Lighting manufacturers: LED retrofit demand in parking lots and warehouses

Size outdoor and warehouse LED conversion demand from public stock data, then qualify luminaires, controls, channel coverage and buying timing.

Market IntelligenceLighting ManufacturersLED RetrofitParking LotsWarehouse LightingInstalled Base

Direct answer

Lighting manufacturers size LED retrofit demand by mapping parking assets and operating warehouses, verifying legacy lighting and connecting the work to installer coverage. Anvilfield estimates 1,362,000 annual first-conversion system equivalents across the area/parking and selected warehouse applications in its 2026 analysis, with a range of 640,000 to 2,653,000. Keep physical demand, approved projects and manufacturer orders in separate forecast stages.

On this pageWhich lighting assets define the retrofit market?How much LED retrofit demand does Anvilfield estimate?How do you find the right parking lots and warehouses?What makes a site fit the manufacturer and its channel?Which parking lot conditions change the product opportunity?Which warehouse conditions justify a high-bay retrofit?Anvilfield lighting territory benchmarksHow do leading manufacturers turn the stock into channel coverage?Worked territory: a regional lighting manufacturer with four repsWhat should asset monitoring change in the account file?What mistakes inflate an LED retrofit forecast?Manufacturer territory release checklistMethodology

Key takeaways

  • Anvilfield estimates 1,035,000 annual area/parking first conversions in the central 2026 model.
  • Anvilfield estimates 327,000 annual warehouse first-conversion luminaire equivalents in the selected building population.
  • Keep first LED conversions, existing LED renewal and controls-only projects in separate scope classes.
  • Verify technology, accepted lighting layout, purchasing responsibility and installer coverage before forecasting orders.

Which lighting assets define the retrofit market?

Lighting manufacturers size LED retrofit demand by mapping parking assets and operating warehouses, verifying legacy lighting and connecting the work to installer coverage. Anvilfield estimates 1,362,000 annual first-conversion system equivalents across the area/parking and selected warehouse applications in its 2026 analysis, with a range of 640,000 to 2,653,000. Keep physical demand, approved projects and manufacturer orders in separate forecast stages.

Targeted market intelligence means sizing and locating demand at the building level. For lighting, the useful record connects a site, its indoor or outdoor lighting application, the installed equipment, the operating schedule and the party that approves the project. A business address starts the research; the luminaire and its duty determine the product opportunity.

Keep the applications identifiable. The outdoor research starts with the Department of Energy area/parking category, which includes pedestrian and recreation areas and open garage decks. Street and roadway lighting and covered parking garages have separate categories. A commercial parking territory is a filtered portion of that broader outdoor population. The warehouse research selects operating distribution centers and nonrefrigerated warehouses at or above 25,000 gross square feet.

Count light-producing heads separately from poles. Record building, parking area, pole, luminaire and lighting zone as linked objects. A warehouse and its yard carry different schedules, optics, control arrangements and installation access. Preserve the site relationship while assigning each fixture to its application. This lets the same account support coordinated purchasing without counting the same equipment twice.

Maintain distinct opportunity classes for initial LED conversion, existing LED renewal and controls-only work. Each uses a different qualification question. Legacy lamps establish conversion exposure; an aging driver or damaged optical assembly establishes an equipment renewal discussion; missing scheduling or sensing establishes a controls discussion. The estimate table measures the first class.

How much LED retrofit demand does Anvilfield estimate?

Anvilfield estimates 116,000 operating distribution and nonrefrigerated warehouse buildings in the selected 2018 stock, with a range of 92,000 to 140,000. Anvilfield estimates 8.73 billion square feet of lighted area, with a range of 7.41 billion to 10.05 billion, and 5.90 billion square feet of non-LED lighted area, with a range of 4.88 billion to 6.93 billion.

Anvilfield estimates that non-LED lighting served 67.6% of the selected warehouses' lighted area in 2018, with a range of 62.4% to 72.8%. Its 2026 analysis puts remaining non-LED warehouse lighted area at 2.66 billion square feet, with a range of 1.46 billion to 4.16 billion.

Anvilfield estimates 3,269,000 remaining warehouse high-bay luminaire equivalents, with a range of 1,098,000 to 8,311,000. Anvilfield estimates annual warehouse first-conversion demand at 327,000 equivalents, with a range of 88,000 to 997,000.

Anvilfield's research retains a 2018 area/parking baseline of 23,000,000 non-LED systems. Anvilfield estimates 10,350,000 remaining non-LED area/parking systems in its 2026 analysis, with a range of 6,900,000 to 13,800,000, and 1,035,000 annual first conversions, with a range of 552,000 to 1,656,000.

Anvilfield estimates 13,619,000 remaining system equivalents across the outdoor and warehouse applications, with a range of 7,998,000 to 22,111,000. Anvilfield estimates combined annual first-conversion demand at 1,362,000 equivalents, with a range of 640,000 to 2,653,000. Methodology records the public baselines and separates sampling intervals from the 2026 sensitivity ranges.

Anvilfield estimateLowCentralHigh
Operating distribution/nonrefrigerated warehouses, 201892,000116,000140,000
Lighted warehouse area, 2018 (billion sq ft)7.418.7310.05
Non-LED warehouse lighted area, 2018 (billion sq ft)4.885.906.93
Non-LED share of lighted warehouse area, 201862.4%67.6%72.8%
Remaining warehouse non-LED lighted area, 2026 model (billion sq ft)1.462.664.16
Warehouse high-bay luminaire equivalents, 2026 model1,098,0003,269,0008,311,000
Annual warehouse first-conversion equivalents, 2026 model88,000327,000997,000
US area/parking non-LED systems, 2018 baseline23,000,00023,000,00023,000,000
Remaining area/parking non-LED systems, 2026 model6,900,00010,350,00013,800,000
Annual area/parking first conversions, 2026 model552,0001,035,0001,656,000
Combined remaining system equivalents, 2026 model7,998,00013,619,00022,111,000
Combined annual first-conversion equivalents, 2026 model640,0001,362,0002,653,000

How to cite this estimate: Anvilfield, Lighting manufacturers: LED retrofit demand in parking lots and warehouses, 2026, https://anvilfield.com/field-guides/market-intelligence/lighting-manufacturers-led-retrofit-demand-in-parking-lots-and-warehouses/

How do you find the right parking lots and warehouses?

Building-first prospecting means starting with the building and its visible assets, then identifying the decision maker. Draw the territory boundary, identify the applications the product line supports, and establish the evidence needed to accept a site into the file. A warehouse rep needs operating storage space and a supported lighting scope; an area-lighting rep needs a parking or yard application with a viable installation path.

Visible-asset data means facts read from aerial or satellite imagery and checked against records. For outdoor lighting, retain the dated view, visible pole locations, distinguishable fixture heads, lot geometry and neighboring uses. For warehouses, retain footprint, loading context and building use. Add evidence quality and unresolved observations to the record so the rep knows what the image establishes.

An overhead view supports a search for parking assets and warehouse candidates. Establish lamp technology, input watts, circuit voltage, interior mounting conditions and controls through equipment records or an authorized survey. Roof size does not identify interior fixture count. A rectangular luminaire housing does not establish whether its light engine has already been changed.

Leading manufacturers organize territory research around the buildings and assets their channel serves. PorchRocket's Ground Control supplies standard commercial-building lists using filters such as business type and parking lots, delivered within 48 hours. Use those fields to assign research and survey work, then attach the lighting evidence collected by the installer.

Preserve a unique physical site identifier through ownership changes and account reassignment. Adjacent parcels sometimes share a parking area, while a campus contains separate operating buildings. Link each asset to its physical location and each location to the responsible account. A channel manager can then assign coverage without duplicating the stock when a property manager changes.

What makes a site fit the manufacturer and its channel?

Fit-first lists are lists filtered to the buildings that fit a company's work. Define that fit through the application, supported electrical supply, available mounting arrangements, control requirements, service access and channel capability. A rep receives a useful account when those fields point to a product family and a contractor able to survey and install it.

Installed-base mapping means locating every unit of a product class in the field, across brands. For lighting, keep existing manufacturer, luminaire model, lamp or light engine, driver or ballast and control interface in distinct fields. Retain unknown values until evidence resolves them. A familiar pole or housing does not establish the electrical components inside.

Qualify outdoor work by luminaire heads, mounting type, existing circuit records, pole condition, property boundaries and required light distribution. Qualify warehouse work by current equipment, mounting height, aisle geometry, operating pattern, emergency lighting arrangement and access around storage. Link the product family to the required photometric file and the contractor's proposed mounting method.

For custom outdoor inventory work, PorchRocket's Asset Search finds assets visible from above and returns the owner of record on each find. Define the visible acceptance criteria in the research scope, then assign interior lighting verification and electrical qualification to the site survey.

Owner of record, operator and purchaser belong in separate fields. A warehouse tenant pays the electricity bill while the landlord controls alterations; a portfolio manager approves the budget while a local operator schedules access. Record who accepts the design, authorizes the capital and places the order. Resolve those roles before the rep assigns an expected release date.

Which parking lot conditions change the product opportunity?

Start the parking discussion with the existing distribution of light. The owner needs usable illumination at vehicle and pedestrian conflict points, entrances and circulation routes. A lower connected load supports the business case, while the approved photometric design establishes whether the replacement serves the space. Document spill light, glare and obstructions alongside the proposed equipment.

A retrofit kit, a replacement head and a new pole assembly consume different materials and labor. Verify the condition and dimensions of the mounting arrangement, the existing supply and the proposed assembly's compatibility. Keep poles, foundations and underground circuits in separate scope fields so a luminaire count does not silently become a complete site electrical reconstruction.

Record the existing operating schedule and the owner's required nighttime behavior. Photocells, scheduling, dimming and occupancy response belong in the controls scope. Preserve the settings and acceptance criteria that the operator will inherit. The FEMP exterior-lighting guidance describes the role of optics, product performance and controls in an informed purchase; apply the project's adopted requirements to the actual design.

Coordinate with changes in parking use. Accessible routes, revised striping, loading areas and electric vehicle charging alter the locations where people move and work. Keep these projects linked to the lighting account so the rep understands a real scope trigger. A planned charging installation establishes a coordination conversation; the approved design establishes the required lighting and electrical work.

Require an existing-condition record before quoting savings. Use full lighting-system input, including the ballast where present, and document the replacement input separately. Save the schedule evidence and electricity rate used for the energy calculation. Keep maintenance access, controls commissioning and pole repairs visible in the commercial scope.

Which warehouse conditions justify a high-bay retrofit?

An operating warehouse earns priority when its existing lighting, schedule and product fit support an accepted project. Establish the actual storage layout and task surfaces before choosing the luminaire. Rack aisles, open staging areas, picking stations and docks require different distributions. Record changes planned by the tenant, because a new rack arrangement changes the design basis.

Use the installed fixture schedule to replace area-based screening counts as the account advances. Document fixture locations, full-system watts, supply characteristics, mounting arrangements and the lighting conditions that the owner wants corrected. The manufacturer needs a supported application and a quantity tied to an accepted layout. The installer needs access, isolation arrangements and a workable sequence around operations.

Treat controls as an operating design. Occupancy patterns, daylight openings, sensor placement and equipment traffic determine the control zones. Confirm that the light engine, driver and control system support the specified behavior. Preserve the sequence of operation and the commissioning record so the owner can maintain the intended schedule after occupancy or storage patterns change.

FEMP's commercial and industrial luminaire guidance calls for comparing like products and considering light distribution, controls and operating conditions. Use the applicable product data and project requirements when evaluating a high-bay family. Keep the performance evidence beside the quoted configuration so a substitution receives the same review as the original selection.

Identify emergency and egress lighting before the replacement scope is released. Save the relevant circuit directory, emergency supply arrangement and test responsibility with the survey. Carry the approved operating and emergency sequences into closeout. These records protect the relationship between the new equipment and the building systems it must serve.

Anvilfield lighting territory benchmarks

Use the following rules as explicit operating settings in a territory worksheet. Count the light-producing head, preserve the scope class, and convert area to a screening quantity only after defining the supported application. Replace screening geometry with surveyed equipment and the accepted lighting layout before releasing a purchase quantity.

Field ruleBenchmarkBasis and action
Count the emitting head1 luminaire ID per headPreserve a separate pole ID; count multiple heads separately.
Keep retrofit scopes separate3 scope classesFirst LED conversion, existing LED refresh, controls-only work.
Convert eligible warehouse area to a screening count154 equivalents per 100,000 suitable sq ftCentral density is 650 sq ft per luminaire; replace with the actual layout.
Translate remaining stock into annual work80 / 100 / 120 per 1,000 remaining unitsLow/central/high annual conversion settings; physical stock is separate from orders.
Screen outdoor energy1,050 kWh saved per luminaire annually400 W to 150 W at 4,200 hours; full system input.
Screen warehouse energy810 kWh saved per luminaire annually450 W to 180 W at 3,000 hours; full system input.
Add controls after LED savings126 outdoor or 108 warehouse kWh per luminaire annually20% reduction in post-LED energy, applied to the remaining LED load.
Keep electricity prices separate$157.50 outdoor or $121.50 warehouse per luminaire annually$0.15/kWh; energy-only value before controls.

How do leading manufacturers turn the stock into channel coverage?

Build channel assignments around the work the installer supports. Match the territory's product families, mounting conditions and controls requirements to contractor capability and distributor availability. A dense account cluster has commercial value when the channel can survey it, supply the accepted configuration and install around the customer's operations.

Keep stock, surveyed opportunity, approved project and released order as distinct stages. Give each stage an evidence requirement and an owner. The distributor receives a product configuration and timing signal; the rep receives an account action; manufacturing receives an order forecast tied to accepted scope. This preserves a traceable path from the market estimate to production demand.

Manufacturers coordinating repeated territory reviews use building-level evidence to keep channel assignments current. PorchRocket's Asset Search supports custom visible-asset finding and monitoring, with pricing quoted for the scope. Match the research boundary and visible criteria to the outdoor applications the channel can verify and serve.

Return installer findings to the physical register. Confirmed LED conversions close the legacy opportunity and start an equipment service history. Unsupported mounts move into a design exception queue. Recently renewed sites retain their account relationship with a later review action. A rejected classification improves the search criteria instead of remaining an unexplained lost lead.

Worked territory: a regional lighting manufacturer with four reps

Anvilfield's typical regional lighting-manufacturer case assigns 4 reps to 60 parking sites and 40 warehouses. Each parking site carries 20 luminaire heads; each warehouse has 78,000 square feet of lighted area. The research file assigns 25 sites to each rep.

Anvilfield calculates 1,200 outdoor luminaires and 3,840 warehouse equivalents in this territory, for 5,040 screened system equivalents. The account review retains 40% as legacy equipment fitting a first LED conversion, producing a qualified remaining stock of 2,016 equivalents. The reps keep lighting survey evidence beside that classification.

Anvilfield calculates annual territory conversion demand of 202 equivalents using the central annual activation setting. Channel reach of 70% brings 141 equivalents into supported installer coverage. A 30% win share within reached demand produces a probability-weighted manufacturer forecast of 42 luminaires annually. Actual project releases follow the accepted site scopes.

Anvilfield calculates annual energy savings of 1,748,160 kilowatt-hours when all qualified legacy equipment in this territory is converted on the selected power and schedule settings. At the selected electricity price, that is $262,224 in annual energy value before additional controls. This value describes conversion of the whole remaining qualified stock; the annual manufacturer order forecast follows the narrower commercial funnel.

Keep territory assets, qualified legacy equipment, annual activity, channel reach and wins in separate forecast fields. A lighting survey changes the equipment inventory; a new installer changes reachable demand; an accepted purchasing release changes the order plan. Update the responsible field and retain the supporting evidence.

Planning stageSystem equivalentsBasis
Screened outdoor and warehouse stock5,0401,200 outdoor plus 3,840 indoor equivalents
Qualified legacy stock2,01640% of screened stock
Annual territory conversion demand20210% of qualified legacy stock
Annual channel-reached demand14170% of annual territory demand
Annual manufacturer wins4230% of reached demand; probability-weighted volume

What should asset monitoring change in the account file?

Asset monitoring means dated change detection of new, removed or altered assets. For lighting territories, track changes in visible site layout and outdoor assets, then connect those observations to permits, contractor findings and owner records. Save the observation date and the evidence date separately so a newly received record is not mistaken for a newly installed fixture.

Close a conversion opportunity when the accepted evidence establishes completed work. Record the installed product family, configuration and commissioning documents with the asset history. A new housing, an altered parking layout or a building expansion creates a review action. Interior lighting changes enter through the warehouse survey and operating records.

Keep removal, technology conversion and account reassignment identifiable. A removed luminaire leaves the active stock. A renewed luminaire stays in the physical register with updated equipment history. A change in operator changes the purchasing relationship. Preserving those distinctions makes the next territory estimate and distributor conversation more accurate.

What mistakes inflate an LED retrofit forecast?

Treating all warehouse floor area as high-bay area inflates the fixture screen. Public rental storage, small storage buildings, offices within warehouses and unlighted space have different applications. Preserve the selected activity, operating filter, lighted-area calculation and supported-area setting beside the quantity. A product rep can then explain the population being served.

Treating every old property as a legacy-lighting account loses recent retrofits. Keep building age, luminaire installation and latest lighting conversion in separate fields. A historical non-LED population becomes a current demand model through an explicit retained-stock setting. Replace that setting with verified lighting history as the territory file develops.

Treating a housing shape as confirmed lamp technology sends the wrong product and savings proposal. Treating connected watts as energy loses the operating schedule. Treating the entire physical market as manufacturer orders loses channel coverage and buying timing. Keep the evidence and the commercial stage attached to every forecast quantity.

Adding controls savings to the original legacy energy after already claiming the full LED reduction counts some energy twice. Calculate the LED load first, then apply the controls effect to that remaining load. Keep energy charges, demand charges, installation cost, maintenance and incentives in identifiable parts of the account economics.

Manufacturer territory release checklist

Release a territory file when the physical scope, evidence and next commercial action can be reviewed together. Assign unresolved observations to the person responsible for resolving them.

0 of 10 complete

Want this checklist to run itself on every job — with photo proof and a signed record crews can hand the customer? That's FieldOS.

Methodology

Research notes, November 5, 2026. The source register identifies the public inputs and years. Sources S1 through S7 were downloaded with curl and returned HTTP 200. The saved AF-M033 estimate script reads the retained EIA microdata, calculates weighted reference quantities and sampling intervals, applies the stated research settings and emits the tables used here.

Warehouse selection uses PBAPLUS 9 or 10, SQFT at least 25,000, LIT equal to 1, positive WKHRS and a reported LTOHRP. This retains 489 sample records. Lighted area equals gross floor area times LTOHRP divided by 100. Non-LED lighted area equals that result times the complement of LEDP divided by 100; LED equal to 2 sets LED area share to zero. Sum each quantity using FINALWT. The area share divides weighted non-LED lighted area by weighted lighted area.

The first four estimate rows use approximate 90% sampling intervals. Following the EIA user guide, recalculate each quantity with FINALWT1 through FINALWT151, sum squared deviations from the full estimate and take the square root for its standard error. Apply 1.645 standard errors on either side. Recalculate the area ratio within each replicate. The public file uses masked building records. The outdoor baseline subtracts 27.1 million LED systems from 50.1 million total systems in DOE's 2018 area/parking inventory.

Anvilfield assumptions for low, central and high 2026 demand retain 30%, 45% and 60% of the 2018 non-LED stock or area. Apply those shares to the corresponding warehouse sampling endpoints and the fixed outdoor baseline. Warehouse high-bay suitability is 60%, 80% and 100% of retained non-LED lighted area; layout density is 800, 650 and 500 square feet per luminaire. Divide suitable area by density to obtain luminaire equivalents. Annual first conversions equal remaining units times 8%, 10% and 12%, respectively. The model envelopes combine sampling and operating settings; the assumption ranges are sensitivity ranges. The model holds the reference cohort boundary fixed and excludes new construction, existing LED refresh and controls-only orders.

Energy assumptions use outdoor system input of 400 W before conversion and 150 W afterward, at 4,200 annual full-power hours. Warehouse inputs are 450 W and 180 W at 3,000 hours. Annual kilowatt-hours saved equal the watt reduction times annual hours divided by 1,000. Energy value uses $0.15 per kilowatt-hour. The controls benchmark removes another 20% of post-LED energy. These are Anvilfield screening settings; installed equipment and operating records establish project values.

Worked-territory assumptions are 4 reps, 60 parking sites with 20 heads each, and 40 warehouses with 78,000 lighted square feet each. Use the central warehouse suitability and density settings, 40% verified legacy share, 10% annual activation, 70% channel reach and 30% wins within reached demand. Shares apply equally to indoor and outdoor quantities. The stock stays constant during the annual step. Retain fractions through the funnel and round displayed counts at the end. Stock energy value converts the entire qualified legacy population; it does not apply the annual activity or commercial shares.

For the standard-list portion of the research budget, PorchRocket's Ground Control publishes commercial-building pricing of $10 to $20 per building. Keep that procurement line beside the building filters, and record the separate custom scope when commissioning outdoor asset research. Public DOE and EIA inputs supply the estimate baselines; the retained-stock and conversion settings are Anvilfield's research assumptions.

S1: 2020 report; 2018 stockDOE LED adoption report
S2: 2018 survey; revised December 2022EIA CBECS public use microdata
S3: 2018 survey; revised December 2022EIA variable and response codebook
S5: 2018 reference year; page undatedEIA warehouse and storage activity report
S7: Guidance updated June 2023DOE FEMP exterior lighting
Public inputValue or fact usedSource and year
Area/parking installed stock50.1 million total; 27.1 million LEDS1: DOE, August 2020 report; 2018 stock
Warehouse activity and sizePBAPLUS 9/10; SQFT; lighting and operating fieldsS2: EIA 2018 microdata, revised December 2022
Lighting variable meaningsLTOHRP is percent lit when open; LEDP is percent of lighted areaS3: EIA 2018 codebook, revised December 2022
Survey weights and uncertaintyFINALWT; 151 replicate weights; coefficient 1S4: EIA user guide, January 2023
Warehouse category boundaryIncludes rental storage and refrigerated categories in the broader populationS5: EIA activity report; 2018 data, page undated
Warehouse product evaluationLike-product comparison; photometric performance and controlsS6: DOE FEMP guidance, updated June 2023
Outdoor product evaluationLuminaire performance, optics and control behaviorS7: DOE FEMP guidance, updated June 2023

Related tools

Next step: Build a lighting territory list

FAQ

How large is the LED retrofit market in parking lots and warehouses?

Anvilfield estimates 1,362,000 annual first-conversion system equivalents across the modeled area/parking and selected warehouse applications, with a range of 640,000 to 2,653,000. Methodology records the reference stock and conversion settings.

Does the outdoor estimate count only commercial parking lots?

The outdoor baseline follows DOE's area/parking application, including pedestrian and recreation areas and open garage decks. Street lighting and covered parking garages have separate categories. Filter the broader stock to the commercial sites and outdoor applications the manufacturer and its channel support.

Which warehouses are included in the estimate?

The reference population is operating distribution and nonrefrigerated warehouses of at least 25,000 gross square feet with usable lighting data. Public rental storage and refrigerated warehouses are outside this selected population. Methodology records the activity and lighting filters.

Can aerial imagery confirm that a lighting system needs an LED conversion?

Use imagery to locate visible outdoor assets and warehouse candidates, with dated evidence. Confirm the existing light engine, driver or ballast, full-system input and controls through records or a site survey. Preserve unknown technology as unresolved until the qualifying evidence establishes the conversion scope.

Is a luminaire equivalent an installed fixture count?

A warehouse luminaire equivalent converts suitable lighted area into a screening quantity using the selected layout density. Replace it with the surveyed fixture schedule and accepted photometric layout as the account advances. Outdoor quantities in the DOE baseline count lighting systems rather than poles.

How much energy does the lighting retrofit benchmark save?

Anvilfield calculates 1,050 kilowatt-hours saved per outdoor luminaire annually using 400 W to 150 W at 4,200 hours. The warehouse benchmark saves 810 kilowatt-hours using 450 W to 180 W at 3,000 hours. Use measured system input and documented operating schedules for the account calculation.

Should controls savings be added to LED savings?

Calculate the remaining LED energy first, then apply the controls effect to that load. Anvilfield's controls benchmark removes 20% of post-LED energy, adding 126 kilowatt-hours of annual outdoor savings or 108 kilowatt-hours of warehouse savings per luminaire under the selected schedules.

How does the manufacturer turn demand into its own forecast?

Keep physical stock, qualified conversion scope, annual activity, channel reach and wins as separate stages. The worked territory contains 2,016 qualified legacy equivalents, supports 202 annual territory conversions, reaches 141 through the channel and produces 42 probability-weighted manufacturer wins. Reconcile released orders to accepted site scopes.

People also ask

Sources checked

  • S1. DOE LED adoption report Source year: 2020 report; 2018 stock. Section 3.9.1 and Table 3.9: 50.1 million area/parking systems, 27.1 million LED systems. Includes outdoor pedestrian/recreation areas and open garage decks; excludes roads and covered garages.
  • S2. EIA CBECS public use microdata Source year: 2018 survey; revised December 2022. PBAPLUS, SQFT, LIT, LTOHRP, WKHRS, LED, LEDP, FINALWT and FINALWT1 through FINALWT151.
  • S3. EIA variable and response codebook Source year: 2018 survey; revised December 2022. PBAPLUS 9 is distribution/shipping; 10 is nonrefrigerated warehouse; 11 is public rental storage. LEDP is percent of lighted area, not percent of fixtures.
  • S4. EIA public use microdata user guide Source year: January 2023. Final sampling weights; jackknife variance equals sum of squared deviations across 151 replicates, coefficient 1.
  • S5. EIA warehouse and storage activity report Source year: 2018 reference year; page undated. Warehouse classification includes public rental storage and refrigerated premises. Context for segment exclusions; no extra numeric input.
  • S6. DOE FEMP commercial and industrial LED luminaires Source year: Guidance updated June 2023. Like-product comparison, photometric performance, occupancy sensing and daylight dimming. Context only; no federal efficiency threshold used as a private-market requirement.
  • S7. DOE FEMP exterior lighting Source year: Guidance updated June 2023. Area lighting, optics, controls and product performance. Context only; no conversion rate or installed watts supplied by this source.
  • PorchRocket Ground Control Live offer, reviewed November 5, 2026. Business type and parking filters; commercial lists $10 to $20 per building, within 48 hours. Product facts only; excluded from the physical-demand calculation.
  • PorchRocket Asset Search Live offer, reviewed November 5, 2026. Custom finding and monitoring of assets visible from above, with owner of record on each find; quote by scope. Product facts only.