Bump test

A bump test is a short check with a trade-specific result: gas-detector sensor and alarm response, observed motor direction, or pavement profile. MSA's ALTAIR 4XR gas-detector setup uses a 0.25 L/min regulator and cylinder concentrations matching the instrument's settings. A detector can respond to gas while reading outside its accuracy tolerance, so record the functional result separately from numerical accuracy. Identify the equipment, test method, and time with every result.

A quick before-use check that exposes the detector to gas to prove the sensors and alarms respond

Used across 3 Anvilfield field guides, most in Electrical.
Updated

Match the gas bottle, regulator, and calibration cap

Gas concentration, delivery flow, and measured response are separate entries on the test record. MSA's ALTAIR 4XR Operating Manual 10175896/12 specifies a 0.25 L/min regulator and 1/8-inch inside-diameter Superthane Ester tubing for manual bump testing. Match each configured test-gas concentration to the cylinder label. The regulator's flow marking cannot identify what gases are in the bottle.

MSA's cap-fitting instructions call for both side tabs to snap into place and the cap to be fully seated. Its calibration troubleshooting identifies cylinder contents, gas expiration, and cap security as checks before replacing a sensor after a failed span calibration. Preserve those setup details with the detector serial number in the wearable's test record; a failed response alone does not locate the fault.

Read the pass light and act on a failed test

MSA's ALTAIR 4XR manual specifies a 24-hour green bump indication after a pass, with the LED feature enabled, the detector in Normal Operation mode, and no low-battery warning or alarm. The on-screen check symbol can indicate a successful bump or calibration. Read the dated event record to identify which occurred. An absent green light alone does not establish when the last test happened.

MSA requires a bump before each day's use, so a green indication carried over from yesterday does not establish today's check. The ALTAIR 4XR reports failed channels with its bump error. ISEA's March 2010 validation statement calls for full calibration before further use of a monitor that fails a bump or calibration check; otherwise, remove it from service. Keep the original failure and the subsequent calibration result together. A repeat bump alone does not document the required corrective calibration.

Motor kickback and impeller rotation are opposite

Xylem's IM123R06 explosion-proof wastewater-pump manual, March 2019, identifies startup kickback as movement opposite to motor rotation. Its rotation check permits a few-second jog on the pumps it covers, requires restraint of the pump assembly, and prohibits hands in the suction opening.

A note saying 'housing kicked clockwise' describes reaction torque; comparing it directly with a clockwise impeller arrow would reverse the conclusion. For the MCC startup record, identify the pump model, observed part, viewing position, and required impeller direction. Keep that observation with the phase-sequence documentation so supply sequence and mechanical response remain distinguishable.

A pavement bump result needs a measurement length

A straightedge result at an asphalt joint is reproducible only when the record identifies the gauge length, placement, station, and maximum gap. Retain those fields for the repeat measurement after correction. A surface-profile result establishes geometry; a density result requires its own measurement. Neither belongs in a gas-detector or motor-direction acceptance column.

Frequently asked questions

Does the detector's power-on alarm test replace test gas?

MSA lists the startup LCD, light, horn, and vibration checks separately from the gas challenge. Those startup indications verify the alarm hardware; applying gas additionally exercises the sensing path. Keep both checks in the detector's daily record.

Does a local alarm prove the remote notification arrived?

MSA states that losing the Bluetooth communication link prevents alarms from reaching linked devices. Record the receiving system and notification arrival separately from the detector's local response.

Sources checked

Also defined as

  • A brief power application to an uncoupled motor to confirm rotation direction
  • A momentary jog of the motor to observe shaft direction, done uncoupled

Where this shows up