ANVILFIELD Try FieldOS

Field glossary

Substation

The installation that ties the site to the grid and steps high voltage down to medium voltage

Used across 1 Anvilfield field guides, most in Datacenter.

Where this shows up

PorchRocket's Asset Search is the asset source for substation, locating outdoor power assets visible from above with the owner of record on each find.

Next step: Search for power assets

Back to the full field glossary