ANVILFIELD Try FieldOS

Plumbing

No hot water from a tankless heater? Navien, Rheem and A. O. Smith checks

Exact-model checks for activation flow, fault codes, cold-water sandwich and distribution problems, with a worked flow comparison and a service handoff record.

Tankless Water HeatersNo Hot WaterNavien NPE-2Rheem IKONICA. O. Smith ATI-540HPlumbing Diagnostics

Direct answer

Check power and the controller's enabled state, record the exact model and fault code, then compare one fixture with the rest of the building. The published minimum through-heater flows are 0.5 GPM for Navien NPE-180S2 in its January 2026 Installation Manual, 0.4 GPM activation for Rheem IKONIC RTGH-S11i in AP23209 Rev 03, and 0.5 GPM startup at the default temperature for A. O. Smith ATI-540H in 2000534710 Rev. C. When confirmed flow is sufficient but water stays cold, match the heating state and literal code to that model's manual; when the heater outlet is hot but one fixture stays cold, follow the mixing and distribution branch. For gas odor, leave and call the gas supplier from outside; for a carbon monoxide alarm, leave and call emergency services.

On this pageWhich model and manual apply?When do you stop checking and leave?Is the fault at the fixture, heater or supply?What flow starts each heater?How do you measure flow and separate it from mixing?Which Navien codes apply to NPE-2?Which Rheem codes apply to IKONIC?Which A. O. Smith codes apply to ATI-540H?Is it a cold-water sandwich, crossover or recirculation fault?Why do winter weather and large draws change the answer?When do maintenance and resets belong in diagnosis?What should the service quote include?What should you record before handing the job over?

Which model and manual apply?

Start with the rating plate, not the brand name on the cabinet. Photograph the full model, series, serial number, fuel and conversion label, then identify the indoor or outdoor arrangement, controller and any linked heaters. Preserve model suffixes when selecting instructions; a conversion label is relevant only where that manufacturer permits conversion.

This comparison covers gas condensing Navien NPE-180S2, Rheem IKONIC RTGH-S11i and RTGH-SR11i, and A. O. Smith ATI-540H-N, Series 100. Navien NPE-180A2 appears separately because its internal pump, buffer and recirculation configuration change low-flow delivery. Electric tankless heaters, combi boilers and other generations need their own manuals.

A. O. Smith's ATI-540H Series 100 support listing marks that model discontinued and links the operating manual used here.

What belongs in the manual register?

Record the document title, identifier, revision, printed page and direct URL alongside the asset. Navien's download listing calls its installation document an installation and operation manual, while the served PDF is titled Installation Manual, Version 2.0, January 2026, 20049624B; the separate user's manual is Version 1.0, 2020, 20049624A.

The installation manual governs installation and supply limits, the user's manual supports normal observations, and the technical manual supplies service diagnostic paths. For selection rather than fault diagnosis, compare water heater types.

Table 1. Model/manual register
Model scopeApplicationGoverning documentsEdition / identifierRelevant locationApplicability rule
Navien NPE-180S2Gas condensing; S2 configurationInstallation Manual, S2; User's Information Manual, S3S2: Version 2.0, January 2026, 20049624B; user: Version 1.0, 2020, 20049624AInstallation specifications p. 7; user troubleshooting pp. 16-18The NPE-S2 model does not receive the A2 low-flow recirculation exception
Navien NPE-180A2Gas condensing with internal pump and bufferSame family documents, plus specification sheet, S4Specification 1-NPE2-SS-001-1.1; family manual as aboveInstallation p. 27 and specifications p. 7Low-flow option requires A2 configuration
Rheem IKONIC RTGH-S11i / RTGH-SR11iGas condensing; SR has built-in recirculationTechnical Training and Service Manual, S5; Use and Care Manual, S6AP23209 Rev 03; AP22745 Rev 04Technical p. 7, pp. 37-45, 60, 64; user service chart p. 93Preserve prefixes; pump faults remain SR-specific
A. O. Smith ATI-540H-N, Series 100Indoor gas condensing; discontinued listingModel support listing, S7; Installation Manual and Owner's Guide, S8; specification, S92000534710 Rev. C, 68A161-7; AOSRG46835, April 2023Owner pp. 46, 50-56, 64; spec p. 2Preserve 540, indoor and Easy-Link qualifiers

When do you stop checking and leave?

Gas odor ends the diagnostic sequence. The front-cover warnings in Navien NPE-2 Installation Manual v2.0, Rheem AP22745 Rev 04 and A. O. Smith 2000534710 Rev. C direct occupants not to attempt ignition, operate electrical switches or use a telephone inside; leave and call the gas supplier from outside, then the fire department if the supplier cannot be reached. Follow the supplier's instructions about reentry.

The U.S. Consumer Product Safety Commission's CO guidance directs occupants to move outside immediately when a carbon monoxide alarm sounds, call emergency services and wait for responder permission before reentering.

A damaged or disconnected vent, soot, flooding, or water contacting electrical equipment also ends firing trials. Navien NPE-2 User's Information Manual v1.0, p. 5, requires discontinued operation for damaged venting; Rheem AP22745 Rev 04, p. 3, prohibits operation without proper venting. Use the model's shutdown instructions only from a safe location; stay clear of wet electrical equipment. The water-heater venting and combustion air guide explains the installation questions a technician must resolve.

A. O. Smith 2000534710 Rev. C, pp. 6 and 31, requires a flooded heater to be replaced by a qualified installer or service agency. Drying it out and resetting it is not the prescribed remedy. Navien's v1.0 user manual, p. 5, instead requires inspection before reuse after flood damage; preserve the installed manufacturer's disposition.

Safe observations are the accessible display, literal code, normal heating indicator, affected fixtures and visible external conditions. Measure discharge temperature with a suitable thermometer, and collect water only where the stream is safe to handle. Gas-pressure measurement, combustion analysis, internal wiring tests, component replacement and vent alteration belong to a qualified service technician; never defeat scald protection to force activation. The temperature warnings in Rheem AP22745 Rev 04, p. 4, and A. O. Smith 2000534710 Rev. C, p. 46, apply during diagnostic draws as well as normal use.

Is the fault at the fixture, heater or supply?

Describe what fails before choosing a test. No water at the hot tap, cold water flowing normally, delayed hot water, a cold interruption and lukewarm water during heavy use are different complaints.

Compare one affected fixture with a second accessible fixture while recording heater flow and heating state. If the second fixture gets hot, the heater has demonstrated heat production under that draw condition. The first fixture still needs its own flow and temperature comparison: a restricted cartridge or mixer can reduce hot-side demand enough to prevent activation.

A. O. Smith's 2000534710 Rev. C says the controller display goes dark after five minutes without operation; Easy-Link child controllers also do not display the set temperature. Check the STAND BY indicator and normal demand response before treating a blank screen as a power failure. Standby power alone does not establish burner operation.

These gas heaters still require electricity for controls and operation. The ATI-540H no-hot-water checklist specifies 120 VAC, 60 Hz, so record a recent outage and whether the controller is enabled before attributing the symptom to a failed board. When both hot and cold flow are weak throughout the building, follow water-pressure and PRV diagnosis alongside the heater checks.

The following triage is Anvilfield's diagnostic interpretation of the manufacturer troubleshooting paths. Note recent plumbing work, accessible shutoff positions and previous resets without operating unfamiliar gas valves.

Table 2. Symptom-to-next-test triage
ObservationFirst comparisonPlausible branchNext action / boundarySource
No hot-side flowCold supply; other hot fixturesSupply closed, obstruction or freezingRecord outlets and freeze exposure; no dry firingS3 p. 16; S8 p. 52
Dark display; all fixtures coldOutage; standby; demand responseSleep, disabled control or power faultAccount for ATI-540H sleep/Easy-Link; then verify powerS8 pp. 52-53
One shower cold; another hotHeater state during each drawLocal restriction, mixer or cross connectionCompare local flow/temperature; fixture diagnosisS3 p. 16; S8 p. 52; Anvilfield interpretation
Cold flow; no heat/codeHeater flow; enabled state; inlet versus setpointLow/unsensed flow or warm inletTable 3; confirm state/temperature before sensing diagnosisS3 p. 16; S5 p. 37; S8 p. 52
Hot-cold-hot after stopping and restartingContinuous draw versus restart drawRestart thermal gapRecord timing; check model's buffer/recirculation arrangementS2 p. 27; S10
Repeated cold during continuous drawFlow/flame during interruptionFlow dropout, supply interruption or control faultLog sequence/code; model diagnosticsS3 pp. 16-18; S8 p. 52
Hot outlet but cooler mixed fixtureOutlet/fixture temperatures; draw stateDistribution heat loss or mixing/crossoverVerify mixing/return arrangementS3 p. 16; S8 p. 52
Multiple fixtures: lukewarm/reduced flowInlet temperature; manufacturer capacity curveOutput or fuel limitationCompare temperature rise and dynamic gas pressureS5 p. 60; S8 pp. 51-52, 64

What flow starts each heater?

Navien's January 2026 NPE-2 Installation Manual lists 0.5 GPM as the NPE-S2 minimum flow, with a separate less-than-0.01 GPM option for A2 models. The A2 option belongs to its documented ComfortFlow recirculation configuration; it is not an S2 ignition adjustment. See the installation specification, p. 7 and the specification footnote before applying it.

Rheem's IKONIC Technical Training and Service Manual AP23209 Rev 03 specifies 0.4 GPM minimum activation flow and 0.26 GPM extinction flow for RTGH-S11i and RTGH-SR11i.

A. O. Smith's ATI-540H Owner's Guide 2000534710 Rev. C requires 0.5 GPM to activate at the default temperature and 0.4 GPM to continue firing after ignition.

Compare those limits with flow through the heater. A shower's mixed discharge contains cold water that never passed through the heater, while other fixtures and recirculation can add heater flow. Startup, continuation, sensor resolution and maximum thermal output describe separate boundaries; a rounded controller reading exactly at a threshold does not prove a stable operating margin.

Why can a second tap make the hot water work?

A second hot-side draw can lift total heater flow above startup. Record the flow and heating response with each fixture alone and with both open; that supports a flow-related branch without identifying the restriction or sensor at fault. For the scoped models, Anvilfield's arithmetic places 0.45 GPM between ATI-540H continuation and startup, and 0.30 GPM between IKONIC extinction and activation.

Table 3. Activation-flow comparison
Exact scopeStarting/minimum flowContinuing/extinction flowCondition / exceptionField interpretationSource
Navien NPE-180S20.5 GPM / 1.9 L/min listed minimumSeparate continuation value not specifiedStandard NPE-S2; no A2 optionCompare published minimum with observed heatingS2 p. 7; S3 p. 16
Navien NPE-180A20.5 GPM family minimum; less than 0.01 GPM / 0.04 L/min option for A2Not specified hereOptional ComfortFlow; stored heat/controls; increased energy useConfigured delivery performance; distinct from burner startupS2 pp. 7, 27; S4; S10
Rheem RTGH-S11i / RTGH-SR11i0.4 GPM0.26 GPM extinctionAP23209 Rev 03 scopeCompare startup and running complaints separatelyS5 p. 7
A. O. Smith ATI-540H-N0.5 GPM / 1.9 L/min0.4 GPM / 1.5 L/min continuous firingActivation value at default set temperatureBelow startup does not necessarily mean below continuationS8 p. 46; S9 p. 2

How do you measure flow and separate it from mixing?

Divide collected gallons by collection seconds and multiply by 60 to obtain gallons per minute. Use a marked container and a timer, keep the draw steady, and repeat the collection before comparing a near-threshold result. Mark the test mixed or hot-only and note other open fixtures, because total fixture discharge and heater flow answer different questions. A single-handle fixture set toward hot can still have a temperature limiter or mixing path; verify its arrangement before treating its entire discharge as heater flow.

For ATI-540H, the normal INFO display cycles through inlet temperature, outlet temperature and flow in that order, according to 2000534710 Rev. C, p. 48. Record the three readings during the same steady draw. Reconcile mixing, other taps, recirculation and instrument resolution before interpreting disagreement with a bucket test as a flow-sensor failure.

Worked example: a low-flow draw at an ATI-540H

Use a selected mixed draw of 0.70 GPM at 105°F, supplied by 60°F cold water. Compare heater outlet conditions of 140°F and 120°F; the first is a configured calculation case, and the second is the factory default in the ATI-540H guide. The building's approved temperature target and scald protection govern any actual setting change.

Multiply mixed flow by the fraction of the temperature rise supplied by hot water. The mixing equation is Qhot = Qmixed × (Tmixed − Tcold) / (Thot − Tcold).

Anvilfield estimates the hot-side demand needed to deliver 0.70 GPM at 105°F as 0.39 GPM with a 140°F source and 0.53 GPM with a 120°F source. Compared with the published flow values, the first nominal demand is below startup and just below continuation; the second exceeds startup. Use the calculated demand to choose the next measurement, then confirm actual flow and burner response at the installed setting.

Collection uncertainty matters near the boundary. With a selected volume uncertainty of ±0.01 gallon on the 30-second collection, mixed flow spans 0.68 to 0.72 GPM. Holding temperatures fixed, Anvilfield estimates hot-side demand of 0.38 to 0.41 GPM at 140°F, crossing the continuation boundary, versus 0.51 to 0.54 GPM at 120°F. Record thermometer resolution and repeated readings on the actual job as well.

Method: Anvilfield estimates use the selected flow and temperature inputs, a steady mixing balance, equal water heat capacity, negligible pipe losses and no recirculation or crossover contribution. Operating references are A. O. Smith 2000534710 Rev. C, pp. 46-48 and 64, and AOSRG46835, April 2023, p. 2, checked November 5, 2026. Calculations retain full precision and display flows to two decimals; compare predicted demand with actual controller flow and outlet temperature. A technician controls any setting change, verifies scald protection and preserves the facility's water-management temperatures.

Table 4. Worked inputs and results, Anvilfield estimates
Input / result140°F outlet case120°F outlet caseSource / calculation
Cold supply60°F60°FPublished inlet curve value, S8 p. 64
Mixed fixture target105°F105°FSelected calculation input
Mixed fixture flow0.70 GPM0.70 GPMSelected calculation input
Collection over 30 seconds0.35 gal0.35 gal0.70 × 30 / 60
Hot fraction56.25%75%Temperature mixing balance
Calculated hot-side demand0.39 GPM0.53 GPM0.70 × hot fraction
Demand range with selected ±0.01 gal collection uncertainty0.38 to 0.41 GPM0.51 to 0.54 GPM0.68 to 0.72 GPM mixed flow; temperatures fixed
Against ATI-540H startupBelow 0.5 GPMAbove 0.5 GPMS8 p. 46
Against ATI-540H continuous firingNominally below; uncertainty spans 0.4 GPMAbove 0.4 GPMS8 p. 46; collection sensitivity above
Published maximum at 60°F inlet / 120°F outletNot used for this outlet setting6.3 GPMS8 p. 64, 540 chart
Diagnostic priorityVerify actual hot-side draw and mixingIf still cold, continue beyond low-flow branchAnvilfield interpretation

Which Navien codes apply to NPE-2?

The NPE-2 User's Information Manual, Version 1.0, 2020, pp. 16-18, assigns E003 to ignition failure, E012 to flame loss, E110 to abnormal air pressure and E439 to abnormal flow-sensor operation. The Navien user manual gives the complete list and basic response.

Read each code as a detected condition. E003 directs ignition and supply diagnosis; it does not establish that an igniter needs replacement. E012 requires the sequence showing whether heat started before flame was lost. E110 directs the air and vent branch, whose installation limits come from the actual vent configuration.

For cold-water complaints, the user troubleshooting path includes through-heater draw, the inlet filter, displayed errors and the return check valve where external recirculation exists. When the findings lead to fuel delivery, use the exact manual limits with gas supply and piping sizing.

Why is the A2 exception separate?

Navien's January 2026 installation manual describes A2 recirculation advantages including lower minimum delivery flow and cold-sandwich control. Its specification sheet conditions the low-flow option on ComfortFlow and notes increased energy use with recirculation. Record whether that configuration is installed and enabled before applying its delivery claims; an NPE-180S2 cannot inherit them from the family name.

Which Rheem codes apply to IKONIC?

Rheem AP23209 Rev 03 identifies A011 as failure to detect flame and A012 as flame loss after ignition. Record whether heat ever began, how long it lasted and which other gas appliances operated during the event.

A029 directs the condensate-trap and drainage branch: AP23209 Rev 03, p. 45, describes a full trap or failure to detect its water level. The service path includes drainage, connections and sensing, so the code alone does not prove a blocked drain. A090 identifies detected venting blockage and leads the technician through vent, air-filter and inlet-pressure checks. Observers retain visible routing, leakage, exterior obstruction and weather conditions; drain disassembly and combustion work remain service tasks. The IKONIC technical manual, pp. 45 and 60, governs those paths.

Rheem IKONIC T111 is a maintenance reminder under AP23209 Rev 03, p. 64, while A. O. Smith 111 is an ignition-failure code under 2000534710 Rev. C. Rheem calls for draining and flushing and warns of eventual protective shutdown; complete that service before clearing T111.

AP23209 Rev 03 sets the service alert at 500 combustion hours by default, offers 750- and 1,000-hour selections, and discourages changing the default. Combustion hours accumulate during firing; they are not calendar years or a universal descaling interval. Record service hours and the prior maintenance date together.

With no code and no heat, technical-manual p. 37 begins with demand, enabled state, low or absent flow, inlet debris and sensing. Establish those conditions before selecting a repair. Keep codes from other Rheem generations, including bare 11, 12 or P1, tied to those generations' manuals.

Which A. O. Smith codes apply to ATI-540H?

The ATI-540H troubleshooting list in 2000534710 Rev. C assigns 111 to ignition failure, 121 to loss of flame and 991 to imperfect combustion. For 991, stop repeated firing trials and arrange the gas, air, vent and combustion service branch.

A. O. Smith's 2000534710 Rev. C assigns code 311 to the heat-exchanger thermistor on the 540 model but to the outlet thermistor on 240 and 340 models. The same guide assigns 331 to the 540 outlet thermistor. Its 441 flow-sensor and 651 flow-adjustment entries carry an Easy-Link-system-only qualifier, so a single-unit flow complaint does not justify assigning either code.

Can warm incoming water explain no ignition?

A. O. Smith 2000534710 Rev. C says the heater will not activate when incoming water is too close to the set temperature; its no-ignition checklist gives no numerical temperature difference for that condition. Record inlet, outlet and setpoint together, especially with preheated supply or a return loop. If inlet and outlet are already near target but the fixture stays cold, compare the distribution path and mixing arrangement.

The same no-ignition checks include low flow, a dirty inlet filter, reversed connections and cross-plumbing. A complaint beginning immediately after installation or plumbing work warrants a connection and configuration review before part replacement. The following selected matrix retains the model qualifiers from the three linked model manuals. Each code identifies a diagnostic branch, not a part to order; use its linked manual for the complete fault list and test sequence.

Table 5. Fault-code applicability matrix
Exact displayApplies in this article toDocument and printed locationDetected condition / listed meaningRecord / service branch
E003Navien NPE-2 user-manual scopeS3 p. 17, v1.0, 2020Ignition failureDemand/supply state; ignition diagnosis
E012Navien NPE-2 user-manual scopeS3 p. 17Flame lossWhether heat started before failure; supply/air/flame-proving diagnosis
E110Navien NPE-2 user-manual scopeS3 p. 17Abnormal air pressureExterior vent condition and weather; air/vent diagnosis
E439Navien NPE-2 user-manual scopeS3 p. 17Abnormal flow-sensor operationController flow and fixture draw; flow-sensing service
A011Rheem IKONIC RTGH-S11i / SR11iS5 pp. 38-39, AP23209 Rev 03Flame not detectedStartup/alarm; gas/ignition/flame service
A012Rheem IKONIC RTGH-S11i / SR11iS5 pp. 41-42Flame lost after detectionTime to loss; other appliances; supply/flame service
A029Rheem IKONIC RTGH-S11i / SR11iS5 p. 45; S6 p. 93Condensate trap full or water level not detectedVisible routing/leakage; trap, drainage and sensing service
A090Rheem IKONIC RTGH-S11i / SR11iS5 p. 60; S6 p. 93Detected venting blockageExterior obstruction and weather; vent/filter/dynamic-pressure checks
T111Rheem IKONIC RTGH-S11i / SR11iS5 p. 64Maintenance reminder; eventual shutdownService hours and maintenance record; maintenance branch
111A. O. Smith ATI-540HS8 p. 55, Rev. CIgnition failureStartup/ignition observations; gas/ignition diagnosis
121A. O. Smith ATI-540HS8 p. 55Loss of flameWhether burner started; flame/supply diagnosis
311A. O. Smith 540, within ATI-540H scopeS8 p. 55Heat-exchanger thermistor, 540Thermistor checks; 240/340 meaning differs
331A. O. Smith 540 onlyS8 p. 56Outlet thermistor failureInlet/outlet readings and code; sensor service
441A. O. Smith Easy-Link installation in cited revisionS8 p. 56Flow-sensor failure, Easy-Link qualifierParent/child identity; linked-system sensing
991A. O. Smith ATI-540HS8 p. 56Imperfect combustionStop firing trials; gas/air/vent/combustion service

Is it a cold-water sandwich, crossover or recirculation fault?

A restart sandwich is hot-cool-hot delivery after a stopped draw resumes: warm water remains downstream, cooler water passes during restart, then heated water arrives. An initial wait while a cooled pipe clears is a different sequence. Repeated cold interruptions during an uninterrupted draw require simultaneous heater-flow, heating-state and fault observations.

Navien describes the A2 buffer and pump arrangement as its response to cold-water sandwich and delivery delay in the condensing tankless practical guide.

A hot heater outlet with a cold fixture directs attention to distribution and mixing. A failed cartridge can admit cold water downstream, while a return check-valve problem can change the flow path. Compare near-heater outlet, affected fixture and return temperature under the same draw condition, then use mixing-valve and scald-control diagnosis.

Which return arrangement is installed?

Identify whether the recirculation loop uses a dedicated return or an intentional thermostatic crossover that returns water through the cold line. The crossover's intended function differs from leakage through a defective mixer; temperature alone cannot identify the failed device. Record a piping sketch and follow recirculation return, balancing and controls for the design questions.

Check the recirculation schedule and demand-control state against the complaint time. A pump that is intentionally off and a failed pump can leave the same cooled branch; record the commanded state before assigning a hardware fault.

An active uncirculated fixture branch explains a delivery wait. An unused or abandoned dead leg creates a separate stagnant-branch issue.

Anvilfield's crossover test interpretation requires a technician to account for returns, crossover devices, multiple heaters and residual pipe pressure before interpreting hot-side flow with the heater's cold supply isolated. Short residual drainage differs from a sustained alternative supply path. Save valve positions and the piping sketch with the result so another technician can reconstruct the test.

Why do winter weather and large draws change the answer?

A. O. Smith's 540 output chart in 2000534710 Rev. C, p. 64, gives 4.7 GPM at 40°F inlet and 120°F outlet, and 6.3 GPM at 60°F inlet and 120°F outlet. These chart values assume a properly sized gas line. The corresponding temperature rises are 80°F and 60°F. Colder incoming water therefore reduces available flow at the same delivery target; use the actual inlet temperature to size hot-water capacity at the required temperature rise.

Record the simultaneous fixture load, outlet target and altitude configuration before calling a unit undersized. A heater that starts reliably at a small draw but loses delivery under a large draw needs an output and supply comparison.

Natural-gas inlet pressure is 3.5 to 10.5 in. WC under Navien NPE-2 Installation Manual v2.0, January 2026, versus 4.0 to 10.5 in. WC under Rheem IKONIC AP23209 Rev 03 and A. O. Smith ATI-540H 2000534710 Rev. C.

Propane inlet pressure is 8.0 to 13.0 in. WC under Navien NPE-2 Installation Manual v2.0, January 2026, and Rheem IKONIC AP23209 Rev 03, versus 8.0 to 14.0 in. WC for the factory-propane models covered by A. O. Smith 2000534710 Rev. C, p. 29. The ATI-540H-N in this comparison is natural gas; that manual warns against converting it to propane. A qualified technician measures static and loaded inlet pressure at the heater with simultaneous gas loads recorded, using the installed fuel's limits rather than manifold-pressure values.

A. O. Smith 2000534710 Rev. C, p. 50, requires electrical power for freeze protection and limits that protection to internal heater piping. Navien NPE-2 User's Information Manual v1.0, p. 15, also requires electrical supply and identifies gas supply as additional freeze protection for A2 models. Record an outage or exposed piping and follow external-pipe freeze protection; suspected freezing or leakage ends firing trials. Follow the model's thawing and leak-inspection instructions before restoring operation.

When do maintenance and resets belong in diagnosis?

Navien's NPE-2 user's manual calls for annual intake and vent inspection; A. O. Smith 2000534710 Rev. C recommends an annual qualified check and annual vent and burner inspection. Rheem AP22745 Rev 04 calls for flushing annually or as professionally recommended, with water conditions and average usage driving frequency.

Record hardness, inlet-filter condition, prior flushing, usage and any service-hour reminder. Debris or scale becomes a supported service finding when inspection and operating evidence point to it. A cold fixture, interrupted electrical supply or insufficient hot-side demand needs its own diagnostic path even when maintenance is overdue.

Keep the cleaning procedure in water heater maintenance and tankless descaling and the supply-water response in water treatment and hardness control.

Photograph and transcribe the code before resetting. Navien's user's manual provides a Back-button reset for minor issues, while recurring faults continue through the relevant diagnostic path. Use only the installed model's documented reset when no stop condition exists; clearing an IKONIC T111 reminder follows its prescribed maintenance. Save previous reset history because an intermittent fault that disappears during the visit still needs a defined next test.

What should the service quote include?

Separate diagnosis, repair authorization and verification in the service quote. List travel, parts, indicated descaling, vent or condensate corrections, gas-piping work and permits as distinct scope items. Access, intermittent operation, parts availability and the required outage window determine the restoration schedule.

Confirm exact part applicability and manufacturer claim authorization before applying warranty credit. Navien's January 2026 Installation Manual, final service page, requires technical-support preauthorization for repairs; preserve the claim reference with the work order.

How do you write a public-facility scope?

A public-facility scope should identify every heater model, the outage window, the diagnostic tests and the records required at closeout. Estimators building a public-facility water-heater service pipeline find agency plumbing bids and past awards through PorchRocket Bid Control. Include access arrangements and temporary hot-water requirements in the work package.

Use equipment counts and plumbing takeoff to organize assets and tasks, and the service labor and dispatch framework to separate diagnosis from approved repairs.

Table 6. Service scope and release evidence
Work stageInclude in scopeEvidence before advancing
DiagnosisReproduce complaint; record model, flow, temperatures and codesFinding tied to the installed manual, or a defined next test
Repair authorizationExact part or correction; access; required outage; warranty referenceWritten approval for the identified work
Return to serviceRepeat original fixture, restart and simultaneous-load conditionsRecorded delivery target met, safety checks completed and remaining faults disclosed

Does no hot water mean the heater needs replacement?

Repair a confirmed fault when the unit can meet operating requirements and the applicable part is available. Compare replacement scope when a failed heat exchanger, unavailable parts or unresolved capacity requirements drive the decision. A discontinued support listing alone does not establish that a serviceable heater needs replacement; flooded equipment follows the manufacturer's replacement or inspection instructions.

Keep intermittent diagnosis and repair authorization separate. When delivery remains unresolved, record the temporary hot-water arrangement, next test, responsible party and return date.

What should you record before handing the job over?

Record identity, symptom sequence, observations, units and disposition before the evidence changes. Stop conditions end observation; below-threshold draw enters the flow branch; adequate confirmed flow without heat enters model diagnostics; a hot outlet with a cold fixture enters distribution and mixing diagnosis.

Safe observation checklist

  • ☐ Stop for gas odor or a CO alarm; make calls and record observations after reaching safety.
  • ☐ Photograph the complete model, series, serial, fuel or conversion label and literal display code; preserve every prefix and suffix.
  • ☐ Record one-fixture versus building-wide failure and whether it occurs at startup, during continuous use, after restart or with simultaneous demand.
  • ☐ Capture accessible enabled state, heating indicator, safe fixture temperature, collection volume and duration; identify mixed versus hot-only flow and other open taps.
  • ☐ Note outage, freeze exposure, visible vent or condensate conditions, maintenance history and return configuration; hand over without opening the cabinet or clearing evidence.

Technician handoff record

Blank operating readings mean “not measured,” never zero. Attach the governing manual revision and printed page, instrument resolution, repeated readings and before/after test conditions.

Table 7. Copyable handoff record
FieldEntryUse
Site and assetBuilding, room, asset ID, date/timeIdentify equipment
IdentityManufacturer; full model; series; serial; fuel; conversion labelSelect correct instructions
ManualDocument number, revision, URL, printed pagePreserve provenance
InstallationIndoor/outdoor; elevation setting; single/cascade; return/crossover sketchPreserve applicability
ComplaintStartup / continuous / restart / simultaneous use; affected fixturesReproduce the failure
Literal codeFor example, T111, not 111; photographAvoid cross-brand mistranslation
Display and heating statePowered/enabled; flow display; flame on/off; event timingDistinguish demand from firing
Flow methodGallons/seconds; mixed/hot-only; controller flow; resolution/repeatsJudge flow margin
TemperaturesCold inlet, heater outlet, affected fixture, return if present; °FCompare rise and distribution
Technician supply readingsStatic/dynamic gas pressure in in. WC; water pressure; electrical supply; test stateTest supply against model limits
Conditions/historyOutage, freeze, visible blockage/leak, hardness, filter/flush date, service hoursIdentify trigger and maintenance branch
Work and authorizationTests; finding; part; manufacturer claim; authorizationMake repair traceable
CloseoutTarget; original draw/restart/load repeated; flow/temperature; heating state; code; disposition; next action/dateVerify service or define remaining fault

Anvilfield's closeout method repeats the complaint-producing draw and comparison fixture with flow, temperatures, heating state and code status recorded. Repeat stop/restart timing for a sandwich complaint and the recorded simultaneous load for a high-demand complaint. Accept the work when delivery meets the recorded job target throughout that sequence; write down any departure and the next action.

A vanished error message alone does not establish restored delivery. An unresolved intermittent fault needs its remaining test, responsible party and next service date in the handoff, so the next visit begins with evidence rather than another reset.

Review and citation

Reviewed by Anvilfield on November 5, 2026. Update record, 2026-11-05: Rechecked the twelve primary sources; clarified flooded-heater disposition, fuel applicability and condensate fault interpretation; added service-scope evidence and measurement checks.

When citing a comparison, include its evidence-unit fragment and governing manual revision.

How to cite this page: Anvilfield, No hot water from a tankless heater? Navien, Rheem and A. O. Smith checks, 2026, https://anvilfield.com/field-guides/plumbing/tankless-water-heater-no-hot-water-model-matrix/

Related tools

Next step: Find plumbing service bids

FAQ

Why is my tankless water heater running but not heating?

A powered display does not prove heating; compare actual through-heater flow, heating state and the exact model's fault code.

What is the minimum flow for a Navien NPE-180S2?

Navien's January 2026 NPE-2 Installation Manual lists 0.5 GPM for the S2; the A2 low-flow option is separate.

What is the minimum activation flow for Rheem IKONIC?

AP23209 Rev 03 gives 0.4 GPM activation and 0.26 GPM extinction for RTGH-S11i and RTGH-SR11i.

What flow starts an A. O. Smith ATI-540H?

Its Rev. C Owner's Guide specifies 0.5 GPM at the default temperature to start and 0.4 GPM to continue firing.

Does a 111 code mean the same thing on every tankless heater?

A. O. Smith ATI-540H code 111 means ignition failure; Rheem IKONIC T111 is a maintenance reminder. Preserve the prefix and model.

Why does my tankless heater work only when two taps are open?

The combined hot-side draw can cross the model's startup threshold; confirm heater flow before selecting a repair.

Why does my tankless shower go hot, cold and hot again?

A restart sandwich differs from a continuous-draw dropout; record when the interruption occurs and what the heater does at that moment.

Will descaling fix no hot water?

Descaling addresses scale where indicated; low activation flow, interrupted power, fuel faults and cross connections require their own diagnostic paths.

Does a gas tankless water heater work during a power outage?

The scoped gas models need electricity; ATI-540H 2000534710 Rev. C specifies 120 VAC, 60 Hz in its no-hot-water checks.

Why is my tankless heater fan running after the tap closes?

A. O. Smith 2000534710 Rev. C, p. 52, describes 15 to 70 seconds of fan operation after the draw stops for exhaust purging and readiness to reignite. Fan noise alone does not prove that the burner is heating water.

Why is only one shower cold when other taps get hot?

Compare heater flow and outlet temperature during that shower's draw; low hot-side demand, a restriction or a mixing-valve fault can affect one fixture while another works.

Should I reset a tankless water heater with no hot water?

Save the exact code and symptom first, then use only that model's documented reset when no stop condition exists; a recurring fault requires its diagnostic branch, and an IKONIC T111 reminder calls for the prescribed service before clearing.

People also ask

Sources checked