Field glossary · component
Standing seam
On standing-seam roofing, the raised panel joint is also the geometry that replacement clips and accessory clamps must fit. McElroy's Medallion-Lok, for example, combines a 1.75-inch rib with three different coverage widths. Identify the cross-section and the concealed clip or covered fastening flange, then trace movement from the fixed point before adding a curb, clamp, or replacement panel.
A metal panel system with a raised, interlocking seam and concealed main attachments; movement is controlled by the clip or flange design
Measure the profile before selecting a replacement part
McElroy Metal's Medallion-Lok product data identifies a 1.75-inch rib and 12-, 16-, or 18-inch coverage widths. A rib-height measurement alone therefore does not uniquely identify the panel. Measure coverage between matching points on adjacent ribs, photograph the seam's sides and top, and retrieve a panel tag, submittal, or accessible edge cross-section.
Match replacement clips and accessory clamps to that identified shape. The standing-seam installation guide establishes the panel system; a service visit should preserve its designation in the repair record. A clamp that visibly grips a rib still needs the profile-specific attachment detail and tested load information for its intended use.
Read movement from the fixed point to the free edge
McElroy Metal's Technical Bulletin 99-405-16 uses about 1.5 inches of total movement for a 130-foot steel-panel run subjected to a 150°F temperature change. Its movement length runs from the fixed point to the floating edge, including floating end laps, rather than stopping at an individual panel splice.
For installation at moderate panel temperature, McElroy divides the 1.5-inch travel into about 0.75 inch in each direction. That split is an assumption of this steel-panel example, not a universal clip-centering rule. Check the installation temperature against the project's temperature range when locating the clip's starting position.
Mark the approved point of fixity on the roof sketch. Then follow the movement path past each penetration and accessory. Deformed clip slots, displaced trim, and recurring distortion around a stationary curb identify places where the roof's moving and stationary parts are interacting.
Keep equipment supports and weather seals coordinated
The Metal Construction Association's Metal Roofing A to Z distinguishes a stationary duct or structural support curb from the flashing curb that moves with the roof. The moving flashing curb needs clearance around the stationary duct or inner curb, with a counterflashing connection that accommodates their relative movement. When equipment is supported on approved seam clamps, the equipment and roof-mounted curb can move together.
A new solar mount or snow-retention rail adds loads and connections to the existing panel system. Trace where the accessory moves and where its load reaches the building. Keep a close photograph of the completed clamp or bracket alongside a wider view showing its position relative to panel splices and fixed points.
Distinctions
- Nail-strip panel
- The seam covers a fastening flange instead of a separate clip. Movement depends on the flange slots, fasteners, and product detail.
- Standing seam in ductwork
- Duct fabrication also uses a raised seam for joining and stiffening sheet metal. That shop joint does not identify a tested roof assembly.
Metal-roof service routes start with the buildings carrying that roof material; PorchRocket Ground Control delivers the selected addresses in a spreadsheet within 48 hours.
Frequently asked questions
Can several short panels eliminate thermal movement?
Floating end laps can make several panel lengths act as one moving run. McElroy measures the full distance from fixity to the floating edge in its movement bulletin.
Does a straight panel pan prove the roof is correctly attached?
Appearance does not reveal hidden clip engagement or available travel. Use the system documents and accessible connection details to establish those conditions.
Sources checked
Also defined as
- A raised panel joint in a roof with concealed clips or covered fastening flanges