Field glossary · business
Core
A core return has two separate milestones: the supplier accepts the used assembly and the credit reaches the account. Shipping the removed part completes neither milestone. Exchange programs can match a return to a replacement specification or manage eligible parts by core group, so preserve the program's identifier with the invoice and receiving record. A delivered core still needs an acceptance decision and a reconciled credit.
The old part carrying a refundable charge, returned to the supplier to collect the credit
Rebuildable condition determines acceptance
Compressortech's Easy Core Return policy requires the supplied box, matching specification, no external damage and a clutch that turns. That clutch test applies to the clutch-equipped designs in its program; it is not an inspection step for a hermetic building compressor. Its broader acceptance test is whether the returned unit can be remanufactured.
Haldex's remanufacturing manual instead groups returns through its Core Acceptance List. Its processing instructions identify eligible group numbers without requiring an individual part or invoice number on that group record. Keep the group's return balance as well as shipment identity: appearance or a shared mounting pattern does not establish a creditable group.
Retain the invoice terms and return identity
Compressors Unlimited describes a commercial-compressor exchange invoice with the core charge separated from replacement cost, tax and freight. It credits the core after return, while other suppliers may defer billing. Enter the actual invoice due date and the return deadline in separate fields; those dates control different events.
Retain a photograph of the old identification plate, the replacement invoice number and the return authorization with the shipment. Record serial numbers when the program uses them. The return tag created during van-stock reconciliation should remain the same identifier in the supplier receipt, acceptance decision and credit record.
Reconcile units sent, units accepted and credits posted
Use separate statuses for awaiting removal, ready to ship, shipped, received, accepted, rejected and credited. A carrier delivery proves receipt at a destination, not acceptance or settlement. Record any rejection reason against the individual assembly, then compare the credit memo with the original core charge. That keeps a disputed return from disappearing inside a general parts credit.
Distinctions
- Warranty return
- A warranty claim concerns product failure and its coverage. A core exchange concerns the supply of a remanufacturable assembly; the same removed part can have separate paperwork for each.
- Concrete core
- A drilled sample used for strength evaluation is a different meaning of core and carries no exchange-program credit.
Field example
A shop ships 12 cores carrying equal refundable charges. The receiver accepts 10 and rejects two as outside the eligible core group. Unit acceptance is 10 / 12 = 83.3%. If only nine credits appear on the statement, one accepted core remains unreconciled in addition to the two rejected returns.
Frequently asked questions
Does a returned core always receive full credit?
The exchange program establishes eligibility, acceptable condition and credit treatment. Keep the receiving decision and credit memo together so rejection or adjustment has a traceable reason.
Sources checked
Also defined as
- Datacenter: A cylinder drilled from hardened concrete under ASTM C42 to evaluate in-place strength when cylinders are in question