ANVILFIELD Try FieldOS

Field glossary · component

Exposed / through-fastener panel

An exposed or through-fastener panel has visible primary screws through the metal into its support. Union's MasterRib uses 36-inch net coverage, 3/4-inch major ribs, and a 3:12 minimum pitch in its May 2025 trim guide. During a repair survey, distinguish screws engaging the deck or framing from side-lap screws joining neighboring sheets; only the former establish the primary attachment to the structure.

A metal panel screwed through its face, where the screws and their rubber washers are the common leak

Used across 2 Anvilfield field guides, most in Roofing.
Updated

Use the rib profile to identify the panel

Union Corrugating's MasterRib installation manual identifies a 36-inch coverage width and 3/4-inch-high major ribs spaced 9 inches apart. These dimensions provide a starting point for matching repair panels, closures, and trim. Measure the repeated profile across several ribs instead of relying on the appearance of one corrugation.

Union's May 2025 MasterRib trim guide lists 26- and 29-gauge steel options and a minimum roof pitch of 3:12. Gauge and pitch belong to that product's specification; a similar-looking panel from another line can have different span and application limits. Preserve the panel designation with the roof survey.

Inspect support engagement and washer seating together

Union's MasterRib manual, revision 10/11, directs its wood screws into the panel flat at the supporting purlins. It describes a separate lap screw at the rib crown to secure the side lap. A lap fastener that connects neighboring sheets is not evidence that either sheet has engaged the structural support below.

Follow the screw row across the actual framing locations during inspection. A missed purlin, stripped hole, or substituted screw changes the connection even when the head remains flush with the panel. Record the substrate and fastener type before estimating a replacement quantity.

Union warns against overdriving MasterRib fasteners because the resulting metal dimple can collect water and leak. The washer should seat securely against the panel without distorting the sheet. Inspect seating and the surrounding metal rather than assigning one torque setting to every substrate and screw.

Distinctions

Standing seam
Standing-seam panels use their specified seam and clip or concealed attachment arrangements. Identify the primary connection beneath or through the panel rather than classifying it by rib shape.
Stitch screw
A stitch screw joins sheet edges or trim. Its job and substrate differ from those of a structural screw that transfers panel loads into framing.

Field example

At MasterRib's published 36-inch net coverage, a 180-foot dimension across the panel ribs requires 60 panel widths before edge cuts. This is a width count, not a roof-area or panel-length calculation. Record the slope length separately, along with any end laps.

The metal roof comparison describes the attachment families. A replacement order also needs the measured rib profile, metal thickness, closure profile, panel length, and the support-specific screw detail.

Frequently asked questions

Can a loose screw always be replaced with a larger one?

The replacement must restore the specified connection in the actual substrate. Identify whether the failure is a stripped support, missed framing, damaged sheet, or failed washer before selecting the repair detail.

Why does the replacement closure not fit?

Closures follow the panel profile, including rib height and spacing. Match the cross-section as well as the nominal width when ordering closures.

Sources checked

Also defined as

  • A panel screwed through its face with a gasketed washer at each hole, the common leak point

Where this shows up

Next step: Find metal roof accounts

Back to the full field glossary