Generator manufacturers and dealers: the commercial standby installed base

Size the commercial standby fleet, verify generator locations, and turn equipment counts into dealer coverage, service capacity and replacement planning.

Market IntelligenceStandby GeneratorsGenerator ManufacturersDealer CoverageInstalled Base

Direct answer

The commercial standby installed base is the permanent generator fleet supporting commercial buildings, organized by plant site, individual set and purchasing account. Anvilfield estimates 658,000 stationary standby sets associated with the 2018 US commercial-building reference stock. Manufacturers use that population to plan dealer coverage and replacement exposure; dealers verify equipment, access and buying responsibility before turning a site into service work.

On this pageWhat belongs in the commercial standby installed base?How large is the commercial standby opportunity?Which commercial sites should a dealer prioritize?How do you turn visible equipment into a verified record?How should manufacturers assign dealer coverage?Which benchmarks keep a generator territory usable?Worked example: Anvilfield estimate for a regional standby dealer with four territory repsHow does the installed base become a service program?When does an installed set become a replacement opportunity?How do leaders keep dealer coverage current?Common mistakesDealer territory release checklistMethodology

Key takeaways

  • Anvilfield estimates 560,000 standby-engine buildings in the 2018 US commercial reference stock.
  • Anvilfield estimates a range of 419,000 to 1,042,000 sets, with a central 658,000.
  • Keep buildings, plant sites, generator sets and purchasing accounts linked and separately counted.
  • Verify the equipment and service scope before assigning a dealer or forecasting a purchase.

What belongs in the commercial standby installed base?

The commercial standby installed base is the permanent generator fleet supporting commercial buildings, organized by plant site, individual set and purchasing account. Anvilfield estimates 658,000 stationary standby sets associated with the 2018 US commercial-building reference stock. Manufacturers use that population to plan dealer coverage and replacement exposure; dealers verify equipment, access and buying responsibility before turning a site into service work.

Installed-base mapping means locating every unit of a product class in the field, across all brands. For generators, the counted assembly is the engine and alternator package. Its transfer switches, fuel tanks, controls and distribution equipment belong in linked component records. A manufacturer logo on an engine does not automatically identify the supplier of the complete generating set.

Maintain a building register, a plant-site register and a generator register. A campus plant serves several buildings; a plant also carries several sets. Preserve both relationships. The sales account sits above those physical records because a property group can purchase for several addresses through a central office.

The useful commercial question is which installed equipment fits the channel's next action. New-equipment sales, controller upgrades, fuel-system work and recurring maintenance need different qualification fields. Keep the full population available, then create a view for each decision. This prevents a narrow dealer book from becoming the manufacturer's definition of the entire market.

Installed-base mapping for equipment manufacturersInstalled-base mapping for equipment manufacturers
Standby generator and ATS installationStandby generator and ATS installation

How large is the commercial standby opportunity?

Anvilfield research estimates that 560,000 US commercial buildings had reciprocating engines used primarily for emergency backup or testing in 2018, representing 9.5% of commercial buildings.

Anvilfield estimates 393,000 standby-engine buildings at or below 25,000 square feet and 167,000 above that size. The size measure is whole-building floor area.

Anvilfield estimates 112,000 standby-engine office buildings, 46,000 healthcare buildings, 46,000 education buildings and 51,000 nonrefrigerated warehouses in the reference stock. Healthcare includes outpatient, inpatient and nursing activities. Campus buildings retain separate building identities.

Anvilfield estimates 506,000 stationary standby plant sites and 658,000 stationary standby sets associated with that stock. The set-count range is 419,000 to 1,042,000. A plant serving several buildings remains a shared site, while each generating set retains its own equipment record.

Anvilfield estimates annual replacement exposure of 38,000 sets and a density of 111 stationary standby sets per 1,000 commercial buildings with the national reference mix. Use these quantities to size dealer research and coverage; advance specific accounts through equipment verification and an owner-confirmed scope.

The table separates buildings, plant sites, sets and annual replacements. Its low and high values preserve the range for each quantity. Local equipment records establish the addresses and assemblies that belong in a dealer territory.

Anvilfield estimateLowCentralHigh
US standby-engine buildings, 2018470,000560,000651,000
Standby-engine share of commercial buildings, 20188.0%9.5%10.9%
Standby-engine buildings at or below 25,000 sq ft, 2018307,000393,000480,000
Standby-engine buildings above 25,000 sq ft, 2018147,000167,000188,000
Office standby-engine buildings, 201883,000112,000142,000
Healthcare standby-engine buildings, 201833,00046,00059,000
Education standby-engine buildings, 201820,00046,00072,000
Nonrefrigerated warehouse standby-engine buildings, 201826,00051,00075,000
Stationary standby plant sites, reference-stock model381,000506,000651,000
Stationary standby sets, reference-stock model419,000658,0001,042,000
Annual replacement sets, stable reference-stock model21,00038,00069,000
Stationary standby sets per 1,000 commercial buildings72111174

How to cite this estimate: Anvilfield, Generator manufacturers and dealers: the commercial standby installed base, 2026, https://anvilfield.com/field-guides/market-intelligence/generator-manufacturers-and-dealers-the-commercial-standby-installed-base/.

Which commercial sites should a dealer prioritize?

Building-first prospecting starts with the building and its visible assets, then finds the decision maker. Fit-first lists contain only buildings that match the work a company supplies or services. For a generator dealer, define that fit through fuel, supported equipment, access, travel, service capability and the owner's operating needs.

For manufacturer and dealer territory selection, PorchRocket's Ground Control filters commercial buildings by business type, size, rooftop HVAC and other site features. Use that building frame to organize the generator investigation and assign each candidate an evidence status.

Group healthcare and other continuity-sensitive accounts by their documented operating requirements. Group warehouses and offices by the loads actually supported and the person responsible for them. Treat a large building as a research priority when its operating profile fits the channel, then confirm the equipment instead of assigning a generator count from floor area.

Separate routine service coverage from outage response. A site near the shop still needs compatible access hours, appropriate parts, trained technicians and a realistic response arrangement. Give accounts beyond the routine route a specific delivery plan before promising coverage. The existing generator territory guide explains how to record travel, access and account responsibility.

Keep current customers and new prospects in the same physical frame. The manufacturer can then see where its authorized channel is active, where another provider is established and where purchasing responsibility remains unresolved. A blank customer field is a research task, not evidence that the equipment has no maintenance provider.

Building-first prospectingBuilding-first prospecting
Fit-first listsFit-first lists
Generator service territory account mapGenerator service territory account map

How do you turn visible equipment into a verified record?

Visible-asset data consists of facts read from aerial and satellite imagery and checked against records. For standby power, a reviewed exterior enclosure is a location clue. Attach the image date, equipment position and review result to the site before researching the make, capacity and operating role.

A generator-focused investigation through PorchRocket's Asset Search returns reviewed visible-asset findings with the owner of record on each find. Use that evidence to locate the equipment and open the ownership research, then verify the installed assembly through an owner inventory, equipment schedule or authorized site survey.

Retain screened and indoor installations in a separate records-research queue. A roofline or equipment screen hides assets from an overhead view. A rectangular cabinet also needs classification before it enters the confirmed generator total. Record an unresolved observation explicitly instead of forcing it into an equipment category.

The verification packet should identify the generator manufacturer, engine, alternator, controller, serial number, fuel, electrical rating and service access. Tie every nameplate photograph to the actual assembly. Preserve a replacement history when the set changes so an old permit does not keep an outgoing machine in the active inventory.

Capture the automatic transfer switch, or ATS, and the associated fuel system separately. Obtain the one-line diagram and switching responsibility where these affect the proposed work. The ATS commissioning and generator grounding guides explain the technical evidence that a qualified reviewer needs; the market file records whether that evidence is available.

Visible-asset dataVisible-asset data
Automatic transfer switch commissioningAutomatic transfer switch commissioning
Generator grounding and bondingGenerator grounding and bonding

How should manufacturers assign dealer coverage?

Targeted market intelligence sizes and locates demand at the building level rather than the ZIP level. A manufacturer applies it by comparing verified equipment locations with the dealers able to support those installations. Territory boundaries then reflect the installed population and actual service capacity.

Separate sales authorization, technical capability and available workload. A dealer authorized for new installations still needs the right diagnostics and technician coverage for the existing fleet. Record which generator families, controls and applications the dealer supports. Keep unfamiliar equipment visible while assigning the appropriate specialist or follow-up task.

Resolve the property owner, equipment operator and purchasing authority independently. An owner of record is a starting identity. The facilities team explains operating constraints. A procurement group controls bid timing or contract renewal. Link those roles to the site without overwriting a known operating contact when property ownership changes.

Measure coverage against the equipment population. Track verified sites with an assigned capable dealer, sites awaiting technical review and sites beyond agreed coverage. Review unresolved records alongside active accounts so a strong sales quarter does not conceal a growing service gap.

Give each assigned site a concrete next action: obtain the equipment schedule, confirm the renewal window, review a controller upgrade or arrange an authorized survey. Dealers should return those outcomes to the manufacturer register. A file that stops at contact delivery loses the evidence needed for the next planning cycle.

Targeted market intelligenceTargeted market intelligence
Owner, operator and decision makerOwner, operator and decision maker

Which benchmarks keep a generator territory usable?

Use 1 permanent asset identifier per physical generator set. Keep 2 dates on each reviewed observation: the source date and the review date. These rules prevent duplicate sets and distinguish recently reviewed evidence from recently captured evidence.

At the central planning density, 100 verified plant sites represent 130 sets. A stable fleet with a 17.5-year planning life turns over at 5.7% annually. Carry both site and set counts into the workload sheet.

A random screen of 30 independent sites has a 95.8% chance of finding an error when 10% of sites contain errors. Anvilfield's dealer case sets a 75% service-fit target and holds the remaining 25% for resolution. The screen detects problems; the fit decision controls dispatch eligibility.

A standard list of 100 matched commercial buildings costs $1,000 to $2,000 at the published subscription rates. Keep 3 qualification dimensions separate: equipment evidence, service fit and buying readiness. These are Anvilfield operating benchmarks; the source and settings appear in Methodology.

Field ruleWorking benchmarkDecision controlled
Assembly identity1 asset ID per generator setDeduplicate the physical fleet
Evidence freshness2 dates: source and reviewKnow when the observation was made
Plant-to-set ratio100 plants x 1.30 = 130 setsTranslate accounts into equipment workload
Annual replacement exposure5.0% to 6.7%; central 5.7%Plan a stable-stock replacement queue
Random review screen30 sites; 95.8% detection at 10% error prevalenceFlag the file for deeper review
Service-fit hold queue75% target; 25% heldKeep unresolved scope out of dispatch
Standard building-list budget$1,000 to $2,000 per 100 buildingsBudget the starting frame
Qualification dimensions3: evidence, service fit, buying readinessKeep a visible set separate from a purchasing opportunity

Worked example: Anvilfield estimate for a regional standby dealer with four territory reps

A regional standby dealer with 4 territory reps covers a district containing 10,000 commercial buildings. Applying the national reference incidence produces 947 standby-engine buildings. The central stationary-equipment and shared-campus factors reduce that to 855 distinct plant sites; the central multiplicity produces 1,112 generator sets.

The dealer qualifies 75% of plant sites for its supported equipment, travel and access rules. That leaves 641 service-fit sites and 214 sites requiring resolution. An even workload split gives roughly 160 service-fit sites per rep, before allowing for differences in equipment complexity or purchasing responsibility.

The reference fleet generates 64 annual replacement positions at the central planning life. The team uses those positions to organize condition reviews and owner discussions. Installation dates, repair histories and owner capital plans decide which individual sets enter a proposal queue.

For capacity planning, the proposed supplemental inspection scope includes 2 contractor visits per service-fit site annually at 2 on-site hours per visit. Full coverage requires 1,282 visits and 2,564 on-site technician hours. Add travel, reporting, training and emergency capacity before committing a route. Required exercise, switching, engine service and load testing retain separately assigned scopes.

The sales manager's next decision is whether the shop can deliver that workload at the available locations. Assign the qualified sites to actual routes, inspect the unresolved queue and match appointment windows to technician capacity. Record won agreements separately from qualified sites so the planning file continues to show both market coverage and sold work.

Dealer planning stepCalculationResult
Standby-engine buildingsDistrict buildings x unrounded weighted standby incidence947 buildings
Distinct stationary plants947 x 0.95 x 0.95; round855 sites
Generator sets855 x 1.30; round1,112 sets
Service-fit sites855 x 75%; round641 sites
Annual replacement positions1,112 / 17.5; round64 sets
Supplemental visits at full coverage641 x 21,282 visits
Supplemental on-site hours1,282 x 22,564 hours

How does the installed base become a service program?

Price the service responsibility attached to the equipment. The engine, starting system, cooling circuit, transfer equipment and fuel supply create different tasks. A set count is useful for route planning, while the verified scope determines labor, parts, test equipment and required access.

Cummins' transfer-switch application manual treats inspection, testing and maintenance as distinct activities. Carry that distinction into quotations. Confirm the current installed-equipment instructions, site requirements and approved switching arrangements before assigning work. An engine maintenance agreement should state who handles the ATS, fuel and load testing.

Use the load-bank testing guide to organize the test record and the acceptance-turnover guide to document the equipment baseline. Obtain earlier results where available. They help the service team understand recurring faults, changes in supported load and missing documentation before an owner approves a new scope.

For fuel work, record the tanks, delivery arrangements, sampling responsibility and usable equipment access. EPA's Power Resilience Guide emphasizes fuel planning and generator availability during disruption. Apply those questions to the owner conversation, then use the day-tank and fuel-service guides for the technical survey.

Keep supplemental contractor visits distinct from the owner's complete maintenance program. Assign every required activity to a responsible party and identify the trigger, whether calendar time, running hours or an operating event. The account becomes serviceable when the scope, access and responsibilities fit the shop's actual capability.

Generator load-bank testingGenerator load-bank testing
Generator acceptance and turnoverGenerator acceptance and turnover
Generator fuel system and day tankGenerator fuel system and day tank
Generator fuel-tank service opportunitiesGenerator fuel-tank service opportunities
Transfer-switch maintenance scopeTransfer-switch maintenance scope
Generator and fuel resilience planningGenerator and fuel resilience planning

When does an installed set become a replacement opportunity?

Move a set into a replacement review when its condition, supportability, load requirement or owner plan supplies a reason. Capture service findings, control-system support, recurring failures and changes in the facility. Age organizes the research queue; the equipment record explains the proposed work.

Review the complete power system before presenting a new set as a straightforward exchange. The fuel supply, pad, exhaust arrangement, transfer equipment and controls all affect the scope. A change in critical load also requires an engineering review. The sizing and paralleling guides explain the technical information that belongs in that handoff.

Record the engine's fuel, applicable permitting basis and operating purpose. EPA's stationary-engine overview distinguishes engine categories and regulatory applicability. Assign those questions to the responsible technical reviewer before promising a replacement or testing program. An exterior enclosure does not establish its permitted operating role.

Separate complete replacement, major repair and component modernization in the sales forecast. A controller upgrade preserves an operating set; adding another set expands the plant; replacing a failed set closes the outgoing asset record. Keeping those events distinct lets the manufacturer compare installed-base change with shipments and aftermarket activity.

Generator sizing and selectionGenerator sizing and selection
Generator paralleling switchgearGenerator paralleling switchgear
Switchgear and transformer replacement demandSwitchgear and transformer replacement demand
Stationary-engine applicabilityStationary-engine applicability

How do leaders keep dealer coverage current?

Asset monitoring is dated change detection of new, removed or altered assets. In a generator territory, compare observations against the existing equipment register, then route each change to someone who can resolve its commercial meaning. A new enclosure starts an installation check; a removed set starts an asset-status check.

Dealer groups maintaining coverage use PorchRocket's Asset Search for custom finding and monitoring of assets visible from above, with pricing set by scope. Give the monitoring task a defined territory, asset description and review standard, then connect accepted changes to the responsible dealer.

Retain previous observations when a site changes. A moved enclosure and a replaced generator create different inventory events. Confirm what happened through owner records or a survey before changing the active count. Record the evidence date separately from the date the sales team received the update.

Close the loop after field work. A corrected asset identity, a new service agreement or an owner-confirmed retirement should update the register and the relevant account view. Review unresolved findings with the channel regularly. The measure of a maintained map is whether the next person can explain the current equipment count and the evidence behind it.

Asset monitoringAsset monitoring
Commercial standby generators in the USCommercial standby generators in the US

Common mistakes

Do not add building counts, plant sites and sets into the same total. Preserve their relationships and state the counting unit in every territory report. Campus purchasing and shared plants deserve explicit links because they change both account coverage and equipment density.

Do not identify the generator brand, fuel or rating from enclosure appearance alone. Carry unresolved fields until a traceable equipment record supplies the answer. Keep indoor and screened installations in the research frame so visible equipment does not become the entire market by accident.

Do not turn a replacement ratio into a sales forecast without the buying evidence. The manufacturer needs the physical population, the dealer needs service fit, and the sales team needs an owner-confirmed action. Keep these measures separate and review their conversion using actual account outcomes.

Dealer territory release checklist

Release the territory when another reviewer can follow a site from the building frame to its equipment record and assigned dealer action. Keep unresolved items visible, with a named person responsible for the next check.

0 of 10 complete

Want this checklist to run itself on every job — with photo proof and a signed record crews can hand the customer? That's FieldOS.

Methodology

The calculation reads 6,436 records from EIA's 2018 CBECS public-use file and applies FINALWT to ENGINE=1 and GENUSE=1. The latter means generation primarily for emergency backup or testing. It sums building weights by size and principal activity; ratios use the weighted denominator. This is the 2018 commercial-building reference stock analyzed in 2026, without a current-year growth multiplier. The CBECS frame covers commercial buildings above 1,000 square feet; residential, industrial and standalone infrastructure fleets receive no added allocation.

Building-row bounds are approximate 95% sampling intervals using 151 replicate weights, factor 1 and 1.96 standard errors. Ratios are recalculated within each replicate. Public-use masking affects comparability with unmasked tables. Low and high subgroup bounds are computed separately and are not additive.

Anvilfield model assumptions, low/central/high: stationary shares of 90/95/100%; unique plant sites per retained building of 0.90/0.95/1.00; and 1.10/1.30/1.60 sets per plant. The stationary factor removes temporary equipment, while the plant factor consolidates buildings sharing a plant. These are planning inputs, not CBECS measurements. Multiplying them by the corresponding building bounds gives model scenarios; the set-count range is not a statistical confidence interval. No brand, fuel, size or visibility split is imposed.

Replacement divides modeled sets by 20/17.5/15 years respectively. Duke Energy One's 2025 publication supplies the 15 to 20-year commercial backup planning reference; Anvilfield supplies the midpoint and its application across this fleet. The calculation uses stable stock and staggered retirement, with no growth, backlog or sales-capture allocation. National calculations retain full precision until display; count rows round to the nearest thousand and rates to a decimal place.

The dealer case uses 10,000 buildings at the unrounded national incidence, rounds each physical-count stage, qualifies 75% of plant sites, and divides coverage across 4 reps. Its supplemental scope uses 2 visits at 2 on-site hours per visit, excluding travel and other work. Benchmark settings are operating policies; the independent audit screen computes 1 - (1 - 0.1)^30. It measures error detection, not inventory accuracy.

PorchRocket's Ground Control publishes commercial building-list subscription prices of $10 to $20 per building with delivery within 48 hours. The list-budget benchmark multiplies those rates by 100 matched buildings; custom generator search, field verification and outreach are scoped separately. Public sources and their years follow.

S1: EIA CBECS public microdataS1: EIA CBECS public microdata
S2: EIA variable and response codebookS2: EIA variable and response codebook
S3: EIA public-use microdata guideS3: EIA public-use microdata guide
S4: Duke Energy One generator lifespanS4: Duke Energy One generator lifespan
S5: Cummins T-011 transfer switch application manualS5: Cummins T-011 transfer switch application manual
S6: EPA Power Resilience GuideS6: EPA Power Resilience Guide
S7: EPA stationary-engine compliance overviewS7: EPA stationary-engine compliance overview
S8: EIA CBECS terminologyS8: EIA CBECS terminology
S9: PorchRocket Ground ControlS9: PorchRocket Ground Control
S10: PorchRocket Asset SearchS10: PorchRocket Asset Search
InputSource yearValue or evidence used
S1. EIA microdata2018; revised 20226,436 records; weighted equipment, use, size and activity
S2. EIA codebook2018; revised 2022ENGINE, GENUSE, FINALWT, SQFT and PBA definitions
S3. EIA microdata guide2023151 replicate weights; variance factor 1
S4. Duke Energy One202515 to 20-year commercial backup lifespan reference
S5. Cummins T-0112014Transfer-switch inspection, testing and maintenance scope
S6. EPA resilience guide2023Generator availability and fuel logistics
S7. EPA engine overviewUndated; reviewed 2026Engine categories and applicability questions
S8. EIA terminology2018 survey definitions; live page reviewed 2026Commercial-building universe and exclusions
S9. Ground ControlLive offer reviewed 2026$10 to $20 per building; within 48 hours
S10. Asset SearchLive offer reviewed 2026Custom visible-asset search and monitoring; owner of record; scope pricing

Related tools

Next step: Scope a generator asset search

FAQ

How many commercial standby generators does Anvilfield estimate?

Anvilfield estimates 658,000 stationary standby sets associated with the 2018 US commercial building stock, with a range of 419,000 to 1,042,000. Methodology records the building inputs and conversion to distinct plant sites and sets.

What reference year do the generator estimates cover?

The estimates cover the 2018 commercial building stock, analyzed in 2026. A dealer maintains its current local register with dated equipment observations, owner records and completed service work.

Why do buildings, plant sites and generator sets have different totals?

A shared plant serves several buildings, and a plant contains several sets. The building count describes the survey footprint; the plant count organizes physical service locations; the set count describes the equipment population. Purchasing accounts create another relationship when an owner buys for multiple sites.

Can overhead imagery identify the generator brand or rating?

A reviewed view supports location and visible equipment classification. Manufacturer, model, fuel and rating require evidence tied to the assembly, such as nameplates or owner equipment schedules. Keep screened and interior installations in a records-research queue, and retain unresolved identity fields until verified.

Does the property owner of record buy generator maintenance?

Confirm that role separately. The operator, facilities manager, property manager or central procurement group handles different parts of the buying process. Record who operates the equipment, who holds the service agreement and who approves spending before assigning a commercial next action.

How should dealers use the replacement estimate?

Use the central 38,000-set annual exposure to understand the scale of a stable reference fleet. At the account level, installation records, condition, supportability and owner plans determine the next review. Keep full replacements, additions and component upgrades in separate forecast categories.

Are supplemental inspection visits a complete maintenance program?

The worked case prices only capacity for its defined supplemental scope. Assign required inspections, exercise, testing, maintenance and switching responsibilities separately using the installed-equipment instructions and site requirements. Include travel, reporting and emergency coverage when translating on-site hours into staffing.

Which assets should a manufacturer monitor after the initial search?

Track accepted generator locations for new, removed or altered visible equipment, while maintaining a records route for indoor or screened plant. Reconcile each change with the equipment register, preserve the previous observation and send a specific verification task to the responsible dealer.

People also ask

Sources checked

  • S1. EIA CBECS public microdata Source year: 2018; revised 2022. Weighted building counts, equipment presence, generation use, floor area and principal activity.
  • S2. EIA variable and response codebook Source year: 2018; revised 2022. ENGINE=1 and GENUSE=1 identify reciprocating engines used primarily for emergency backup or testing; FINALWT, SQFT and PBA definitions.
  • S3. EIA public-use microdata guide Source year: 2023. January 2023, pages 1-2: final weights and 151 jackknife replicate weights, factor 1; public-use masking.
  • S4. Duke Energy One generator lifespan Source year: 2025. Published June 20, 2025 in page structured data; commercial backup generator life range 15 to 20 years, used as a planning reference.
  • S5. Cummins T-011 transfer switch application manual Source year: 2014. Issue 4, June 2014, chapter 7: transfer-switch inspection, testing and maintenance are distinct work. The URL upload year is not the manual edition.
  • S6. EPA Power Resilience Guide Source year: 2023. March 2023, generator and fuel sections: ownership, rental access, maintenance and fuel logistics.
  • S7. EPA stationary-engine compliance overview Source year: Undated; reviewed 2026. Engine classifications and applicability questions; no universal operating-hour allowance is inferred.
  • S8. EIA CBECS terminology Source year: 2018 survey definitions; live page reviewed 2026. Commercial-building universe, size threshold and exclusions; no industrial, residential or standalone infrastructure uplift.
  • S9. PorchRocket Ground Control Source year: Live offer reviewed 2026. Commercial building filters, $10 to $20 per building and delivery within 48 hours.
  • S10. PorchRocket Asset Search Source year: Live offer reviewed 2026. Custom finding and monitoring of visible assets, reviewed evidence and owner of record; pricing by scope.
  • PorchRocket commercial subscription pricing Live offer checked November 5, 2026. Commercial Subscribe & save tiers supply the $10 to $20 per-building research budget endpoints; the selected tier determines the quote.