Galvalume
On a Galvalume order, AZ50 and AZ55 identify the aluminum-zinc coating over the steel, with minimum triple-spot average coating weights of 0.50 and 0.55 ounce per square foot across both faces. The steel grade, thickness and finish need their own order fields. An AZ55 certificate does not promise exactly 10 percent more coating on every delivered panel, and the designation supplies neither a steel gauge nor a roof-life rating.
An aluminum-zinc alloy coating on steel, roughly 55 percent aluminum, for corrosion resistance
What AZ50 and AZ55 mean on the coil certificate
GalvInfoNote 1.1, revision 3.0, explains that AZ designations specify minimum average coating weights from a triple-spot test, totaling both sheet faces. AZ50 sets that minimum at 0.50 ounce per square foot and AZ55 at 0.55. The Galvalume Sheet Producers of North America confirm the combined-face basis; assigning either amount to each face doubles it.
The AZ55 minimum is 10 percent higher than the AZ50 minimum. Actual test results can exceed either minimum, so the designation alone cannot establish the difference between two delivered lots. Request the coating test results when a comparison needs measured mass.
Specify the alloy type as well as ASTM A792
ASTM A792/A792M-25a includes Type 1 aluminum-zinc-silicon coatings and Type 2 aluminum-zinc-magnesium-silicon coatings. Consequently, an A792 reference alone does not identify the coating chemistry. The standard also distinguishes steel designations and mechanical properties from coating-weight requirements.
Record the full standard edition, coating type, AZ designation, base-steel grade, thickness and finish. Carry those fields into the metal roof type selection and standing-seam submittal. A change in alloy or substrate grade is a material substitution even when the new panel has the same profile and color.
Calculate designation weights without inventing a lot weight
Multiplying 1,000 square feet of unfolded sheet by the AZ50 and AZ55 designation minima gives 500 and 550 ounces, a difference of 50 ounces or 3.125 pounds. These are calculations at the specified average minima, not measurements of coating on a shipment. Use developed sheet area, since ribs and seams consume material beyond the panel's installed cover width.
Match the certificate to the coil or panel lot, then separate base-steel thickness, coating-test results and paint identification on the receiving form. A total-thickness measurement over paint combines several layers and cannot by itself identify the metallic-coating weight.
Corrosion beneath timber supports
The Galvalume Sheet Producers of North America advise against both direct contact with pressure-treated or wet lumber and drainage from treated lumber onto Galvalume. Their guidance identifies moisture and chemicals leaching from the timber as the corrosion mechanism, including under rooftop equipment mounted on landscape ties.
Inspect the contact footprint and runoff path when deterioration follows the outline of a timber support. Replace the incompatible support arrangement with the panel supplier's compatible mounting detail; treating the visible stain alone leaves the exposure in place.
Distinctions
- Galvalume Plus and roll-forming oil
- Wheeling-Nippon Steel says the acrylic treatment on its Plus sheet eliminates the need for oil during roll forming and reduces handling marks. Record Plus as a surface treatment, alongside the underlying AZ designation, when matching a replacement coil.
- AZ and G coating designations
- GalvInfoNote 1.1 explains that equal coating weight does not mean equal coating thickness for aluminum-zinc and galvanized zinc coatings because their densities differ. AZ60 and G60 are therefore not a thickness or corrosion-performance equivalence.
Frequently asked questions
Does AZ55 mean 55-gauge steel?
AZ55 identifies the coating-weight designation. Steel thickness and structural grade must appear separately, along with the panel manufacturer's span and attachment requirements.
Sources checked
- Galvalume Sheet Producers of North America: AZ50 and AZ55 coating designations, June 23, 2023
- ASTM A792/A792M-25a: coated steel sheet, public scope and material classifications
- Galvalume Sheet Producers of North America: contact with pressure-treated and wet lumber
- Wheeling-Nippon Steel: Galvalume and Galvalume Plus product information
- GalvInfoNote 1.1, revision 3.0, August 2019: coating-designation minima and triple-spot tests