Electrical
TEV vs ultrasound for switchgear partial-discharge surveys
Pair TEV and ultrasound, separate noise from discharge, and turn repeatable condition evidence into a dated diagnostic action.
Direct answer
Use TEV and ultrasound together where their signal paths permit. Interpret magnitude, pulse rate and pattern with background and operating conditions; a single dB reading does not establish switchgear condition.
On this page
What does a switchgear partial-discharge survey tell you?Where do TEV and ultrasound work best?What are the TEV partial-discharge limits?How do you distinguish PD from electrical and acoustic noise?How do you make PD measurements repeatable?Can you survey energized switchgear with the doors closed?Which PD findings need action, and what makes a trend credible?Worked example: low TEV with positive ultrasound evidenceHow often should a PD survey be repeated?Which follow-up tests confirm a suspected source?How much does a switchgear PD survey cost, and how long does it take?How do you scope a repeatable switchgear survey program?Field checklist: from first reading to closed findingSources and how to cite this pageOpen the related tool for the calculation, checklist, or packet.
What does a switchgear partial-discharge survey tell you?
Use transient earth voltage (TEV) and ultrasound together for switchgear partial-discharge surveys: TEV detects fast electrical pulses on grounded metal enclosures, while ultrasound detects discharge sound through an available air path or a suitable contact sensor. EA Technology's UltraTEV Plus² manual V13.05.00 uses pulse magnitude, repetition rate and pattern evidence to interpret activity; a single dB reading does not establish switchgear condition. Record background noise, sensor position, phase reference, operating state, temperature and humidity so each finding can be repeated and assigned a follow-up action. [S1]
Partial discharge is localized electrical discharge that does not completely bridge the insulation between electrodes. Detection establishes signal evidence; localization identifies its origin; diagnosis identifies the defect; the operating decision assigns the response. Keep those four conclusions separate in the report. [S1]
A satisfactory infrared inspection does not clear an insulation-discharge finding: resistive heating and PD are different condition evidence. Place the survey within the medium-voltage switchgear maintenance program, with a defined route from finding to diagnostic work.
Define the asset and operating state before choosing the sensor
Mark bus, breaker, cable and instrument-transformer compartments on photographs and the electrical one-line. Record manufacturer, model, insulation medium, nominal and available measured operating voltage, breaker position, accessible surfaces and ownership boundary. Define the surveyed substation by asset IDs, including inaccessible compartments; an open breaker alone does not establish isolation throughout the lineup. [S4, S14]
Where do TEV and ultrasound work best?
Select the sensor from the path between the suspected source and the accessible measurement point. Internal electromagnetic emissions can escape enclosure discontinuities and couple onto exterior metal; airborne ultrasound needs an air passage, while a contact probe needs effective structural coupling. This table is Anvilfield’s method synthesis. [S1, S8]
| Method and reported quantity | Best survey application | Required signal path | Main blind spot or interference | Next evidence | Basis |
|---|---|---|---|---|---|
| TEV, dBmV and pulses per cycle | Electromagnetic PD screening of metal-enclosed switchgear | Sensor square to accessible grounded enclosure; internal emissions escape at a joint, gasket or other discontinuity before coupling onto the outer surface | External RF on metalwork; shielding and geometry; low pulse counts below instrument floor | Background-metal comparison, waveform, phase plot and localization | S1 §§3.6 to 3.10, 4.1 |
| Airborne ultrasound, UTP2 dBµV | Surface discharge with an existing air passage from the compartment | Acoustic path through existing opening or approved acoustic provision; microphone stays clear of plant | Sealed compartment; leakage noise; changed microphone angle or distance | Audio plus phase pattern and repeat scan at the same point | S1 §§3.10.2, 4.3 |
| Contact ultrasound, UTP2 dBµV | Enclosures without an effective air passage, where structure transmits the sound | Repeatable contact with the relevant tank or panel | Extra enclosure layer between probe and source tank; poor coupling; movement; rain; vibration | Coupling check, alternative point and cross-method evidence | S1 pp. 62 to 64 |
| Acoustic imaging, FLIR Si2 PD-capable model | Locating a sound source with an available acoustic view | Acoustic path, documented distance and orientation | Reflections, masking and incorrect voltage/component/distance inputs | Stored image, PRPD, parameter record, second view | S9 |
| UHF, instrument-specific level | GIS or other equipment with a suitable window, antenna or installed sensor | Verified electromagnetic coupling through an appropriate provision | Metal shielding; unsuitable port; external transmitters | Sensitivity check and specialist localization | S1 §4.4; S8 |
| HFCT, calibrated system-specific output | Cable or termination discharge investigation | Suitable accessible earth conductor and approved sensor arrangement | Installation geometry and cable-path attenuation; inaccessible earth | Cable-specific analysis and localization | S1 §4.2; S8 |
| Charge-based PD, apparent charge in pC | Controlled apparatus test under a specified test plan | Calibrated electrical measuring circuit | External interference; test arrangement differs from operating survey | Apparatus-specific acceptance and recorded voltage sequence | S7, IEC 60270:2025 ed. 4 |
Why the two methods can disagree
A low TEV result can coexist with surface-discharge sound, while loud acoustic activity can come from vibration or leakage. EA’s UTP2 manual V13.05.00, §4.3.5, excludes contact-probe use where another layer separates the probe from the tank containing the suspected source. Mark that compartment unassessed by contact ultrasound; an outer cabinet reading cannot clear the inner tank. [S1, S4]
Identify the insulation around the component separately from the breaker interruption medium. A vacuum breaker can occupy an air-insulated lineup; its nameplate does not establish external acoustic access to the sealed interrupter. High-frequency current transformer (HFCT) and ultra-high-frequency (UHF) follow-up likewise require suitable earth-conductor or sensor arrangements, not simply an available instrument. [S1, S8]
What are the TEV partial-discharge limits?
Use the instrument's magnitude, pulse rate and pattern interpretation together with equipment condition and failure consequence. EA Technology's UltraTEV Plus² manual V13.05.00 specifies a 10 dBmV minimum pulse-count level, so a zero counter below that level does not establish the absence of partial discharge. The numerical boundaries below describe instruments and measurement frameworks, not universal switchgear acceptance bands. [S1]
| Authority and edition | Quantity | Verified value or rule | Interpretation |
|---|---|---|---|
| EA UTP2 manual V13.05.00, June 17, 2025, p. 84 | TEV measurement range | 0 to 60 dBmV | Instrument range, not acceptable asset range |
| Same | TEV pass band | 3 to 80 MHz | Sensor/system frequency response; different tools can capture different interference |
| Same | TEV resolution / stated accuracy | 1 dB / ±1 dB | Small changes require repeatability evidence; this is not total field uncertainty |
| Same | Minimum pulse-count level | 10 dBmV | Counter behavior below this level cannot clear an asset |
| Same, p. 85 | Airborne ultrasound range | -7 to +71 dBµV | UTP2 signal level, not airborne sound-pressure dB |
| Same | Airborne center frequency | 40 kHz | A sensor characteristic, not a universal optimum for every acoustic survey |
| Same, §3.12.2, pp. 19 to 20 | Alarm settings | TEV red/amber and ultrasonic red levels are user-adjustable | Save actual settings; a color is not a universal equipment limit |
| Same, §7, p. 83 | Calibration interval | 12 months | Instrument calibration, distinct from asset survey interval; function check is not calibration |
| EA phase-reference application note v1, September 17, 2021 | Recorded survey data window described by that note | 10 seconds | Lock to actual system frequency before recording; identify acquisition settings for later firmware |
| IEC 60270:2025, ed. 4 | Charge-based measurement scope | AC up to 500 Hz or DC | Defines measurement framework, not a handheld TEV alarm limit |
| IEC TS 62478:2016, ed. 1 | Electromagnetic and acoustic measurement scope | HF/VHF/UHF and acoustic methods; sensitivity/calibration and location included | Use this framework for nonconventional methods, not as a dB conversion table |
| FLIR Si2a, T810671-AA-en-US web manual | Norm / High / Ultr filter bands | 10 to 65 / 20 to 65 / 30 to 130 kHz | Model/mode-specific choices; Norm unavailable in Leak detection mode; record selected filter |
| FLIR Si2 T810637-AG web manual | Displayed normalized SPL bandwidth | 20 kHz | Manufacturer processing convention; retain original settings |
Keep dBmV, dBµV, dB SPL and pC separate
TEV dBmV references 1 mV; UTP2 ultrasonic dBµV describes its transducer chain; acoustic SPL uses a sound-pressure reference. Apparent charge in pC belongs to a calibrated electrical measuring arrangement. Do not subtract ultrasound from TEV or convert an enclosure TEV reading directly into apparent charge. [S1, S7, S9]
Where manufacturers and standards differ
EA's narrowband airborne sensor and FLIR's selectable acoustic filters describe different systems; preserve each configuration on repeat visits. FLIR's acoustic severity assessment uses distance, voltage and component type, whereas UTP2 interpretation combines TEV magnitude and repetition rate. Neither manufacturer's severity label transfers directly to the other. [S1, S9, S10]
The UTP2 manual defines its short-term TEV Severity index as magnitude in millivolts multiplied by pulses per cycle, not displayed dBmV multiplied by pulse count. Retain both inputs separately. Its adjustable alarm thresholds also mean that a green display records a configured response, not apparatus acceptance. [S1, §§3.9 and 3.12.2]
How do you distinguish PD from electrical and acoustic noise?
Use phase-resolved partial-discharge (PRPD) plots with localization and noise checks: interference synchronized to the supply can also appear phase-related. EA’s UTP2 manual V13.05.00, §4.3.1, describes discharge audio as crackling; compare that sound with the stored phase plot, background and source location. The instrument shifts ultrasound into the audible range for headphones; retain the original audio files for review. EA identifies radio transmissions, overhead insulators and transformer bushings as external electromagnetic sources; safely accessible, unrelated metalwork provides a useful background comparison. The matrix below is Anvilfield’s diagnostic synthesis. [S1, S2]
| Suspected source | Affected channel | Clue | Discriminating check | Disposition | Source |
|---|---|---|---|---|---|
| External radio transmission | TEV/UHF | Similar activity on unrelated metal; narrowband RF where spectrum is available | Record background-metal result; use supported UHF tuning or TEV localization | Label external interference when supported; preserve recordings | S1, S2 |
| Variable-speed drive or UPS interference | Electromagnetic channels | Activity changes with plant operating state or appears across multiple panels | Correlate timestamped operating log with longer monitoring; do not switch equipment merely to improve a reading | Separate operating-state groups in analysis | S6 |
| Remote corona on bushing or overhead insulator | TEV/UHF and sometimes acoustic | Signal appears at several nearby surfaces | Locate spatial source and compare background references | Record external source separately from internal switchgear suspicion | S1 §4.1.1 |
| Air or gas leakage | Airborne acoustic | Broadband hiss or source near pneumatic equipment | Localize acoustic source; compare phase pattern and signal at the switchgear point | Classify the acoustic source before assigning electrical severity | S1 acoustic method; S10 leak/PD modes; Anvilfield synthesis |
| Rain or transformer vibration | Contact ultrasound | Panel vibration can imitate discharge sound | Record weather and vibration; repeat with stable probe and an alternative supported method | Mark contaminated reading; do not call it PD from sound alone | S1 p. 64 |
| Probe motion or poor coupling | Contact ultrasound | Signal changes as probe moves or is pressed | Secure probe; document surface/coupling; repeat same position | Reject unstable acquisition and reacquire | S1 pp. 62 to 64 |
| Phase-reference drift | TEV/acoustic phase plots | Pattern smears across phase during capture | Re-establish system-frequency lock and record again | Replace invalid pattern classification with locked capture | S3 |
| Localized discharge candidate | One or more methods | Repeatable location with mechanism-consistent phase/audio/waveform evidence | Repeat at same point, compare neighboring/background points, localize | Open condition finding with supporting files and follow-up test | S1, S4 |
What distinguishes surface, internal and floating-metal discharge?
Name the suspected mechanism separately from confidence and action priority. FLIR groups surface/internal discharge in one PRPD class, so its camera label alone cannot identify the defective component. NETA World’s Fall 2020 account explains that poor-contact and floating-metal patterns can resemble each other, move in phase and mask weaker sources. [S9, S13]
| Suspected mechanism | Physical distinction | Evidence that advances the finding | Follow-up that resolves the uncertainty | Basis |
|---|---|---|---|---|
| Surface discharge | Activity along an insulation surface | Localized acoustic evidence with a usable path; humidity-labeled records | Isolated inspection for contamination, tracking or damaged insulation; verify after approved correction | S1; S4; S5 |
| Internal discharge | Activity within insulation rather than an exposed surface | Localized TEV and mechanism-consistent phase/waveform evidence | Apparatus-specific controlled PD test and component investigation | S1; S3; S7 |
| Poor contact or floating metal | Poor HV connection versus an electrically floating conductive part in an electric field | Similar PRPD patterns can arise from either mechanism; flat broad event bands and phase movement support further localization | Locate and inspect the component; verify intended contact/bonding and resurvey after repair | S13; S12 |
Verify the phase reference before naming the defect
EA’s 2021 phase-reference note shows two captures at the same 11 kV cable box: an unlocked capture resembles noise, while a locked capture reveals an internal-void-type pattern. Save reference source, frequency, lock state and capture duration; restore lock before repeating a smeared pattern. The UTP2 manual states that ultrasonic classification is unavailable without phase lock, so a missing classifier is not a negative PD result. [S3; S1, §3.10.3]
How do you make PD measurements repeatable?
EA Technology's UltraTEV Plus² manual V13.05.00 requires ultrasonic comparisons at the same position with the same sensor type. Anvilfield adds three captures per point and route-end function checks in the protocol below. [S1, p. 62]
| Step | Record or action | Protocol requirement | Comparison rule | Basis |
|---|---|---|---|---|
| Identify | Asset, compartment, point photo | Asset ID / front breaker / rear cable / marked sensor footprint | Same point ID for later comparison | S1; Anvilfield protocol |
| Instrument | Model, serial, firmware, accessory, calibration, filter/gain and actual alarm settings | UTP2; V13.05.00 manual basis; 12-month calibration interval | New sensor or processing configuration starts a labeled series | S1 |
| Function check | Before/after route check result | Record pass/fail and timestamp at both ends of route | Failed check requires review of affected acquisitions | S1 function check; before/after cadence is Anvilfield protocol |
| Background | Metal and air references, photo and time | Capture before route and after material interference changes | Record background alongside signal; do not algebraically remove unrelated pulse maxima | S1; Anvilfield interpretation |
| Position | Contact face or microphone position | Same marked footprint; same acoustic distance, angle and path | Airborne/contact series remain separate | S1 p. 62; S9 |
| Reference | Frequency/reference source and lock | 50 or 60 Hz as applicable; locked state saved | Reacquire smeared or unlocked phase plot | S3 |
| Replicate | Capture count and duration | Three captures per method per marked point; 10 seconds each for the acquisition in EA’s 2021 note | Retain all amplitudes, counts, patterns and timestamps; report their range, identify clipping and examine spread | Count is Anvilfield protocol; duration basis S3 |
| Conditions | Voltage, current if available, switch state, ambient temperature, RH | Record actual kV, A, °C and %RH with timestamps and live/historical sensor state; mark unavailable values explicitly | No invented zeroes or guessed matching conditions | S4, S6, S9 |
| Interpretation | Signal class, confidence and coverage | Candidate PD / noise / unresolved / no PD detected at covered point | Separate evidence quality from asset action priority | S1; Anvilfield synthesis |
| Archive | Raw signal, audio, image and reviewer action | Asset-linked files plus due date and work order | Preserve as-found evidence after repair | S4, S5 |
Voltage supplies electrical stress; current records operating state and influences temperature. Keep both where available, without importing a thermography minimum-load percentage into PD screening. Label comparisons matched conditions, changed conditions or unassessed. A humid-condition increase still needs action, while its cause requires comparison within the recorded environmental conditions. [S4, S6]
The UTP2 manual V13.05.00 retains bracketed historical temperature/RH readings after sensor removal. Let live readings settle and record their timestamp and live/historical status; a value carried from the previous panel is not a fresh environmental measurement. [S1, §3.6]
Distinguish repeatability from accuracy
Instrument accuracy excludes changes in geometry, background and coupling. Compare replicate spread before interpreting a small rise, and check range-end readings for clipping before calling a flat maximum stable. New localization or pattern evidence can justify action even when amplitude barely changes. [S1, S3; Anvilfield interpretation]
Can you survey energized switchgear with the doors closed?
Yes, where approved external measurements and installed signal paths support the method. EA’s UTP2 manual V13.05.00 permits ground-potential use only, requires earthed metalwork and gives the instrument, leads and accessories no inherent shock protection. It prohibits altering earth connections or disturbing plant mechanically, electrically or by applying heat during measurement. [S1, p. ii]
Keep doors, barriers, interlocks and bonds intact during external screening. Follow the site task assessment and arc-flash information; PD amplitude determines neither PPE nor approach distance. Refer bond defects to the grounding test scope without changing the bond for a reading.
Keep diagnostic access separate from routine screening
For utilization installations covered by OSHA Subpart S, 29 CFR 1910.333(a)(1) requires deenergizing exposed live parts before work on or near them unless the employer demonstrates increased hazards or infeasibility from design or operating limitations. Plan intrusive inspection under the electrical isolation procedure, with source isolation, stored-energy control, lockout/tagout and qualified-person voltage verification, including backfeed and induced voltage. OSHA 1910.333(b)(2)(iv)(B) requires checking the voltage tester immediately before and after verification on circuits over 600 V nominal; a TEV detector is not that voltage tester. OSHA 1910.331 defines the scope and exclusions for generation, transmission and distribution work. [S14]
CRYSOUND’s open-panel localization applied an external HV source after supply isolation: the diagnostic circuit was energized during testing. Treat it as a separate controlled HV test. EA’s manual prohibits measurements during nearby electrical storms or immediately after circuit energization; it gives no fixed waiting time. Its preferred clearance of more than 30 cm from perpendicular metalwork concerns sensor geometry, not personnel safety clearance. [S12, S1]
Which PD findings need action, and what makes a trend credible?
A positive result needs evidence review and an assigned action, even without a long trend. Anvilfield’s register below separates diagnostic confidence, suspected mechanism and consequence; the authorized owner/operator controls switching. Prioritize a localized finding by the insulation involved, defect evidence, available redundancy, fault exposure and outage consequence. A quiet trend on a critical bus still needs an assigned diagnostic response.
A PD amplitude trend is comparable only when sensor, position, acquisition settings, operating state and environmental conditions are recorded together; changed conditions require a separate interpretation. This Anvilfield rule follows the acquisition and monitoring evidence in S1, S3, S4 and S6.
| Condition label | Evidence needed | Trend interpretation | Action and timing basis | Source |
|---|---|---|---|---|
| Covered point, no PD detected | Valid check, usable signal path, controlled background, no supporting PD signature | Snapshot baseline for this method and point | Retain coverage record and scheduled program due date | S1, S6 |
| Noise-dominated or unresolved | Background/source/coupling explains signal, or discrimination incomplete | Do not plot as confirmed asset deterioration | Repeat controlled acquisition during the visit where feasible; unresolved case enters follow-up register | S1, S2; Anvilfield workflow |
| Repeatable localized candidate | Repeatable spatial source plus mechanism-consistent phase/audio/waveform support | Diagnostic confidence rises even without amplitude growth | Reviewer assigns localization or inspection task and a due date before report closure | S1, S4; Anvilfield workflow |
| Environment-sensitive surface-discharge evidence | Surface-type signal plus RH/temperature series | Compare similar conditions; retain humid-condition peaks | Assign monitoring or targeted inspection using the condition-specific intervals | S4, S6 |
| Deterioration under matched conditions | Repeated, comparable evidence of increased activity or changed pattern | Escalating condition evidence, not a failure-date calculation | Notify authorized operator promptly; set investigation and operating response from consequence and evidence | S1; Anvilfield workflow |
| Verified repair response | Defect found/corrected and comparable post-work survey | New as-left baseline linked to as-found record | Close only with documented scope and repeat-test result | S5, S12 |
Published repair evidence versus a continuing deterioration trend
CRYSOUND reports 30 dB TEV and 26 dBµV ultrasound before localization of a loose field deflector associated with an undersized O-ring, followed by 5 dB TEV and noise-level ultrasound after correction. Anvilfield calculates a 25 dB TEV difference from those readings. Retain those values as a repair comparison, with environmental matching recorded as unknown. [S12]
NETA World’s Fall 2020 discussion explains that PD amplitude can rise or fall with operating conditions and defect development; amplitude is not a remaining-life clock. EA’s Trinity Mirror case provides physical closure evidence instead: contact ultrasound localized activity, inspection found CT surface treeing, and replacement followed by retesting eliminated the source. [S13, S5]
Worked example: low TEV with positive ultrasound evidence
EA Technology’s May 15, 2018 survey used an UltraTEV Plus² and airborne ultrasound at indoor Substation 1, with 31 °C and 27% RH recorded. F1A was open while F1B carried the load. The table retains the source’s amplitude bins and ultrasonic “dB” notation. [S4]
| Input or location | TEV observation | Ultrasound observation | Result or retained condition |
|---|---|---|---|
| F1A front breaker compartment | 0 to 10 dBmV bin; <1 pulse/cycle; negative phase indication | 0 to 10 dB reported bin; positive phase/audio; PD classification | Acoustic evidence supports suspected surface PD |
| F1A rear cable compartment | 0 to 10 dBmV bin; <1 pulse/cycle; negative phase indication | 0 to 10 dB reported bin; positive phase/audio; PD classification | Acoustic evidence supports suspected surface PD |
| F1B front breaker compartment | 0 to 10 dBmV bin; <1 pulse/cycle; negative phase indication | Same reported amplitude bin; negative phase/audio; noise classification | No PD detected in recorded checks |
| F1B rear cable compartment | 0 to 10 dBmV bin; <1 pulse/cycle; negative phase indication | Same reported amplitude bin; negative phase/audio; noise classification | No PD detected in recorded checks |
| Reported follow-up | Repeat Substation 1 survey every 3 to 6 months | Inspect and/or perform offline testing during an outage | Report also calls for attention to greater humidity on retest |
Turn the observed result into a checkable work order
Anvilfield groups the two positive point records into one F1A feeder finding, preserving front-breaker and rear-cable evidence separately. Assign the maintenance lead a repeat-survey task and planned isolated inspection or offline testing, with the original environmental record attached. Localize before assigning two separate defects: the front and rear points can receive emissions from one source.
Anvilfield estimates an August 15 to November 15, 2018 retest window by adding the report’s three to six calendar months to May 15. Use that window on the F1A work order, with earlier review if the evidence worsens. [S4]
How often should a PD survey be repeated?
IEEE DEIS’s July 2023 webinar abstract describes routine survey programs operating every few months or annually; EA’s surface-discharge case specifies three to six months, and its service page describes one to two weeks of temporary monitoring. Use these published practices to select a condition-specific task, with an accountable reviewer and due date. [S11, S4, S6]
| Use case | Published interval or duration | Authority/date | How to apply |
|---|---|---|---|
| Established routine substation survey programs | Every few months or annually | IEEE DEIS webinar abstract, July 2023 | Practice description; select asset task interval in owner's program |
| Substation 1 surface PD in worked example | Every 3 to 6 months | EA report, June 8, 2018 | Source-specific retest and monitoring recommendation, with outage investigation |
| Separate no-PD substation in same report | 2 years | EA report, June 8, 2018 | Retain as contrasting case evidence, not default for every quiet asset |
| Intermittent PD, interference or critical asset investigation | Typically 1 to 2 weeks | EA Americas service page, undated/retrieved | Temporary recording of TEV, ultrasound, temperature and RH |
| Persistent high-consequence monitoring need | Continuous monitoring with defined alarm response | IEEE DEIS 2023; EA service page | Assign review and escalation ownership |
Specify who reviews monitored records, who receives alarms and who authorizes the operating response. Installing sensors does not resolve an open finding; the monitoring task must answer whether activity follows plant operation, environment or a persistent localized source. [S6; Anvilfield workflow]
Which follow-up tests confirm a suspected source?
Choose follow-up by the unresolved question: source direction, acoustic location, cable path, controlled electrical response or visible insulation damage. Anvilfield’s register assigns test objectives and closure evidence.
| Trigger | Follow-up and objective | Operating/access condition | Evidence to retain | Accountable role and closure | Basis |
|---|---|---|---|---|---|
| Broad TEV signal or uncertain external source | TEV time-of-flight/location and background comparison | Approved external grounded surfaces | Point map, timing comparison, reference readings and raw captures | PD reviewer resolves source or marks unresolved | S1, S2 |
| Repeatable acoustic candidate | Acoustic localization with second view or suitable contact probe | Existing approved path; otherwise separately planned access | Audio, PRPD, point/distance image and settings | Diagnostic lead assigns compartment/source confidence | S1, S9 |
| Suspected cable termination source | HFCT survey and cable-specific localization | Approved access to suitable earth conductor; no altered bonds | Sensor arrangement, cable ID, waveforms and calibration basis | Cable diagnostic specialist issues location/test conclusion | S1, S8 |
| Internal insulation question needing controlled test | Charge-based PD test to apparatus-specific procedure | Isolated asset under a controlled test arrangement and applied test voltage | Calibration, applied voltage/time sequence and frequency, inception/extinction where measured, apparent charge, noise record and acceptance basis | Test engineer evaluates against specified apparatus criteria | S7; S13 |
| Surface PD with contamination/moisture suspicion | Isolated visual inspection and OEM-approved correction | Approved isolation and work procedure | As-found photographs, contamination/damage, component IDs, correction | Maintenance lead completes work; reviewer verifies repeat survey | S4, S5 |
| Intermittent activity or condition-sensitive peaks | Temporary TEV/acoustic monitoring | Suitable sensor installation and retrieval plan | Timestamped activity, temperature and RH throughout the selected monitoring period | Asset engineer reviews condition groups and assigns action | S6 |
| Repair completed | Repeat same-point survey and applicable electrical checks | Restored approved test/operating conditions | As-found/as-left files, settings and operating/environment record | Authorized owner closes finding against stated scope | S5, S12 |
Controlled offline PD tests can measure inception and extinction voltages under the applied voltage sequence. Retain voltage, waveform, frequency, calibration and background, and keep these results separate from the operating survey series. NETA World’s Fall 2020 article explains this online/offline distinction; IEC 60270:2025 supplies the charge-based measurement framework. [S13, S7]
Insulation-resistance testing answers a different insulation question, while thermography documents surface-temperature evidence. Neither alone clears a localized PD finding. Combine their results by asset and defect, without substituting one method’s severity scale for another.
What the closeout record must retain
Keep the original raw traces, audio, point photographs, instrument settings, checks, background, operating conditions and coverage exclusions. Add the actual defect, corrected component, test basis and repeat result. “Source eliminated at repeat test” is a useful closure statement tied to evidence and scope. [S1, S4, S5]
How much does a switchgear PD survey cost, and how long does it take?
Anvilfield estimates $2,000 in direct cost for a 12-panel survey allowing two technicians four field hours, four total reporting person-hours, $300 in instrument allocation and $200 in travel. Increasing field time to six elapsed hours raises that estimate to $2,500. The selected planning inputs are shown below.
| Cost input | Quantity and selected rate | Base cost | Six-field-hour case |
|---|---|---|---|
| Field crew | 2 technicians × 4 hours × $125/person-hour | $1,000 | 2 × 6 × $125 = $1,500 |
| Review/reporting | 4 person-hours × $125/person-hour | $500 | $500 |
| Instruments | Selected daily allocation | $300 | $300 |
| Travel | Selected allowance | $200 | $200 |
| Total direct cost | Sum of four lines | $2,000 | $2,500 |
| Cost divided over 12 panels | Total / 12; rounded | $167/panel | $208/panel |
Build the time allowance from measurement points
Count marked points, methods and repeat captures before assigning crew time. For 12 panels with three points each, two methods and three captures per method, the plan contains 216 records. At the ten-second acquisition described by EA’s phase-reference note, raw recording totals 2,160 seconds, or 36 minutes. [S3; Anvilfield estimate]
Method note: Anvilfield’s November 5, 2026 estimate multiplies field and reporting person-hours by a selected $125 hourly rate, then adds instrument and travel allowances. Four field hours cover preparation, access, background checks, movement, placement and flagged-point repeats; four reporting hours cover evidence review and the action register. The rate is an estimate input, not a measured market average.
Price controlled HV testing, switching services, repairs, outage losses and overnight travel separately. Overhead, profit and taxes also sit outside this direct-cost model. Accessible points and diagnostic follow-up drive the scope more accurately than panel count alone.
How do you scope a repeatable switchgear survey program?
Specify a complete point map, complementary method coverage, background checks, raw evidence, condition labels and a dated findings register before counting panels. Obtain equipment records, maintenance history and operating restrictions from the owner. State which compartments each method covers and which remain unassessed.
Use the predictive-maintenance program to connect baselines, criticality and work orders, while retaining PD-specific comparability. The preventive-maintenance program guide supplies cross-trade route and closure practices. Keep thermal, PD and outage-test findings together by asset without averaging their incompatible severity scores.
Scope by site, then verify the indoor equipment inventory
Group sites geographically to plan travel between facilities. Contractors building a regional survey route use PorchRocket's Asset Search to locate visible substations and power sites with the owner of record attached to each find.
Facility records establish the indoor switchgear inventory; field testing establishes its measured condition. Confirm the utility/customer operating boundary against the one-line, since property ownership alone does not define permission to survey every asset.
Field checklist: from first reading to closed finding
Use this Anvilfield checklist to complete the survey record. Every positive or unresolved finding needs a responsible role, a due date and closure evidence; inaccessible scope receives “not assessed,” never an invented zero.
Want this checklist to run itself on every job — with photo proof and a signed record crews can hand the customer? That's FieldOS.
Sources and how to cite this page
Anvilfield. Editorial review date: November 5, 2026. Sources checked: November 6, 2026. The IEC references below are public publisher scopes; the summaries do not reproduce paywalled clauses.
- S1. EA Technology, UltraTEV Plus² Operating Manual, model UTP2, 2388-MANUL-V13.05.00, June 17, 2025.
- S2. EA Technology Australia, PD FAQ: Background Noise, February 9, 2023.
- S3. EA Technology, Importance of accurate phase reference lock when using the UltraTEV Plus2, v1, September 17, 2021.
- S4. EA Technology, Partial Discharge Survey Examples of MV & HV Assets, report June 8, 2018, survey May 15, 2018.
- S5. EA Technology, UltraTEV Plus2 confirms and classifies Partial Discharge on Trinity Mirror HV Network, undated case study; initial survey February 2016.
- S6. EA Technology Americas, Partial Discharge Surveys, undated live service page.
- S7. IEC 60270:2025, edition 4.0, published June 5, 2025, public publisher scope.
- S8. IEC TS 62478:2016, edition 1.0, published August 29, 2016, public publisher scope.
- S9. FLIR Si2 series, Partial discharge detection, T810637-AG-en-US, live manual.
- S10. FLIR Si2a, Locating sound sources, T810671-AA-en-US live manual.
- S11. IEEE Dielectrics and Electrical Insulation Society, Improving Network Reliability with Partial Discharge Monitoring, July 2023 webinar announcement/abstract for August 8, 2023.
- S12. CRYSOUND, Floating Partial Discharge in MV Switchgear: Detection and Repair Case Study, undated page.
- S13. NETA World, Partial Discharge Secrets, Tips, and Tricks, Fall 2020, EA Technology-hosted publisher reprint.
- S14. OSHA, 29 CFR 1910.331, Scope, and 1910.333, Selection and use of work practices, public regulatory text checked November 6, 2026.
Update log: November 5, 2026, final article review added layered-enclosure exclusions, clarified energized diagnostic access and OSHA isolation requirements, preserved suspected-source confidence, and removed repeated explanations.
How to cite this page: Anvilfield, TEV vs ultrasound for switchgear partial-discharge surveys, 2026, https://anvilfield.com/field-guides/electrical/switchgear-partial-discharge-survey-interpretation/
FAQ
Is TEV or ultrasound better for switchgear PD surveys?
Use both where signal paths permit: TEV screens electromagnetic pulses and ultrasound adds acoustic evidence, especially for surface activity.
What TEV level is acceptable?
Use the specific instrument's magnitude, pulse-rate and pattern interpretation with asset evidence; no single TEV dB number clears all switchgear.
Does zero TEV pulse count mean no partial discharge?
No; the UTP2 manual V13.05.00 specifies a 10 dBmV minimum pulse-count level.
Can ultrasound detect PD through a closed panel?
Airborne ultrasound needs an air path. Contact ultrasound needs suitable coupling to the source tank; EA excludes its UCP1 probe where another enclosure layer separates that tank from the probe.
Can ultrasonic dB be compared with TEV dBmV?
No; they are different measurement channels and reference quantities.
How do I distinguish PD from noise?
Combine safe background comparisons, localization, stable acquisition and phase/audio/waveform evidence.
Does humidity change partial-discharge readings?
Surface activity can vary with humidity, so preserve RH and temperature with every comparable measurement.
How often should switchgear PD testing be done?
Published programs range from every few months to annually; assign the actual interval from asset condition and the maintenance program.
Does PD testing replace infrared thermography?
No; discharge evidence and surface-temperature evidence address different aspects of equipment condition.
Does a higher PD reading predict a failure date?
No. Compare sensor, position, settings, operating state and environment before assigning deterioration; defect type and failure consequence govern the response.
Does a phase-related PRPD pattern prove partial discharge?
No. Supply-synchronized interference can also form a phase-related pattern. Combine PRPD with localization and noise checks; floating-metal and contact discharge can move in phase.
Does a positive PD result mean switchgear must shut down?
Assign an action from the mechanism, confidence, observed change and failure consequence; the owner's authorized operator controls switching.
People also ask
Codes cited in this guide
This guide is written and reviewed against the published standards below. Always confirm the current adopted edition with the authority having jurisdiction.