ANVILFIELD Try FieldOS

Field glossary · measurement

VPR

A voltage protection rating (VPR) compares a surge protective device's limiting performance for one conductor pair and tested configuration. Mersen lists 800 V line-to-ground VPR for its STZ240S enclosure-code 1 or X version without an integral switch and 900 V with that switch. Both retain 800 V line-to-neutral VPR. Specify the protection mode and complete catalog configuration before comparing numbers; the rating is a test category, not an absolute ceiling during every installed surge.

Voltage protection rating, the let-through voltage during a standard surge; lower clamps tighter

Used across 2 Anvilfield field guides, most in Electrical.
Updated

The published number is a rating category

Mersen's explanation of UL 1449 testing describes VPR as the average measured limiting voltage rounded up to the applicable rating, using a combination wave with 6 kV open-circuit voltage and 3 kA short-circuit current. Those two test-source values describe the generator; they do not mean that the installed load experiences 6 kV while 3 kA flows through it.

Rounding also limits what a comparison establishes. Two products carrying an 800 V VPR have the same assigned category for that mode, but their unrounded test averages need not be identical. A one-category difference is useful specification information; a shared category does not rank the products within it.

An integral switch can move the VPR

Mersen's 2025 STZ voltage table rates the STZ240S enclosure-code 1 or X configuration at 800 V line-to-ground without the integral switch and 900 V with that switch. The same row retains an 800 V line-to-neutral rating in both configurations. Reading only the line-to-neutral column would miss the changed line-to-ground performance.

Mersen lists a second example for STZ480Y enclosure codes 1 and X: line-to-ground VPR increases from 1200 V without the integral switch to 1500 V with it. These values belong to those catalog configurations. They are not a fixed penalty to add to every separately installed disconnect.

A submittal calling for a maximum 800 V line-to-ground VPR on a 240/120 V split-phase system could accept the cited unswitched STZ240S rating on that criterion. Substituting its integral-switch version introduces a 900 V value and misses the stated criterion. Resolve the complete configuration before approving the substitution.

Tie the comparison to the submitted configuration

UL Standards & Engagement's active UL 1449 record identifies edition 5, published January 8, 2021, with an October 21, 2025 revision. Match the submitted listing and current manufacturer table to the complete catalog number, electrical system, protection mode, and options.

The SPD installation guide addresses the external connection arrangement. Keep that installation review separate from the product-table comparison: the manufacturer's VPR does not calculate the transient voltage at every downstream load terminal.

Distinctions

MCOV
Mersen's STZ240S has a 150 V line-to-ground MCOV for continuous RMS exposure, alongside an 800 V line-to-ground VPR for its cited unswitched configuration. Those two voltages describe different operating conditions.
Nominal discharge current
A discharge-current rating describes a different test characteristic; the 3 kA VPR test-source current is not the product's advertised surge-current capacity.

Frequently asked questions

Can I use the lowest VPR anywhere on the datasheet?

Use the rating for the conductor pair exposed at the protected circuit. A neutral-to-ground value cannot replace a line-to-line requirement.

Does an 800 V VPR guarantee an 800 V maximum during every surge?

The category describes the standardized test. A different incoming waveform, current, and connection path produces a different event at the equipment.

Sources checked

Also defined as

  • Datacenter: Voltage protection rating, the SPD let-through voltage under the UL 1449 6 kV, 3 kA combination wave, rounded to a standard value
  • Datacenter: Voltage protection rating, the let-through under the UL 1449 combination wave; lower is better

Where this shows up

Next step: Find electrical upgrade bids

Back to the full field glossary