Swing radius

For a machine's rear swing, measure swing radius from the rotation axis to the outermost counterweight or housing in its working configuration. A 9 ft tail radius beside a wall 10 ft from that axis leaves a 1 ft crush gap. The controlled hazard area also depends on worker access and height. OSHA 1926.1424 requires control of accessible crane swing hazards; track width alone does not locate that boundary.

The arc the crane's counterweight and rear sweep as it rotates, a struck-by and crushing zone

Used across 2 Anvilfield field guides, most in Electrical.
Updated

Locate the rotation center before setting the boundary

Use the configured machine's tail-swing dimension and rotation center from its dimensional drawing. Locate nearby walls, stored materials, and access platforms from that same center. A dimension taken from the rear of the tracks has a different origin and cannot be substituted for the radius.

Draw the rear sweep separately from the boom, bucket, and suspended-load travel. A counterweight change or a relocated material stack changes the exposure even when the machine stays parked in the same place. Include those changes in the next work-area briefing.

Why a truck bed changes the hazard area

OSHA's crane inspection directive CPL 02-01-057 uses a rear superstructure 12 ft above grade to explain foreseeable swing exposure. With no elevated standing surface, a worker at grade is below its sweep; adding a truck bed inside that area creates a foreseeable exposure for someone standing on the bed.

That example makes the layout a three-dimensional problem. A delivery truck placed beside a crane changes more than traffic flow. Its bed becomes a working elevation, and its body can become the fixed object against which the counterweight pins someone. Update the jobsite logistics plan when those surrounding objects move.

OSHA 1926.1424(a)(2) requires both hazard-recognition training and a maintained boundary for accessible swing hazard areas. The exception for signs and high-visibility equipment markings applies when barriers are infeasible on both the ground and the equipment, with the specified training; a sign is not an automatic substitute for a feasible boundary.

The operator needs a positive all-clear

OSHA 1926.1424(a)(3) requires notification before an employee enters a swing hazard location outside the operator's view. Once the operator knows someone entered, rotation must wait for the prearranged communication confirming that person is in a safe position.

Identify who supplies that confirmation and what message releases the hold. Silence on the radio does not identify a worker's location. The crane and signaling guide covers the wider lift operation; this communication specifically controls access behind the rotating structure.

OSHA 1926.1424(b) assigns coordination to the controlling entity when any part of one crane or derrick lies within another's working radius. Without a controlling entity, the operating employer or employers must institute that system. Separate operators still need coordinated movements where machine envelopes overlap.

Excavators need effective swing protection too

OSHA's January 16, 2003 interpretation on excavators requires effective protection against recognized swing-radius hazards, while explaining that the protection need not always take the form of a barricade. Employee instruction and measures that prevent entry remain the substance of the control.

For a site layout with a 9 ft tail sweep and a wall 10 ft from the rotation center, only 1 ft remains between the swept envelope and the wall at closest approach. That calculation identifies a crush gap, not a pedestrian route. Route access around the hazardous space and account separately for the excavator's boom and bucket movement.

Distinctions

Load radius
The horizontal distance from the rotation axis to the load line is used in lifting capacity calculations. It does not describe the rear housing's sweep.
Fall zone
The area a suspended load could fall into has its own exposure. Keeping the counterweight clear does not clear the load's path.

Frequently asked questions

Is the track width a reliable swing boundary?

Use the configured machine's swept envelope. The counterweight, attachments, and operating position determine whether parts extend beyond the carrier.

Do parked trucks inside the zone matter when no lift is moving?

They change the next movement's access and pinch points. Re-establish the controlled area before rotation resumes.

Sources checked

Also defined as