Field glossary · business
First-time fix rate (FTFR)
Calculate first-time fix rate as 100 × jobs resolved on their first visit ÷ all completed jobs in the same repair cohort. Count the customer's original complaint through its linked visits, even when dispatch creates another ticket. A credible percentage also identifies the callback observation window and excluded work, so closing an appointment or splitting a repair into several work orders cannot create an artificial success.
The share of service calls resolved completely on the first visit, with no return trip
Count jobs before counting successful visits
IBM defines FTFR as jobs completed on the first visit divided by total completed jobs, multiplied by 100. Under that formula, 153 first-visit resolutions among 180 completed jobs produce an FTFR of 85%. If the 27 remaining jobs each require one additional visit, there are 207 visits; dividing 153 by 207 answers a different question.
IBM's definition excludes a job from first-time success when completing it requires a follow-up visit. Link the return to the original asset and complaint even if dispatch opens a new work-order number. Otherwise, splitting a difficult repair into several tickets makes the dashboard look better while the customer still experiences repeat visits.
Keep the reporting cohort stable
Set a written policy for planned surveys, scheduled multi-visit installations, cancellations, access failures, and unrelated new faults. Report excluded counts alongside the repair cohort. A booked inspection that discovers a separate repair need should not silently become either a failed repair or an easy first-time success.
Microsoft Dynamics 365 documents a default work-order lifecycle in which all related bookings being completed or canceled allows the order to become Completed; configurable booking statuses can keep it open for follow-up. Microsoft also permits several bookings for one order. Reconcile those settings and the visit sequence with the work-order closeout record before awarding first-visit credit.
Why averaging technician percentages gives the wrong fleet result
One technician closes 9 of 10 jobs on the first visit; another closes 60 of 90. Their individual rates are 90% and 66.7%, but the combined rate is 69 of 100, or 69%. The simple average, 78.3%, gives the smaller workload equal influence and overstates performance.
Compare like work with like work before changing stocking or training. Separate routine component replacements from intermittent faults and legacy equipment diagnostics. Then review unsuccessful jobs by the reason the second visit was needed: missing part, wrong diagnosis, unavailable access, incomplete authorization, or failed workmanship. That reason code makes the percentage useful for an operational decision.
Distinctions
- Callback rate
- A callback rate starts from return visits or repeat complaints. Its denominator and observation period need not match the FTFR cohort.
Frequently asked questions
When should a first-time fix be credited?
Choose a consistent closeout date and callback observation window. Reopen or restate the result when a qualifying return occurs inside that window, and identify still-open jobs separately.
Sources checked
Also defined as
- Electrical: Share of jobs resolved in a single visit, no return trip