly credit for the employee's hours on that job, rather than funding the entire annual premium.

Sources checked

Also defined as

  • Datacenter: A government-set minimum wage and fringe by classification and locality for covered public or publicly funded work

Where this shows up

Related guides

Next step: Track public electrical work

Back to the full field glossary