Field glossary · property
SHGC
SHGC means solar heat gain coefficient: admitted solar heat divided by incident solar energy under stated rating conditions. The calculation includes directly transmitted sunlight and absorbed energy released inward. An SHGC of 0.25 represents 25 percent solar admission. NFRC's whole-window rating includes the frame, so use it with the complete window area; a glass-only value describes a different area and assembly.
Solar heat gain coefficient, the fraction of solar energy a window admits
Match the SHGC rating to the area being measured
The U.S. Department of Energy's Measure Guideline: Energy-Efficient Window Performance and Selection explains that NFRC SHGC covers the whole window, including the frame. A glass-only value excludes that frame contribution. Record the product model, certified rating, and complete-unit dimensions together before entering window areas in a load calculation.
A film data sheet also needs an identified rating basis: center-of-glass or total product, and the glazing configuration used for that result. Keep those fields in separate columns on the submittal comparison. The window-film guide covers film selection; the area basis determines which performance number belongs in the calculation.
Normal incidence is a rating condition
ANSI/NFRC 200-2026[E0A0] is the published procedure for rating SHGC and visible transmittance at normal incidence, where the solar beam is perpendicular to the glazing. Normal incidence describes the beam direction, not a requirement to install a window facing the sun.
Record orientation and exterior shading as separate model inputs while retaining the certified SHGC as the product input. Changing the decimal to account for an overhang and then entering the overhang again counts the same shading twice. The heating and cooling load guide explains the room-load calculation.
Use residential certification limits in the right category
ENERGY STAR Version 7.0, effective October 23, 2023, limits residential window SHGC to 0.23 in the Southern and South-Central zones and 0.40 in the North-Central zone. These are certification limits for residential windows; U-factor and air leakage also have qualification criteria. They do not set the project's commercial glazing code limit.
For the Northern zone's prescriptive window path, ENERGY STAR Version 7.0 pairs SHGC of at least 0.17 with U-factor no greater than 0.22 Btu/h·ft²·°F. Its alternative equivalent-energy paths accept other U-factor and SHGC combinations. Record the qualifying path when comparing Northern-zone products rather than sorting them solely by the lowest SHGC.
Skylights have their own category: ENERGY STAR Version 7.0 sets a maximum SHGC of 0.25 in the North-Central, South-Central, and Southern zones. Carrying a window threshold into a skylight schedule mixes two certification categories.
Distinctions
- Solar transmittance
- Counts solar energy passing directly through the glazing. SHGC also includes the inward-flowing part of solar energy absorbed by the glazing.
- U-factor
- Measures heat transfer driven by an indoor-outdoor temperature difference and has units. SHGC describes admission of incident solar energy and is dimensionless.
- Visible transmittance (VT)
- Describes the visible portion of light admitted. SHGC also accounts for solar energy outside the visible band and absorbed energy flowing inward; a VT reading cannot establish SHGC.
Field example
At normal incidence, window assemblies totaling 12 square metres receive 600 W/m², or 7,200 W of incident solar power. Whole-window SHGC 0.40 admits 2,880 W; SHGC 0.25 admits 1,800 W under the same comparison conditions. The reduction is 1,080 W, or 37.5 percent of the original solar gain. Using only the exposed glass area with those whole-window ratings would mix area bases.
Frequently asked questions
Can a light meter measure SHGC on an installed window?
A light meter measures visible illumination, while SHGC includes other solar wavelengths and heat released inward after absorption. Obtain SHGC from the product rating or the rated film-and-glazing combination; a before-and-after light reading measures a different property.
Does SHGC include air leaking around the window?
Air leakage is a separate performance characteristic and load input. SHGC accounts for solar energy admitted through the product, including the inward heat from solar absorption.
Sources checked
- U.S. Department of Energy: Measure Guideline, Energy-Efficient Window Performance and Selection, November 2012, sections 2.2 and 2.3
- ANSI/NFRC 200-2026[E0A0]: published SHGC and visible-transmittance rating procedure, sections 2, 4 and 5.7
- ENERGY STAR: Residential Windows, Doors, and Skylights Version 7.0, effective October 23, 2023
- ENERGY STAR: current residential windows, doors and skylights specification status
Also defined as
- Concrete: Solar Heat Gain Coefficient, 0 to 1, the fraction of solar heat that gets through; lower rejects more heat