Certified payroll
Certified payroll is a project-specific wage report accompanied by a signed statement that the reported payments and labor classifications meet the applicable contract requirements. On federal Davis-Bacon work, it is more than a copy of the payroll register. The submitted report, the signer’s certification, and the employer’s retained records serve different purposes and contain different levels of worker information.
The weekly report proving each worker was paid the required wage and fringe, with a signed Statement of Compliance
Separate the submitted report from private payroll records
DOL’s 29 CFR 5.5(a)(3) requires weekly certified payroll submissions to omit workers’ full Social Security numbers, home addresses, telephone numbers, and email addresses. The employer retains that information in the underlying records instead. A unique worker identifier, such as the last four Social Security digits, connects the submission to the private record.
Export the certified report from a controlled project view. Sending the entire payroll database exposes information that the weekly submission does not require and can mix unrelated projects into the work classification and hours columns. Keep the complete source records available for authorized review.
WH-347 separates project earnings from all-work earnings
DOL’s current WH-347 instructions distinguish column 7A, gross earnings on the reported federal project, from column 7B, gross earnings for all work during the week. For a worker earning $1,200 on that project and $400 elsewhere, those amounts are $1,200 and $1,600 respectively. The project’s daily hours must still reconcile to the project earnings.
The same instructions place deductions for all work against the all-work earnings. A payroll export that puts $1,600 into the project-only column overstates the project wages even if the worker’s paycheck total is correct. Preserve the job allocation that explains the difference. With $300 in total deductions in that week, column 9 shows $1,300 net pay from the $1,600 all-work gross. Subtracting those same deductions from the $1,200 project-only gross would misstate the paycheck as $900.
A pasted signature image is not the certification process
DOL’s WH-347 instructions accept legally valid electronic signatures that indicate acceptance and verify the signer’s identity; photocopied or scanned signatures do not satisfy that requirement. The certifying official must be the contractor, subcontractor, or agent who paid or supervised payment for the reported period.
Link the signed version to the exact report reviewed by that official. Replacing hours after signature should create a corrected report with a corresponding certification, rather than silently changing the attachment. The certified-payroll guide covers the wider weekly workflow.
Start the retention clock at prime-contract completion
DOL’s 29 CFR 5.5 requires the specified payroll records to be retained for at least three years after all work on the prime contract is completed. A subcontractor’s last payroll week can occur much earlier. Track the prime-contract completion date in the retention record instead of calculating deletion from the last individual timesheet.
Distinctions
- Payroll register
- A payroll register supports wage payment across the business. A certified project report selects the required project data and adds a responsible official’s compliance statement.
Frequently asked questions
Must every contractor use the WH-347 layout?
DOL makes WH-347 optional, but the required weekly information and signed statement remain mandatory for covered work. The current DOL form page lists OMB approval through January 31, 2028.
Sources checked
Also defined as
- Datacenter: The weekly report, often Form WH-347, certifying each worker was paid at least the prevailing wage and fringe
- The weekly prevailing-wage report certifying each worker was paid the required wage and fringe by classification