ANVILFIELD Try FieldOS

Field glossary

Day tank

A tank serving the engine locally within the fuel-supply arrangement; verify its capacity, connections, and controls from the equipment records.

Used across 2 Anvilfield field guides, most in Datacenter.

Also defined as

  • The small tank near the engine, commonly about an hour of full-load fuel, that feeds the injectors directly

Where this shows up

PorchRocket's Asset Search is the source for locating tanks for day tank, with the owner of record returned on every find.

Next step: Search for tanks

Back to the full field glossary