Field glossary · measurement
Design rainfall rate
A design rainfall rate states how fast water arrives for a selected location, duration and recurrence interval. NOAA Atlas 14 gives 3.18 in/hr for the 100-year, one-hour estimate at the Washington, DC point used below, compared with 6.04 in/hr for 15 minutes. Both rates describe that location; the drainage design determines which duration applies. Preserve the duration beside the intensity so an inches-per-hour label does not disguise a different storm selection.
The 100-year rainfall in inches per hour for the site, from the code map or NOAA Atlas 14
Read the duration before the rainfall number
For an estimate under the 2025 Plumbing Code of New York State, derived from the 2024 IPC, label the rainfall selection with Section 1106.1 and its basis in the hourly map or approved local weather data. The submitted number then has a traceable approval basis, rather than an unexplained NOAA screenshot in the interior storm piping calculation.
On the NOAA export, read the data-type and series fields before selecting the duration row and recurrence-interval column. Preserve the coordinates, atlas volume and version with that row. A table headed precipitation depth contains inches accumulated over the named duration, even when the design worksheet requires inches per hour.
One Washington, DC location, three different intensities
NOAA Atlas 14, Volume 2, Version 3 gives a 100-year, one-hour precipitation depth of 3.18 inches at 38.9000 degrees north, 77.0400 degrees west in Washington, DC. The same point's partial-duration-series export gives 1.51 inches over 15 minutes and 8.32 inches over 24 hours.
Convert depth to intensity with depth / (duration in minutes / 60). For the 15-minute row, 1.51 / 0.25 = 6.04 in/hr; inches per hour is the reporting unit, not a claim that this rate persists for a full hour. The rows below are separate duration-frequency estimates rather than successive portions of one storm.
| Duration | NOAA 100-year depth | Calculated intensity |
|---|---|---|
| 15 minutes | 1.51 inches | 6.04 in/hr |
| 60 minutes | 3.18 inches | 3.18 in/hr |
| 24 hours | 8.32 inches | 0.347 in/hr |
Catch a duration change in the estimate handoff
For the DC point, the 15-minute intensity is 1.90 times the one-hour intensity, calculated as 6.04 / 3.18. A handoff that changes only the cell value from 3.18 to 6.04 has increased the selected intensity by about 90%. Mark the duration change explicitly so the estimator can distinguish a different design storm from a revised estimate for the same storm.
What does a 100-year storm mean over a roof's life?
NOAA's HDSC FAQ assigns a 1% annual exceedance probability to a 100-year rainfall amount and about a 26% chance of exceedance over 30 years. The recurrence label describes probability at a location and duration, rather than a schedule with a century between storms.
For independent years with a constant annual exceedance probability p, the chance of at least one exceedance in n years is 1 - (1 - p)^n. Using p = 0.01 and n = 30 gives 26.03%, rounded to NOAA's 26%. This is the probability of exceeding the rainfall threshold, not the probability that a roof will flood: blockage, available storage and outlet performance also affect the outcome.
Which atlas belongs in the calculation?
NOAA's Atlas 15 information page schedules published estimates for the contiguous United States no earlier than September 2027, with preliminary estimates intended for review. As of November 5, 2026, identify Atlas 14 by its actual volume and version when using its published data. A pilot release or proposed future-climate adjustment needs its own stated design basis; the atlas number alone does not establish approval.
Distinctions
- Rain load
- Rainfall intensity describes incoming water per unit time. Rain load describes the weight retained on the roof; drain restriction and overflow elevation connect the two quantities.
- Storm duration
- Duration is the accumulation window used for the estimate. Return period describes frequency. Changing either selects a different estimate even when the site coordinates stay fixed.
Frequently asked questions
Can I divide a 24-hour design rainfall by 24 to size an hourly drain?
That produces the average intensity over 24 hours. The DC calculation gives 0.347 in/hr, while NOAA's separate one-hour estimate is 3.18 in/hr. Select the duration required by the drainage design.
Must overflow drains always use a 15-minute storm?
No. Section 1108.3 of the 2025 Plumbing Code of New York State sizes secondary drains using the primary system's rainfall rate, without crediting primary flow. Identify the governing requirement before assigning a shorter storm to the roof overflow design.
Sources checked
- NOAA Atlas 14, Volume 2, Version 3: PDS precipitation depths at 38.9000 N, 77.0400 W
- NOAA HDSC FAQs: data selection, AEP, ARI and 30-year exceedance probability
- NOAA Atlas 15 informational page: publication timeline and status of preliminary estimates
- New York Department of State: 2025 Plumbing Code, July 2025, Sections 1106.1 and 1108.3