Utilization

Utilization is 38% when a facility carries 380 kW against 1,000 kW of usable capacity: divide demand by that capacity and multiply by 100. The same arithmetic measures a crew's billable share of paid hours, but GPU utilization instead counts active time within a sampling window. Keep the resource, numerator, denominator and observation interval with every percentage. Changing the denominator can change reported utilization even when the measured load stays fixed.

Used capacity as a share of usable capacity, after the continuous derate and the redundancy reserve

Used across 4 Anvilfield field guides, most in Datacenter.
Updated

Weight room percentages by their actual capacities

A 200 kW room at 90% utilization carries 180 kW. An 800 kW room at 25% carries 200 kW. Together they use 380 kW out of 1,000 kW, giving 38% aggregate utilization. Averaging the two displayed percentages produces 57.5%, which assigns the small room as much weight as the large one.

Aggregate the numerators and denominators first, then divide. Use the same observation interval and capacity basis for both rooms. If one denominator is installed rating and the other is usable output after reserve, the combined percentage has no consistent meaning. The capacity-utilization guide establishes the facility boundary before this aggregation.

GPU utilization counts active time, not completed work

NVIDIA defines nvidia-smi GPU utilization as the share of a sampling interval during which at least one kernel executes. NVIDIA states that this sampling interval ranges from one-sixth of a second to one second, depending on the product. A displayed 100% therefore establishes continuous kernel activity within that interval; it does not establish that every compute resource delivered its maximum throughput.

NVIDIA separately defines memory utilization as the share of the interval during which device memory is read or written. That metric describes transfer activity, rather than the fraction of memory capacity occupied. Keep GPU activity, memory activity, allocated memory and electrical demand as different measurements when correlating compute performance with facility loading.

An interval average does not preserve the peak

A load drawing 100 kW for five minutes and 900 kW for the next five minutes averages 500 kW over ten minutes. Against 1,000 kW usable capacity, average utilization is 50%, while the observed high interval reaches 90%. The arithmetic retains energy over the full window but loses the load shape unless the shorter observations are also kept.

DOE's 2024 Best Practices Guide for Energy-Efficient Data Center Design defines PUE using annual facility and IT energy and distinguishes infrastructure efficiency from overall data-center efficiency. PUE and utilization therefore belong in separate report fields. A low infrastructure-energy ratio does not establish either spare electrical capacity or high compute output. The TCO guide uses the capacity basis alongside the operating-cost assumptions.

Distinctions

Billable labor utilization
A crew paid for 40 hours and billing 30 hours records 75% billable utilization when paid hours are the denominator. Five hours of travel and five of training account for the balance in this example. A dashboard excluding those hours would answer a different staffing question, so show the included time categories.

Frequently asked questions

Should a utilization dashboard show only one percentage?

Show the numerator, denominator and interval beside the percentage, and retain the relevant peak or short-window trend. This makes a changed capacity assumption distinguishable from a changed load. A room can become more utilized because its usable capacity fell even when demand stayed constant.

Sources checked

Also defined as

  • Electrical: Billable hours divided by paid hours, the share of labor you pay for that you actually bill
  • Concrete: The share of available time a machine actually works, the main lever on the hourly rate