ANVILFIELD Try FieldOS

Concrete

How to monitor concrete crack movement using ACI guidance

Select crack gauges, log temperature and loading, and turn a movement time series into a documented repair decision.

Concrete crack monitoringACI guidanceCrack gaugesEpoxy injectionConcrete repair

Direct answer

Monitor concrete crack movement by mapping the crack, fixing a displacement gauge across sound concrete, and recording changes alongside concrete temperature, moisture and loading. ACI RAP-1, reapproved 2009, calls for the damage cause to be assessed and corrected before epoxy repair and identifies later movement as a reason epoxy may be unsuitable. Use a gauge that resolves the movement relevant to the repair, observe the temperature and load cycles that drive it, and document the release decision before injection.

On this pageHow does ACI guidance turn crack observations into a repair decision?Is the crack active, dormant, cyclic or progressively widening?Which crack monitor resolves the movement you need to measure?Where should gauges go on the location plan?How do you install, zero and check the monitor?How often and how long should crack movement be monitored?What temperature, moisture and loading should you log?How do you distinguish thermal cycling from a continuing trend?Worked calculation: converting GEOKON readings to movementWhat evidence releases a crack for epoxy injection or a flexible repair?How much does crack monitoring cost, and what is included?What should be monitored after repair?Field checklist and handover record
Need to run this in the field?

Open the related tool for the calculation, checklist, or packet.

How does ACI guidance turn crack observations into a repair decision?

Monitor concrete crack movement by mapping the crack, fixing a displacement gauge across sound concrete, and recording changes alongside concrete temperature, moisture and loading. ACI RAP-1, reapproved 2009, calls for the damage cause to be assessed and corrected before epoxy repair and identifies later movement as a reason epoxy may be unsuitable. Use a gauge that resolves the movement relevant to the repair, observe the temperature and load cycles that drive it, and document the release decision before injection.

Start by naming the repair objective: structural rebonding, water exclusion, edge support or appearance. The concrete guide hub connects the investigation to the relevant repair system.

ACI 224.1R-07, published March 2007, provides the evaluation and repair framework. ACI RAP-1, Structural Crack Repair by Epoxy Injection, 2003, reapproved 2009, supplies the specific public guidance used here for epoxy selection. These publications guide the investigation; the project identifies separately its specifications, adopted requirements and structural design acceptance.

ACI 364.9T-03(11), Cracks in a Repair, addresses repair-cracking consequences. The 2021 ACI PRC-364.9-21 publisher description addresses cause evaluation and cracking mitigation in repair design.

Width and photographs establish condition; a time series establishes behavior before repair selection. Use the epoxy and polyurethane injection guide for execution after this investigation establishes the repair basis.

Is the crack active, dormant, cyclic or progressively widening?

An active crack exhibits repeatable opening, closing, shear, out-of-plane displacement or continuing change beyond the installed system's uncertainty. A dormant classification belongs to a stated observation period, resolution and set of service cycles. Record “no detectable movement over the stated envelope” rather than predicting permanent dormancy. Reclamation's Guide to Concrete Repair, second edition, 2015, distinguishes daily or seasonal cycling from progressive widening and ties repair selection to that behavior.

Retain both peak-to-peak excursion and net change. A crack that opens and closes back to its initial reading remains active throughout that excursion. Cyclic movement can be expected at a designed joint while still defeating a proposed rigid repair.

Crack width is the actual surface gap at a marked point; gauge displacement is the change between mounting points. Zeroing a gauge across a 1.20 mm crack does not make its width zero. Exposure-based crack-width guidance cannot be used as an allowable movement threshold, and a small gauge reading does not establish member capacity.

New distortion, offset or load-related change requires prompt structural assessment. ACI 546R-14, section 1.2.1.1, calls for immediate safety issues to be reported to the owner, access restricted around loose overhead or vertical concrete, and compromised members stabilized or affected areas removed from service. Activate the project response without waiting for more routine gauge readings.

Which competing causes should the record distinguish?

Compare timing with physical evidence. Reversible opening linked to concrete temperature suggests a thermal component; rainfall or groundwater changes accompanied by survey movement point toward a different investigation. Traffic-linked displacement, corrosion staining with delamination, and progressive map cracking each require their own corroborating observations. FHWA-HRT-04-150, Chapter 4, July 2006, explains why surface patterns must be interpreted with material and deterioration evidence.

Use the crack types and causes guide for the broader diagnosis, including drying shrinkage. Investigate gradients with the slab curling guide, corrosion with the spall repair guide, and continuing foundation displacement with the underpinning guide. Compare restraint locations with the joint layout. Movement records support those diagnoses without independently identifying internal damage.

Which crack monitor resolves the movement you need to measure?

Select the instrument against the smallest movement that changes the repair decision. Resolution is the readable increment; accuracy describes agreement with the reference; repeatability describes consistency on repeated readings. Range, calibration and mounting stability also affect the result.

Table A. Gauge resolution and decision capability
Method / modelWhat it measuresPublished readable increment or resolutionAccuracy / operating conditionGood use and limitSource
Avongard visual Tell-TaleRelative movement across installed plates1 mm graduations; 0.5 mm interpolationFAQ supplies reading resolution, not a field accuracy certificateCoarse opening/shear trend; cannot clear a 0.10 mm triggerAvongard FAQ, current undated FAQ checked 2026-11-05
Avongard discs or Plus spigots with calipersChange in datum separation0.1 mm resolutionRepeatability depends on technique; datum and temperature effects remainManual trend screening; select a finer validated system for a 0.10 mm release decisionAvongard FAQ
GEOKON 4420, 25 mm rangeAnchor-to-anchor extension0.025% FS; calculated about 0.006 mmManual: 0.5% FS linear, 0.1% FS polynomial; calculated magnitudes 0.125 and 0.025 mmFine logged movement; verify calibration and full-system uncertaintyGEOKON specifications/GEOKON X.6, April 2026
GEOKON 4420, 50 mm rangeAnchor-to-anchor extension0.025% FS; calculated about 0.013 mmManual: calculated 0.25 mm linear, 0.05 mm polynomial accuracy magnitudesLonger travel; its fine resolution alone does not ensure a 0.10 mm decisionGEOKON specifications/GEOKON X.6
Elcometer 900, illuminated ×50 microscopeSurface crack width at marked point×50 magnification; establish the readable increment for the projectDo not infer resolution from magnificationWidth baseline and repeat photos, not continuous anchor displacementElcometer USA, current US sales page
Brittle patchWhether the patch breaksBinary indication; no verified displacement incrementPatch bond and disturbance affect interpretationSupplement only; cannot quantify excursion, direction or rateCMHA maintenance, masonry scope

FS means full scale. A microscope reads surface width at a mark; a transducer reads displacement between anchors. The anchor span includes concrete strain as well as the crack, so preserve span and orientation. Use separate axes for opening, shear or out-of-plane displacement. A sound-concrete control helps investigate mounting drift or local strain, but it also moves thermally: subtracting it automatically can remove real behavior.

Photographs record location, crack-tip extension and deterioration. Reclamation 2015 describes photogrammetric monitoring; quantitative images need a scale in the crack plane, repeatable viewpoint and lighting, and validated processing resolution.

What do the manufacturer documents disagree about?

GEOKON's current Model 4420 web specifications list ±0.1% full-scale laboratory accuracy. Manual X.6, April 13, 2026, Appendix A, conditions that accuracy on polynomial calculation and gives the different linear accuracy shown in Table A. Use the serial-number calibration and correct calculation mode, then verify field repeatability and change uncertainty.

Where should gauges go on the location plan?

Put stations where they test different movement mechanisms: a representative maximum opening, a branch or tip, a relevant support region, opposite faces and contrasting sun exposure. A single opening gauge cannot resolve rotation, shear and differential vertical movement. Select additional axes or survey datums to match those questions; settlement reference points belong outside the suspected moving zone.

The following Anvilfield station-layout estimate uses one 3 m wall crack C1 and an adjacent control; crack length and effective thermal length are independent inputs. Plan origin is wall grid A/1; chainage begins at the lower visible tip. Record member, grid, face, gauge ID, photo direction, actual anchor coordinates and spacing, and the separate width-measurement mark.

Table B. Filled location plan proposal
StationMember / face and locationGeometry / signInstrumentReason / linked record
M1Wall W1, exterior south; C1 at 0.50 m chainageAcross crack; positive X = openingCaliper datum pairLower segment; photo C1-M1
M2W1, south; C1 at 1.50 mAcross crack; positive X = opening25 mm 4420 with polynomial calibration and field-verified change uncertaintyMain temperature series; photo C1-M2
M3W1, south; C1 at 2.50 mAcross crack; X opening, Y upward on right plateTwo-axis visual Tell-TaleRotation/shear screening; photo C1-M3
M4W1, interior north; opposite M2Across crack; X openingCaliper datum pairOpposite-face comparison; photo C1-M4
M5W1, exterior; upper tip at 3.00 mDated tip mark and scaled imageWidth microscope / photoCrack extension record; photo C1-M5
R1W1, south; intact area 1 m left of M2Same anchor span and orientation as M2Matched 25 mm electronic crackmeterMounting/temperature control; photo W1-R1

This wall has six observation stations, including a tip record and a control. M1, M3 and M4 screen movement; upgrade any station used to decide a 0.10 mm criterion to adequate measurement capability. M2 alone cannot release the whole crack.

In a garage, place the plan within the larger parking structure condition survey and phased restoration scope. Access restrictions and closures determine whether a proposed station can actually be read at the required times.

How do you install, zero and check the monitor?

Mount to sound concrete, not loose paint, plaster or delaminated cover. Follow the selected manufacturer's fixing and adhesive arrangement. Avongard's current FAQ requires adhesive to cure before preset pegs are removed. Before drilling, locate reinforcement, tendons and services, and have the repair designer approve fixing locations and depths. FHWA-HRT-13-028, October 2013, Chapter 6, documents GPR location of internal bridge tendons and warns against relying on as-built drawings alone. Mark drilling restrictions on the station plan.

Record actual crack width separately from initial gauge coordinates. Avongard's Plus Tell-Tale record sheet provides signed movement and station-reference fields. Keep raw X and Y readings even when they are not zero, and mark which direction means opening. Photograph the complete station and a readable close-up, including the gauge ID and sign convention.

Anvilfield's manual field check uses three remove-and-reseat readings per visit, retaining all three. Compare their spread with the repeatability allowance established during setup. Published 0.1 mm caliper resolution does not support a 0.05 mm repeatability claim or reliably clear a 0.10 mm release decision by itself; select a finer verified system where that decision matters.

Define the uncertainty of a change between visits, including both readings, calibration, seating, thermal correction and mounting stability. Recheck a sound reference and a known length where the equipment permits; investigate a changed reference instead of averaging it away.

A bumped or debonded gauge invalidates its affected readings. Preserve the last valid datum, document the disturbance and establish a dated replacement baseline. Link old and new series only with an independent transfer measurement; otherwise show the break.

How often and how long should crack movement be monitored?

Anvilfield estimates a 5 to 9 week initial program for a stable, accessible, non-emergency investigation: morning and afternoon for 7 days, including the baseline, then weekly for 4 to 8 weeks. This gives 18 to 22 reading rounds.

Table C. Proposed reading intervals and coverage
InvestigationInitial cadenceContinuing cadence / durationWhat changes the planAuthority
Stable accessible crack, daily thermal questionMorning and afternoon for 7 days; first reading is baselineWeekly for 4 to 8 weeks; 18 to 22 total roundsAdd event readings; extend for untested temperature/load conditionsAnvilfield field recommendation, 2026; Reclamation 2015/Avongard FAQ support cycle-based diagnosis
Exposed member with seasonal questionInitial daily-cycle sequenceMonthly after initial investigation; plan 6 to 12 months through relevant extremesMissing hot/cold or wet/dry extreme extends coverageAnvilfield planning recommendation; Reclamation 2015/Avongard FAQ
Logged thermal response15-minute logging plus installation inspectionThrough relevant daily and service cyclesEvent-rated sensor/readout for rapid loads; verify missing dataAnvilfield sampling proposal, instrument capability GEOKON specifications/GEOKON X.6
Growing crack, new offset or structural distressImmediate project responseStructural design sets response and monitoringProtection/intervention takes priority over a long baselineACI 546R-14 §1.2.1.1; project-specific structural response
Post-repairAfter specified cure and service release7 days, 30 days, first relevant event and seasonal extremeNew movement, leakage or adjacent crack returns to diagnosisAnvilfield follow-up recommendation; ACI RAP-1/Reclamation 2015/Avongard FAQ

These are Anvilfield planning intervals, not ACI minimum durations. Reclamation 2015 supports extended observation to distinguish daily and seasonal cycles from progression; Avongard recommends relating movement to external factors. Include occupied and unoccupied loading, relevant wet weather or groundwater change, and the hot and cold conditions that govern an exposed member.

The seasonal allowance in Table C extends until relevant extremes are covered. Earlier intervention requires a documented design decision and monitoring around stabilization or a movement-accommodating repair. For a brief vehicle passage, validate the sensor and acquisition response against the event duration; the thermal logging interval in Table C can miss it entirely.

What temperature, moisture and loading should you log?

Record concrete temperature at the gauge with every displacement reading. Avongard's current FAQ recommends simultaneous construction-material temperature measurements, especially at high resolution. Use the same marked surface and thermometer technique; shaded air temperature cannot represent a sunlit concrete face reliably.

This log supplies Anvilfield estimate inputs for Table E, using fixed UTC-05:00 times, unchanged loading and dry surfaces. Field logs retain raw instrument readings and actual time zones through daylight-saving changes.

Table D. Filled environmental log
Elapsed day / timeStationConcrete °CAir °CSurface / prior 24 h rainLoad stateStation conditionInput provenance
0 / 07:00M2108Dry / 0 mmUnchangedAssumed intactAnvilfield estimate input
0 / 15:00M23024Dry / 0 mmUnchangedAssumed intactSame
7 / 07:00M2108Dry / 0 mmUnchangedAssumed intactSame
7 / 15:00M23024Dry / 0 mmUnchangedAssumed intactSame
14 / 07:00M2108Dry / 0 mmUnchangedAssumed intactSame
14 / 15:00M23024Dry / 0 mmUnchangedAssumed intactSame

Add operator initials or role ID, units, sensor temperature when different from concrete temperature, reference checks and correction version. Retain duplicate readings. Mark missing and invalid values explicitly rather than interpolating through an event that controls the decision.

GEOKON manual X.6, section 6.3, identifies rainfall, traffic, excavation, seasonal changes and nearby construction among relevant influences. For a leaking wall, use the below-grade waterproofing guide to connect groundwater and drainage observations with water-control scope.

How do you distinguish thermal cycling from a continuing trend?

Plot opening and concrete temperature against time on aligned axes, then plot displacement against temperature. Compare readings at similar concrete temperatures and loading; heating and cooling paths can differ because of thermal lag, restraint and through-thickness gradients. The mass concrete thermal-control guide addresses early thermal cracking; the slab curling guide addresses gradient-driven slab behavior.

Using FHWA's approximate concrete thermal-expansion range of 8 to 12 microstrain/°C, Anvilfield estimates 0.48 to 0.72 mm of free movement for a 3 m effective length over a 20°C change. Microstrain here means micrometres of length change per metre per degree. Establish effective length and restraint before assigning that movement to a crack.

Anvilfield estimates Table E using a 3 m effective length normal to the crack, 10 microstrain/°C within FHWA's range, Table D temperatures and an imposed opening trend of 0.02 mm/day. All thermal expansion closes the crack at M2; loading stays constant. The assumed initial width of 1.20 mm keeps the crack open throughout.

Multiply effective length by thermal coefficient and temperature change to obtain the thermal component, then add elapsed days times the opening trend. The calculation uses exact elapsed hours divided by 24: displacement = −0.03 × (T − 10) + 0.02 × t, in mm, with T in °C and t in elapsed days from day 0 at 07:00. Afternoon points occur one-third day later; only displayed results are rounded.

Table E. Calculated crack movement time series
Day / timeConcrete °CThermal component mmImposed trend mmCalculated displacement mmCompared at same temperature
0 / 07:00100.000.000.00Baseline
0 / 15:0030−0.60+0.01−0.59Baseline warm state
7 / 07:00100.000.14+0.14+0.14 mm from day 0 cool state
7 / 15:0030−0.60+0.15−0.45+0.14 mm from day 0 warm state
14 / 07:00100.000.28+0.28+0.28 mm from day 0 cool state
14 / 15:0030−0.60+0.29−0.31+0.28 mm from day 0 warm state

The pure thermal component changes by 0.60 mm; concurrent opening makes the morning-to-afternoon change 0.59 mm. Maximum minus minimum across the sampled series is 0.87 mm. Matched-temperature morning readings reveal +0.28 mm over 14 days, or +0.02 mm/day, while using only the first and last readings yields −0.31 mm and conceals that progression.

Test a remaining trend against independent load or settlement evidence. Time and temperature can rise together and create a convincing scatterplot without separating their effects. Repeated heating and cooling cycles are more useful than an arbitrary correlation cutoff. Define how closely temperatures must match using the observed thermal sensitivity and temperature uncertainty; also match loading and heating or cooling phase. A fitted residual alone does not diagnose settlement.

Separate sensor correction from real concrete movement

Apply the sensor's calibration and any necessary instrument temperature correction before interpreting member behavior. GEOKON manual X.6, section 6.2.1, offers an optional correction for maximum accuracy or temperature changes greater than 10°C. Preserve raw and corrected columns and the formula version. Correcting instrumental thermal response leaves the concrete's physical thermal movement in the record and in the repair design.

Worked calculation: converting GEOKON readings to movement

GEOKON Model 4420 manual X.6, April 13, 2026, sections 6.1 to 6.2.1, publishes the following 50 mm instrument conversion inputs. Subtract the initial raw reading from the current reading and multiply by the calibration factor; calculate the optional sensor temperature correction and add it. The independently calculated linear result is 21.80 mm before correction and 22.19 mm after correction.

The method record below retains calibration precision. Field stations use their own calibration reports; label polynomial and thermal B constants separately.

Table F. Method record: published inputs and checked results
ItemFilled valueProvenance / calculation
Source / modelGEOKON 4420, 50 mm example; manual X.6, 2026-04-13GEOKON X.6 §§6.1.1, 6.1.2, 6.2.1
Initial / current raw readings4,200 / 6,000 digitsManufacturer's worked inputs
Linear calibration factor0.01211 mm/digitManufacturer's worked input; retain calibration precision
Initial / current sensor temperature20.3 / 32.9°CManufacturer's worked inputs
Temperature difference12.6°C32.9 − 20.3
Thermal constants M / B0.000376 / 0.328Manufacturer's 50 mm example coefficients
Uncorrected linear displacement21.80 mm(6,000 − 4,200) × 0.01211 = 21.798 mm
Sensor thermal coefficient K0.03129224 mm/°C((6,000 × 0.000376) + 0.328) × 0.01211
Sensor temperature correction+0.39 mmUnrounded K × 12.6°C = 0.394282224 mm
Corrected linear displacement22.19 mmSum unrounded displacement and correction
Polynomial A / B4.1548 × 10^-8 / 0.01173Manufacturer calibration example; preserve precision
Polynomial C, determined at baseline−49.99890672−(A × 4,200² + B × 4,200)
Polynomial displacement / corrected result21.88 / 22.27 mmA × 6,000² + B × 6,000 + C; then add unrounded sensor correction

For the linear calculation, D = G × (R1 − R0). For the polynomial calculation, D = A × R1² + B × R1 + C, with C set so the initial reading produces zero. The sensor correction is K × (T1 − T0), where K = ((R1 × M) + B) × G using the thermal constants. Add the unrounded correction to the chosen displacement result, then round for reporting.

What evidence releases a crack for epoxy injection or a flexible repair?

Release requires a repair objective, cause treatment or a movement-accommodating design, valid measurements through relevant cycles, acceptable product conditions and structural design acceptance where applicable.

Table G. Repair-release criteria
Evidence / conditionRelease or actionAuthority / numeric rule
Purpose documented as structural rebondingStructural repair design identifies cause treatment and acceptanceACI RAP-1, 2003/reapproved 2009; ACI PRC-364.9-21, 2021 TechNote
Movement observed through relevant cycles with adequate installed-system capabilityCompare excursion and remaining trend with the specified repair design criterionAnvilfield procedure; use the project repair-design criterion
Movement-magnitude interval wholly exceeds the assumed 0.10 mm project triggerHold rigid injection; resolve movement cause and repair detailAnvilfield example only, ±0.05 mm assumed change bound; Tables E and I
Movement-magnitude interval overlaps the trigger, or capability is unverifiedHold release; repeat, improve measurement or obtain a design dispositionAnvilfield evidence rule; a displayed value alone cannot clear the repair
Cracking caused by reinforcing-steel corrosionHold epoxy injection; address corrosion and damaged concrete in the repair scopeACI RAP-1, reapproved 2009, p. 4, excludes corrosion-caused cracks from epoxy injection
Cyclic movement despite zero end-to-end net changeAccommodate movement or correct cause before rigid bondingACI RAP-1/Reclamation 2015; net zero is not dormancy
Gauge debonded, disturbed or record has missing critical extremesRepair station/re-baseline traceably; continue required observationAvongard FAQ/GEOKON X.6 installation and records, Anvilfield release rule
Clean sound dry or damp substrate, no standing waterSikadur-35 Hi-Mod LV moisture condition permits proceeding if all other criteria passSika PDS 2021, July 2021 v01.02; this does not authorize injection under water pressure
Hydrostatic pressure at injectionDo not use this Sika product in that conditionSika PDS 2021, July 2021 v01.02
Substrate or ambient below 40°F (4°C)Do not apply this Sika product below its minimumSika PDS 2021, July 2021 v01.02
Crack wider than 1/4 in (6 mm)Do not inject with this product under its stated restriction; obtain a revised approved product/detailSika PDS 2021, July 2021 v01.02
Leaking moving crack, sealing objectiveSelect a movement-compatible water-sealing detail with product-specific service capabilityReclamation 2015; no generic polyurethane movement percentage
Structural crack also leakingDesign water control and structural repair as coordinated workACI RAP-1/Reclamation 2015; stopping leakage does not establish restored capacity

Anvilfield uses an assumed 0.10 mm project review trigger and an assumed ±0.05 mm bound on change for the fine-monitoring worked example. Field use must substantiate that bound through calibration and installation checks. It covers the installed system, not just sensor resolution, and expresses an engineering error allowance rather than a statistical confidence interval.

Preserve direction, but compare movement magnitude with the trigger. For magnitude bounds, subtract the change allowance from the absolute reading, stopping at zero, and add it for the upper bound. A range wholly above confirms exceedance; touching or crossing the trigger requires review. A wholly lower range clears only that observation, subject to coverage and design acceptance.

For example, +0.04 mm with a ±0.05 mm change allowance gives a magnitude range of 0 to 0.09 mm. The assumed 0.10 mm trigger is an Anvilfield review input, not an ACI movement limit, epoxy elongation allowance or safe crack width.

At day 7, +0.14 mm at matched temperature spans +0.09 to +0.19 mm and overlaps the trigger. At day 14, +0.28 mm spans +0.23 to +0.33 mm and confirms progression above it. The day-0 cyclic change already exceeds the trigger with the allowance applied, so rigid injection is on hold from that observation.

ACI RAP-1, reapproved 2009, identifies epoxy injection for cracks 0.002 in (0.05 mm) and wider while warning that subsequent movement can make epoxy repair unsuitable. An injectability width establishes neither dormancy nor repair release. Use the movement-joint systems guide where the design accommodates movement and the foundation stabilization guide where continuing displacement requires cause treatment.

The moisture and application limits in Table G come from Sika's Sikadur-35 Hi-Mod LV data sheet, July 2021 version 01.02. Its 6 mm value is the manufacturer's rounded pairing with 1/4 in. Verify the current product instructions at application; failed conditions require an approved revised product or detail.

Reclamation 2015 distinguishes ordinary polyurethane leak-sealing foam from epoxy structural rebonding and identifies specialized two-component polyurethane systems. Specify the selected system's structural function and movement capability. A tensile elongation percentage does not automatically establish a cyclic crack-movement rating. Coordinate water control and structural work where the crack both leaks and requires rebonding.

When does the investigation remain on hold?

The field reader validates and records measurements; the monitoring reviewer interprets movement and exceptions; the structural repair designer releases structural repair. Hold when the cause remains active, relevant extremes are missing, measurement integrity fails or product limits are unmet. Record the failed item and the next observation or design action.

Table H. Filled repair hold record for the worked series
Record fieldWorked entryNext action / responsible role
Location and objectiveW1 / C1 / M2; proposed structural rebondingRepair designer confirms member and design objective
Instrument basis25 mm 4420, polynomial calibration; assumed ±0.05 mm bound on changeMonitoring reviewer verifies field uncertainty and installation records
Calculated observation envelope10 to 30°C, dry surface, unchanged loading, selected readings over 14 daysExtend actual observation for missing service or seasonal extremes
Movement result0.59 mm morning-to-afternoon change; +0.28 mm at matched temperature over 14 daysRetain cycles and progression separately
Trigger comparisonDay-14 change interval +0.23 to +0.33 mm exceeds assumed 0.10 mm triggerHold rigid injection; determine cause and movement-compatible design
Moisture and product checksDry surface input; internal moisture, water pressure and application temperature still require site checksInstaller records actual conditions against selected PDS
Disposition and sign-offHOLD in the worked example; field record provides decision date, reviewer and repair-designer approval fieldsReopen release only after documented cause/design action and valid evidence

How much does crack monitoring cost, and what is included?

Anvilfield estimates $2,595 to $3,005 for six manual stations and 18 to 22 paid reading rounds, excluding structural design, electronic monitoring, lifts and traffic control. The location plan's electronic M2 and R1 stations, calibration and readout require a separate supplier quote.

Table I. Manual monitoring cost estimate matching the cadence
Scope itemQuantity / inputExtended costBasis
Six manual station materials6 × $35$210Anvilfield allowance for gauges/datums/consumables, not a supplier quote
Setup, location plan and initial records4 labor-hours × $90$360Anvilfield loaded labor allowance
Eighteen reading rounds including baseline18 × 0.75 hour × $90$1,215Fourteen rounds in the first 7 days plus four weekly rounds; setup labor above is separate
Travel18 × $35$630Anvilfield local travel allowance per reading round
Plotting, interpretation record and report2 hours × $90$180Anvilfield reporting allowance
Total manual program, shorter cadenceSix manual stations / 18 rounds$2,595Four weekly rounds after the initial 7 days
Optional Elcometer 900 purchase1 × $399$399Observed manufacturer sales price Elcometer USA; not included in manual program total
One additional routine visit0.75 hour × $90 + $35 travel$103Anvilfield estimate; rounded to whole dollars
Four extra weekly rounds4 × (0.75 hour × $90 + $35 travel)$410Eight weekly rounds after the initial 7 days; 22-round program becomes $3,005

Method: Anvilfield estimates this program using its November 5, 2026 labor, material and local-travel allowances, multiplying each listed quantity by its rate and adding reporting. Each round is a separate trip. Trained owner staff collecting routine readings changes paid labor and travel without removing observations. Replace these editable allowances with actual bids. Structural analysis/design, electronic equipment and logging, specialist surveys, access equipment, protection/closures, tax and repair labor are outside the total.

The optional microscope price in Table I was checked on November 5, 2026; GEOKON supplies equipment quotations.

Specify station installation, reading count, data format, interpretation, replacement of damaged gauges and ownership of follow-up readings. Separate access and protection costs, particularly where closures or repeat mobilizations govern the scope. An estimator scoping public-building crack investigations can use PorchRocket Bid Control to find city, county and school-district repair bids and early signals from capital plans.

What should be monitored after repair?

Retain mapped stations where practical and begin a separately dated post-repair baseline. Inspect the repaired line and adjacent concrete for new cracks, debonding, leakage and repeated displacement through the driver that governed the repair.

Use the Anvilfield follow-up schedule in Table C after the specified cure and service release. Verify the repair through the load, water or temperature condition that originally drove the problem.

For a water-control repair, record the water head or service condition during verification. A dry wall during dry weather supplies a different test from the same wall under the previously leaking condition.

For structural repair, retain the execution and penetration checks in the injection guide alongside monitoring and design acceptance. Continue any spall and corrosion investigation; renewed movement or leakage reopens diagnosis with the original baseline intact.

Field checklist and handover record

Handover includes the location plan, baseline photos, installation and calibration records, raw and corrected readings, environmental log, plots, invalid-data notes, diagnosis, approved repair detail and signed disposition.

  • Define the repair objective and identify the member, exposure and loading.
  • Map each crack and station with a unique ID, face, chainage and photographs.
  • Record actual width at a repeatable mark separately from displacement-gauge zero.
  • Select opening, shear and out-of-plane measurements to match the mechanism.
  • Select range, calibration mode and installed resolution; establish the uncertainty of a change against the project's decision criterion.
  • Verify sound mounting concrete and approve any drilling near embedded reinforcement or tendons.
  • Record installation, adhesive cure and removal of preset pegs; retain the initial reading.
  • Verify repeated readings and document uncertainty or invalid stations before interpreting change.
  • Log concrete temperature, air temperature, moisture, rainfall/service water and loading at each reading.
  • Assign the reader, monitoring reviewer and repair decision owner; fund the full visit schedule.
  • Cover the suspected daily, event and seasonal drivers; identify any missing extremes.
  • Plot net change, full excursion and comparable-temperature readings separately.
  • Retain raw readings and show sensor correction, calibration and units in the calculation record.
  • Record the diagnosed cause, its treatment and the selected product's current application limits.
  • Document the repair-release or hold decision, with structural design acceptance where applicable.
  • Establish the post-repair baseline, next readings and event-based verification.

Carry the filled hold record into the next review; when release becomes appropriate, record every satisfied criterion, remaining limitation and the approved repair detail.

Reviewed 2026-11-05. Sources checked are listed below with their document versions. Update log: 2026-11-05, reviewed primary sources and calculations; clarified station capability, safety response, corrosion exclusion, temperature matching and uncertainty decisions; corrected the commercial link.

How to cite this page: Anvilfield, How to monitor concrete crack movement using ACI guidance, 2026, https://anvilfield.com/field-guides/concrete/concrete-crack-monitoring-movement/. Citable tables: gauge resolution, location plan, environmental log, movement series and repair-release criteria. Add “reviewed 2026-11-05” and the table's named authorities and editions.

Related tools

Next step: Find concrete repair bids

FAQ

How do you monitor concrete crack movement using ACI guidance?

Map the crack, measure displacement alongside concrete temperature and loading, and use the documented cause and movement history to select and release the repair.

How do you tell an active crack from a dormant crack with a gauge?

An active crack shows repeatable change beyond the installed measurement uncertainty; a dormant classification records the cycles, period and resolution over which no significant movement was detected.

Does concrete crack movement correlate with temperature?

It often does, so compare simultaneous concrete-temperature and displacement readings, then examine change at similar temperatures and loads.

How long should you monitor a crack before epoxy injection?

Anvilfield estimates 5 to 9 weeks for the initial stable-crack program: twice daily for 7 days, then weekly for 4 to 8 weeks, giving 18 to 22 rounds. Seasonal investigations continue through relevant extremes; elapsed time alone does not release epoxy repair.

Is a 0.5 mm tell-tale reading precise enough?

It is useful for coarse trends, but it cannot establish compliance with a project criterion requiring detection of 0.10 mm movement.

Can a crack be active if it returns to its starting width?

Yes; opening and closing between matching endpoints is cyclic movement, so retain the peak-to-peak range.

Does ACI specify one safe crack movement limit?

ACI RAP-1, reapproved 2009, supplies no universal movement-release number. It calls for cause assessment and correction and warns against epoxy where later movement remains. Set the project criterion for the repair objective and installed measurement capability.

Can you inject epoxy into damp concrete cracks?

Some products allow damp substrates, including Sikadur-35 Hi-Mod LV, while that product excludes standing water and injection under hydrostatic pressure at application.

Does polyurethane injection restore structural strength?

Ordinary polyurethane leak-sealing foam does not establish structural rebonding; Reclamation 2015 distinguishes it from epoxy and notes specialized two-component polyurethane systems that require a specific repair design.

How much does a crack-monitoring program cost?

Anvilfield estimates $2,595 to $3,005 for six manual stations and 18 to 22 paid reading rounds, excluding structural design, access equipment, electronic monitoring and repair.

Can I monitor concrete cracks with phone photographs?

Use photographs to track location and crack-tip growth; quantitative image measurement needs a scale, repeatable geometry and validated processing resolution.

How many crack gauges do I need?

The worked wall layout uses six observation stations, including a crack-tip record and an intact-concrete control. Choose stations by independent movement zones, faces and axes; every location governing release needs adequate measurement capability.

People also ask

Codes cited in this guide

This guide is written and reviewed against the published standards below. Always confirm the current adopted edition with the authority having jurisdiction.

Sources checked