FLC
FLC means full-load current. In an ordinary NEC motor-sizing worksheet, it identifies the current selected from the motor tables, which can differ from the actual motor's nameplate FLA. A drive's rated input current is a separate supply-side rating. Eaton's DG1 selection table shows why the source matters: one row lists motor-table currents of 42 A at 230 V and 46.2 A at 208 V alongside different drive input and output currents.
Table full-load current from the NEC, used to size the conductor and short-circuit device
Put the current source beside the schedule value
Separate the motor-table FLC, motor nameplate amps and drive input amps in the schedule. The motor conductor sizing guide covers the ordinary table-current case. ABB's ACH580 supplement makes the supply/output distinction explicit: the drive supplies its input-current rating, while the motor-current basis governs the output-conductor calculation. Calling all three columns FLC hides the choice being made.
NEC Article 430 is part of NFPA 70, whose current published edition is 2026. Carry the project's adopted edition in the calculation header. Manufacturer manuals that explain earlier code editions remain useful equipment instructions, but their table references and examples retain their stated edition basis.
Separate motor FLC from the drive current columns
Eaton's PowerXL DG1 manual MN040002EN, July 2015, lists 42 A at 230 V and 46.2 A at 208 V in the NEC motor-current columns of the same selection row. That row also lists separate drive input currents and output duty ratings. Reading across a drive table requires the column heading as well as the current value.
Changing the voltage basis from 230 V to 208 V changes that motor-current reference by 4.2 A, or 10 percent. Preserve the selected voltage column when copying a row into a takeoff. Do not substitute the adjacent drive-input value because it looks closer to a measured clamp reading.
Listed drive ratings can change the supply-side basis
ABB's ACH580 multiple-rating supplement, Revision A, explains the NEC 2017 and 2020 sizing basis as a minimum of 125 percent of rated drive input current on the supply side and 125 percent of motor FLC on the output side. For a drive application with a listed 32 A input rating, the supply-side minimum is 40 A; a 28 A motor-current basis yields 35 A on the output calculation.
The same ABB supplement permits specified scaled input ratings through the drive's multiple-rating listing. Its application tables tie that rating to the configured drive, motor current, and operating conditions. A lightly loaded motor does not create a reduced drive rating by measurement alone. Retain the selected manufacturer rating with the VFD installation record.
Distinctions
- Motor nameplate FLA
- An FLC entry of 42 A taken from a motor table is a calculation reference. A different current printed on the installed motor is its own rating; preserve both labels when the conductor worksheet and overload instructions use different inputs.
- Current limit
- A drive current-limit parameter controls operation. It becomes a conductor-sizing basis only through an applicable listed rating and its installation instructions.
Frequently asked questions
Does FLC always mean the NEC table number?
The abbreviation expands to full-load current, and a manufacturer's FLC can mean its motor's rated current. In the ordinary NEC table-based calculation, identify the table, voltage and motor rating. Label drive input current separately rather than treating it as another motor FLC.
Sources checked
Also defined as
- Full-load current from the NEC tables; sizes conductors and branch protection