ANVILFIELD Try FieldOS

Field glossary · safety

Equipotential bonding

A pool's equipotential-bonding network limits touch-voltage differences, but its perimeter detail changes with surface material and elevation. NFPA's corrected 2026 NEC places the perimeter envelope within 3 ft above and below maximum water level and 3 ft beyond the inside wall. Conductive paving, unpaved ground and raised nonconductive surfaces have different provisions, so one copper-ring detail cannot be applied to every pool edge.

Tying all pool metal and the water to the same voltage under NEC 680 so there is no difference to shock a swimmer

Used across 3 Anvilfield field guides, most in Plumbing.
Updated

Locate the bonding zone from maximum water level

NFPA's errata 70-26-2 for the 2026 NEC places the perimeter bonding zone within 3 ft above and 3 ft below maximum water level, extending 3 ft horizontally beyond the inside pool wall. Measure the vertical band from the water-level datum shown on the pool details. A lowered patio can fall within the band even when it is well below the coping.

A deck 30 in. below maximum water level and 24 in. horizontally from the inside wall lies inside that geometric band. Its material and support arrangement then determine the applicable bonding method. Photograph the elevation relationship as well as the conductor before paving; a close photograph of copper alone cannot establish the extent of the protected surface.

The same 2026 NEC errata limits perimeter-surface bonding to the pool side of a separating permanent wall or building at least 5 ft high. Raised nonconductive surfaces also have specific exceptions. Identify those boundaries on the plan rather than extending the three-foot envelope through every barrier or treating all deck materials alike.

Match the detail to paving, soil and support

Under NFPA's corrected 2026 NEC text, the conductor grid or welded wire provided where reinforcing steel is absent or encapsulated must sit directly under paving no more than 6 in. below finished grade. NFPA's errata 70-26-2 makes corrosion-resistance and mechanical-performance listing effective January 1, 2029 for that grid or welded wire where it is not fully embedded in concrete.

The Pool & Hot Tub Alliance's account of the 2023 NEC amendments explains why the perimeter cannot be treated as one uniform ring: paved, unpaved and raised nonconductive surfaces have different provisions. Preserve the permit's adopted edition and the applicable detail in the inspection record. A repair to one paved strip should show how that strip reconnects to the surrounding bonded work.

What a continuity reading leaves out

Continuity confirms an electrical connection between the points tested. It does not map every conductive surface, prove a buried connector's corrosion resistance or establish that the conductor follows the required geometry. A meter reading through parallel metal paths can also conceal the loss of the connection being inspected.

For a deck alteration, annotate the demolished area, connections retained, replacement material and reconnection locations on the pool bonding plan. This identifies which concealed connections the repair disturbed, something neither an equipment-pad photograph nor a continuity reading records.

Distinctions

Equipment grounding
The equipment grounding path supports fault clearing. The pool bonding network addresses touch-voltage differences among connected surfaces.
GFCI protection
A GFCI detects current imbalance and opens a circuit. It does not connect an omitted rail, deck section or other conductive part to the bonding network.

Frequently asked questions

Does a fiberglass shell eliminate perimeter bonding?

No. A nonconductive shell changes the shell connection provisions; conductive perimeter surfaces still require the applicable treatment. NFPA’s corrected 2026 text addresses that arrangement separately.

Sources checked

Also defined as

  • Landscaping: Tying all the metal of the dock together and to ground so a fault cannot create a voltage difference in the water
  • Electrical: Tying conductive parts together so they sit at the same potential, with nothing for a body to bridge

Where this shows up

Next step: Build pool service routes

Back to the full field glossary